BEND PULLEY DRG NO PE 474 -3,SNUB PULLEY DRG NO PE 474 - 2,BEND PULLEY DRG NO PE 444-A5 -4,RETURN P
Bokaro Steel Plant
Bid Publish Date
16-Jul-2026, 11:24 am
Bid End Date
04-Aug-2026, 2:00 pm
Location
Progress
Quantity
9
Category
BEND PULLEY DRG. NO. PE 474 - 3
Bid Type
Two Packet Bid
The procurement is issued by Bokaro Steel Plant under the Steel Authority of India Limited (SAIL) to supply seven pulley components as per the listed drawings: BEND PULLEY PE474-3, SNUB PULLEY PE474-2, BEND PULLEY PE474-4 (A5), RETURN PULLEY PE474-5, TAIL PULLEY PE474-1, DRIVE BEND PULLEY PE444-C1-5, and BEND PULLEY PE444-C1-4. No explicit start/end dates or estimated value are provided. The tender includes a 25% quantity-within-contract option and a complex delivery-time formula. ATC references require bidders to follow item drawings and special terms. Location details are not specified in the data.
Pulley components: BEND PULLEY PE474-3, SNUB PULLEY PE474-2, BEND PULLEY PE474-4 (A5), RETURN PULLEY PE474-5, TAIL PULLEY PE474-1, DRIVE BEND PULLEY PE444-C1-5, BEND PULLEY PE444-C1-4
Drawings referenced: PE 474, PE 444 series
Quantity/BoQ: Not disclosed in extract; tender includes 7 items
Delivery terms: option to alter quantity up to 25% during contract, delivery-time formula with minimum 30 days
Standards/quality: Not specified in data; must comply with ATC-documented terms and item drawings
Testing/acceptance: Not detailed; follow ATC testing/acceptance clauses
Warranty/AMC: Not specified in data; refer ATC for post-delivery support
Quantity can be adjusted by up to 25% during and after order placement
Delivery timelines extend with the option clause, minimum 30 days
Bid must follow item drawings PE474/PE444 and uploaded ATC terms
Payment terms are defined in the ATC; ensure compliance with EMD and invoicing as per bidder terms.
Delivery time calculated per (increase in quantity / original quantity) × original delivery period, minimum 30 days.
Penalties/LD details to be provided in ATC documents; not disclosed in the extract.
Experience in supplying pulley assemblies or machine components similar to PE474/PE444 drawings
Valid GST registration and financial stability indicators
Compliance with ATC documents and item drawings PE474/PE444
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
BEND PULLEY DRG. NO. PE 474 - 3 , SNUB PULLEY DRG. NO. PE 474 - 2 , BEND PULLEY DRG. NO. PE 444-A5 - 4 , RETURN PULLEY DRG. NO. PE 474 - 5 , TAIL PULLEY DRG. NO. PE 474 1 , DRIVE BEND PULLEY DRG.NO. PE 444-C1-5 , BEND PULLEY DRG.NO. PE 444 C1 - 4
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
West Singhbhum
Delivery Pincodes
833213
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Avinash Kumar | 833213,GUA ORE MINES, SAIL/JHARKHAND GROUP OF MINES, AT+POST: GUA, DISTRICT: WEST SINGHBHUM, STATE: JHARKHAND, PIN: 833213., West Singhbhum, 833213 | West Singhbhum | Jharkhand | 833213 | 2 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Bokaro Steel Plant
Bokaro Steel Plant
BOKARO, JHARKHAND
India Optel Limited
DEHRADUN, UTTARAKHAND
Rourkela Steel Plant
SUNDERGARH, ODISHA
Rourkela Steel Plant
SUNDERGARH, ODISHA
Tender Results
Loading results...
BEND PULLEY DRG. NO. PE 474 - 3
BEND PULLEY DRG. NO. PE 474 - 3
SNUB PULLEY DRG. NO. PE 474 - 2
SNUB PULLEY DRG. NO. PE 474 - 2
BEND PULLEY DRG. NO. PE 444-A5 - 4
BEND PULLEY DRG. NO. PE 444-A5 - 4
RETURN PULLEY DRG. NO. PE 474 - 5
RETURN PULLEY DRG. NO. PE 474 - 5
TAIL PULLEY DRG. NO. PE 474 1
TAIL PULLEY DRG. NO. PE 474 1
DRIVE BEND PULLEY DRG.NO. PE 444-C1-5
DRIVE BEND PULLEY DRG.NO. PE 444-C1-5
BEND PULLEY DRG.NO. PE 444 C1 - 4
BEND PULLEY DRG.NO. PE 444 C1 - 4
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | BEND PULLEY DRG. NO. PE 474 - 3 | BEND PULLEY DRG. NO. PE 474 - 3 | 2 | pieces | [email protected] | 90 | |
| 2 | SNUB PULLEY DRG. NO. PE 474 - 2 | SNUB PULLEY DRG. NO. PE 474 - 2 | 1 | pieces | [email protected] | 90 | |
| 3 | BEND PULLEY DRG. NO. PE 444-A5 - 4 | BEND PULLEY DRG. NO. PE 444-A5 - 4 | 1 | pieces | [email protected] | 90 | |
| 4 | RETURN PULLEY DRG. NO. PE 474 - 5 | RETURN PULLEY DRG. NO. PE 474 - 5 | 2 | pieces | [email protected] | 90 | |
| 5 | TAIL PULLEY DRG. NO. PE 474 1 | TAIL PULLEY DRG. NO. PE 474 1 | 1 | pieces | [email protected] | 90 | |
| 6 | DRIVE BEND PULLEY DRG.NO. PE 444-C1-5 | DRIVE BEND PULLEY DRG.NO. PE 444-C1-5 | 1 | pieces | [email protected] | 90 | |
| 7 | BEND PULLEY DRG.NO. PE 444 C1 - 4 | BEND PULLEY DRG.NO. PE 444 C1 - 4 | 1 | pieces | [email protected] | 90 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar pulley component supply
Financial statements (latest balance sheet and profit & loss)
EMD/Security deposit documentation as per ATC
Technical bid documents and compliance with drawings PE474/PE444
OEM authorisation or manufacturer qualification (if applicable)
Product drawings compliance certificates per ATC
Any other documents specified in the uploaded ATC documents
Bidders must follow the uploaded ATC documents and quote strictly as per item drawings PE474/PE444. Ensure eligibility with GST, PAN, and financials, submit EMD, and provide OEM authorisations if applicable. Prepare technical bid aligned to seven pulley items and complete BoQ details where available.
Required documents include GST registration, PAN card, experience certificates for similar pulley supply, financial statements, EMD documentation, technical bid aligned to PE474/PE444 drawings, OEM authorisations, and compliance certificates per ATC. Ensure submission of all documents through the portal as per ATC instructions.
The items are: BEND PULLEY PE474-3, SNUB PULLEY PE474-2, BEND PULLEY PE474-4 (A5), RETURN PULLEY PE474-5, TAIL PULLEY PE474-1, DRIVE BEND PULLEY PE444-C1-5, BEND PULLEY PE444-C1-4. Bid submission must comply with corresponding drawings and special terms in ATC.
The purchaser may increase or decrease quantity up to 25% of bid/contract quantity. Delivery time adjustments use the formula (Increase quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Extended delivery allowed up to original delivery period under option clauses.
Standards are defined in the ATC; bidders must reference item drawings PE474/PE444 and attach compliance certificates as per uploaded ATC. While specific standards are not listed in the extract, ISI/ISO alignment may be addressed in ATC; verify with the uploaded documents before submission.
EMD details and evaluation criteria are provided in the ATC documents, not in the extract. Submit the EMD as per ATC instructions, and ensure all required technical and financial bids align with the drawings PE474/PE444 to qualify for evaluation.
Carefully study the seven pulley drawings (PE474-3, PE474-2, PE474-4 A5, PE474-5, PE474-1, PE444-C1-5, PE444-C1-4). Align material, dimensions, fit, and surface finish with drawings, and attach conformity certificates. Ensure the ATC terms are met in the technical bid to avoid rejection.
Bharat Heavy Electricals Limited (bhel)
📍 BHOPAL, MADHYA PRADESH
Armoured Vehicles Nigam Limited
📍 THANE, MAHARASHTRA
N/a
📍 KHERI, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 BHOPAL, MADHYA PRADESH
Salem Steel Plant
📍 SALEM, TAMIL NADU
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS