Timing Belt Out Side Cover,Driven Disc,Knuckle Brg,Clutch Booster Assy,Pressure Plate Assy,Brake Sh
Indian Army
SONITPUR, ASSAM
Bid Publish Date
29-Jan-2026, 5:02 pm
Bid End Date
09-Feb-2026, 9:00 am
Location
Progress
Quantity
24
Category
Roller
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a procurement package covering nine items including rollers, distributor pumps, lever shafts, cam plates, cross discs, rollers, supporting plates, outside mirrors and relay valves in Kupwara, Jammu & Kashmir 193221. The BOQ indicates 9 total items with unspecified quantities, and an estimated contract value is not disclosed. A flexible quantity option allows ±25% changes during and after contract award, with delivery timelines linked to the original and extended periods. Bidders must prepare vendor code documentation and adhere to advance sample approval procedures. The tender emphasizes sample conformity, modification cycles, and potential contract termination for major deviations, ensuring bulk supply matches approved specifications while allowing sample-based adjustments. The opportunity targets suppliers with mechanical component manufacturing and supply capabilities within a defense procurement framework, and requires readiness for post-award sample validation and compliance with delivery-time adjustments.
EMD/financial guarantees: not specified; procurement relies on standard GST/PAN and EFT documents
Delivery flexibility: ±25% quantity option; delivery period adjusts with sample approval timelines
Advance sample process: 5 samples within 5 days; modifications provided within 5 days; bulk supply aligned to approved sample
Not specified in the buyer terms; standard tender practice may apply, with advancement possible against approved samples
Delivery period recalculated if sample approval is delayed; option to increase quantity up to 25% during and after contract; minimum 30 days for additional time
Potential contract termination for major deviations from contract specifications or sample non-conformity; no LD rate specified
Applicants must submit PAN Card and GSTIN with bid
EFT Mandate and cancelled cheque are required for vendor code setup
Experience in supplying mechanical components (rollers, pumps, shafts) is expected
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SONITPUR, ASSAM
Indian Army
GURDASPUR, PUNJAB
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Indian Army
TINSUKIA, ASSAM
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Roller | LV7/TMB | 8 | nos | buyer@236 | 16 |
| 2 | Assy Distributor Pump | LV7/TMB | 2 | nos | buyer@236 | 16 |
| 3 | Lever Shaft | LV7/TMB | 2 | nos | buyer@236 | 16 |
| 4 | Cam Plate | LV7/STLN | 1 | nos | buyer@236 | 16 |
| 5 | Cross Disc | LV7/STLN | 1 | nos | buyer@236 | 16 |
| 6 | Rollers | LV7/STLN | 6 | nos | buyer@236 | 16 |
| 7 | Supporting Plate | LV7/STLN | 2 | nos | buyer@236 | 16 |
| 8 | Out Side Mirror | LV7/STORME | 1 | nos | buyer@236 | 16 |
| 9 | Relay Valve | LV7/STLN | 1 | nos | buyer@236 | 16 |
Discover companies most likely to bid on this tender
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate along with vendor code creation documents. Ensure advance sample submissions (5 samples within 5 days of award) and conform to the 25% quantity option. Delivery schedules depend on sample approval and contract terms.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, and vendor code creation papers. Prepare any OEM authorizations if applicable and ensure readiness to provide 5 advance samples within 5 days of award and adhere to approval timelines.
Categories include rollers, distributor pumps, lever shafts, cam plates, cross discs, rollers, supporting plates, outside mirrors, and relay valves. The BOQ lists 9 items; exact quantities are not disclosed, requiring bidders to align with approved sample specifications.
The option clause allows ±25% quantity changes during contract; delivery period adjusts using (increased quantity ÷ original quantity) × original delivery period, with a minimum 30 days, and extensions possible during extended periods.
Successful bidders must submit 5 advance samples within 5 days of award. The buyer provides approval or a list of modification within 5 days. Bulk supply must follow the approved sample; delays in buyer approvals may extend delivery timelines without LD penalties.
Delivery terms hinge on approved samples; payment terms are not specified in the tender. Bidder should anticipate standard government terms and confirm payment arrangements during post-award negotiations alongside delivery schedules.
No explicit standards (e.g., ISI/ISO) are listed in the available data. Bidders should align to buyer specifications during sample approval and await any standardization directives in the contract, ensuring equipment compatibility with defense procurement norms.
Indian Army
Indian Army
📍 BARDHAMAN, WEST BENGAL
Indian Army
Armed Forces Tribunal
📍 LEH, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS