TenderDekho Logo
GEM

Procurement Opportunity: PRESSURE SWITCH 7 POINT 5 35 KG FLP,CAPACITOR BOX 440V 3 KVAR,CAPACITOR BOX 440V 5 KVAR,CAPACITOR B in GORAKHPUR, UTTAR PRADESH

Bid Publish Date

26-Nov-2025, 3:46 pm

Bid End Date

08-Dec-2025, 4:00 pm

Value

₹23,68,779

Progress

RA
Issue26-Nov-2025, 3:46 pm
Reverse AuctionCompleted
Award11-Feb-2026, 1:18 am
Explore all 4 tabs to view complete tender details

Quantity

7231

Category

LED FLOOD LIGHT 300W NON FLP

Bid Type

Two Packet Bid

Categories 79

Hindustan Petroleum Corporation Ltd invites bids for PRESSURE SWITCH 7 POINT 5 35 KG FLP, CAPACITOR BOX 440V 3 KVAR, CAPACITOR BOX 440V 5 KVAR, CAPACITOR B in GORAKHPUR, UTTAR PRADESH. Quantity: 7231. Submission Deadline: 08-12-2025 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8628158.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

B7G1X43259 PRESSURE SWITCH SHYAM SEL MAA1030

Bharat Heavy Electricals Limited (bhel)

Posted: 28 November 2024
Closed: 9 December 2024
GEM

20A SWITCH.,16A SOCKET.,8 MODULE SURFACE PLASTIC BOX,8 MODULAR PLATE WITH FRAME.,6 MODULE SURFACE P

Bharat Electronics Limited (bel)

KRISHNA, ANDHRA PRADESH

Posted: 25 April 2025
Closed: 5 May 2025
GEM

Pressure Switch NO 5 BAR DOT 4,S.E.Hub 505 Disc Braked,Cable,Hand Brake Cable,BRIDGE LIFTING CYLIND

Ai Airport Services Limited

Posted: 2 July 2025
Closed: 19 July 2025
GEM

Pressure switch 1,Pressure switch 2,Pressure switch 3,Pressure switch 4,Pressure switch 5,Pressure

Oil And Natural Gas Corporation Limited

GANDHI NAGAR, GUJARAT

Posted: 24 June 2025
Closed: 15 July 2025
GEM

B7G1Y65322 HY7314001383 PRESSURE SWITCH,B7G1Y65322 HY7314001871 PRESSURE SWITCH

Bharat Heavy Electricals Limited (bhel)

MEDAK, TELANGANA

Posted: 2 August 2025
Closed: 18 August 2025
GEM

Bill of Quantities (BOQ) 150 Items Sign in for GEM prices

#1

PRESSURE SWITCH 7 POINT 5 35 KG FLP

PRESSURE SWITCH 7 POINT 5 35 KG FLP

1 each Delivery: 30 days
#2

CAPACITOR BOX 440V 3 KVAR

CAPACITOR BOX 440V 3 KVAR

1 each Delivery: 30 days
#3

CAPACITOR BOX 440V 5 KVAR

CAPACITOR BOX 440V 5 KVAR

1 each Delivery: 30 days
#4

CAPACITOR BOX 440V 10 KVAR

CAPACITOR BOX 440V 10 KVAR

1 each Delivery: 30 days
#5

CAPACITOR BOX 440V 12 POINT 5 KVAR

CAPACITOR BOX 440V 12 POINT 5 KVAR

2 each Delivery: 30 days
#6

CAPACITOR BOX 440V 25 KVAR

CAPACITOR BOX 440V 25 KVAR

5 each Delivery: 30 days
#7

SOLENOID VALVE 230 V AC

SOLENOID VALVE 230 V AC

3 each Delivery: 30 days
#8

24V SOLENOID COIL ROTEX

24V SOLENOID COIL ROTEX

2 each Delivery: 30 days
#9

RCCB 30 MA 63 A

RCCB 30 MA 63 A

3 each Delivery: 30 days
#10

RCCB 2 POLE 30AMPS

RCCB 2 POLE 30AMPS

5 each Delivery: 30 days
#11

HAND GLOVE 1 POINT 1KV RBR

HAND GLOVE 1 POINT 1KV RBR

2 each Delivery: 30 days
#12

HAND GLOVE 11KV RBR

HAND GLOVE 11KV RBR

1 each Delivery: 30 days
#13

CABLE JOINT KIT 3CX25MM2

CABLE JOINT KIT 3CX25MM2

1 each Delivery: 30 days
#14

CABLE JOINT KIT 4CX2 POINT 5MM2

CABLE JOINT KIT 4CX2 POINT 5MM2

1 each Delivery: 30 days
#15

TERMINAL CONNECTOR 25A ELMEX

TERMINAL CONNECTOR 25A ELMEX

10 each Delivery: 30 days
#16

TERMINAL CONNECTOR 16A ELMEX

TERMINAL CONNECTOR 16A ELMEX

10 each Delivery: 30 days
#17

MNX 12 CONTACTOR

MNX 12 CONTACTOR

5 each Delivery: 30 days
#18

MNX 18 CONTACTOR

MNX 18 CONTACTOR

15 each Delivery: 30 days
#19

MNX 45 CONTACTOR

MNX 45 CONTACTOR

6 each Delivery: 30 days
#20

MNX 110 CONTACTOR L AND T

MNX 110 CONTACTOR L AND T

3 each Delivery: 30 days
#21

MNX 140 CONTACTOR L AND T

MNX 140 CONTACTOR L AND T

3 each Delivery: 30 days
#22

L AND T CONTACTOR ML340AAC3 415V 50HZ

L AND T CONTACTOR ML340AAC3 415V 50HZ

3 each Delivery: 30 days
#23

L AND T CONTACTOR ML12 300A

L AND T CONTACTOR ML12 300A

2 each Delivery: 30 days
#24

L AND T MOC 50 CONTACTOR

L AND T MOC 50 CONTACTOR

3 each Delivery: 30 days
#25

3TF56 SIEMENS CONTACTOR

3TF56 SIEMENS CONTACTOR

2 each Delivery: 30 days
#26

RELAY ELE THERMAL 8 12A 440V

RELAY ELE THERMAL 8 12A 440V

20 each Delivery: 30 days
#27

RELAY ELE THERMAL 5 POINT 5 8A 440V

RELAY ELE THERMAL 5 POINT 5 8A 440V

15 each Delivery: 30 days
#28

RELAY ELE THERMAL 48 57A 440V

RELAY ELE THERMAL 48 57A 440V

3 each Delivery: 30 days
#29

MN RELAY 6 TO 10

MN RELAY 6 TO 10

10 each Delivery: 30 days
#30

MN RELAY 9 TO 15

MN RELAY 9 TO 15

15 each Delivery: 30 days
#31

LINE MONITORING RELAY

LINE MONITORING RELAY

10 each Delivery: 30 days
#32

GIC EARTH LEAKAGE RELAY

GIC EARTH LEAKAGE RELAY

8 each Delivery: 30 days
#33

OMRON 230V 12A 8PIN RELAY WITH BASE

OMRON 230V 12A 8PIN RELAY WITH BASE

10 each Delivery: 30 days
#34

MN2 1 POINT 4 2 POINT 3 A THERMAL RELAY L AND T

MN2 1 POINT 4 2 POINT 3 A THERMAL RELAY L AND T

2 each Delivery: 30 days
#35

MN RELAY 14 23 L AND T THERMAL RELAY

MN RELAY 14 23 L AND T THERMAL RELAY

4 each Delivery: 30 days
#36

MN RELAY 3 5 L AND T THERMAL RELAY

MN RELAY 3 5 L AND T THERMAL RELAY

5 each Delivery: 30 days
#37

MN RELAY 2 3 POINT 3 L AND T THERMAL RELAY

MN RELAY 2 3 POINT 3 L AND T THERMAL RELAY

5 each Delivery: 30 days
#38

SILICA GEL

SILICA GEL

2 kg Delivery: 30 days
#39

SILICA GEL JAR

SILICA GEL JAR

1 each Delivery: 30 days
#40

HYLAM SHEET THK 2MM

HYLAM SHEET THK 2MM

15 sqmm Delivery: 30 days
#41

FUSE LV DIN 200AP HN

FUSE LV DIN 200AP HN

10 each Delivery: 30 days
#42

FUSE LV DIN 125AP HN

FUSE LV DIN 125AP HN

9 each Delivery: 30 days
#43

FUSE LV DIN 100AP HN

FUSE LV DIN 100AP HN

9 each Delivery: 30 days
#44

FUSE LV DIN HRC 20A

FUSE LV DIN HRC 20A

50 each Delivery: 30 days
#45

FUSE LV DIN HRC 25A

FUSE LV DIN HRC 25A

30 each Delivery: 30 days
#46

FUSE LV DIN HRC 32A

FUSE LV DIN HRC 32A

30 each Delivery: 30 days
#47

FUSE LV DIN HRC 63A

FUSE LV DIN HRC 63A

30 each Delivery: 30 days
#48

FUSE LV CYL HRC 20AP HF

FUSE LV CYL HRC 20AP HF

30 each Delivery: 30 days
#49

FUSE LV CYL HRC 16AP HF

FUSE LV CYL HRC 16AP HF

100 each Delivery: 30 days
#50

FUSE LV CYL HRC 10AP HF

FUSE LV CYL HRC 10AP HF

100 each Delivery: 30 days
#51

NS TYPE FUSE 2A

NS TYPE FUSE 2A

60 each Delivery: 30 days
#52

NS TYPE FUSE 4A

NS TYPE FUSE 4A

60 each Delivery: 30 days
#53

NS TYPE FUSE 6A

NS TYPE FUSE 6A

50 each Delivery: 30 days
#54

NS TYPE FUSE 10A

NS TYPE FUSE 10A

30 each Delivery: 30 days
#55

NS TYPE FUSE 16A

NS TYPE FUSE 16A

30 each Delivery: 30 days
#56

NS TYPE FUSE 20A

NS TYPE FUSE 20A

30 each Delivery: 30 days
#57

L AND T HN HRC FUSE 160 A

L AND T HN HRC FUSE 160 A

6 each Delivery: 30 days
#58

HF HRC FUSE 63 A

HF HRC FUSE 63 A

20 each Delivery: 30 days
#59

LV HRC FUSE 63 A

LV HRC FUSE 63 A

6 each Delivery: 30 days
#60

HF HRC FUSE 32 A

HF HRC FUSE 32 A

30 each Delivery: 30 days
#61

11KVA BARREL FUSE DROP OUT SET

11KVA BARREL FUSE DROP OUT SET

10 each Delivery: 30 days
#62

CROCODILE CLIP

CROCODILE CLIP

10 each Delivery: 30 days
#63

ELECTRICAL PENEL LOCK

ELECTRICAL PENEL LOCK

50 each Delivery: 30 days
#64

EARTHING CABLE 6 SQMM

EARTHING CABLE 6 SQMM

2,000 meter Delivery: 30 days
#65

LUG SOCKET TYPE 95MM2 KSE

LUG SOCKET TYPE 95MM2 KSE

20 each Delivery: 30 days
#66

LUG SOCKET TYPE 35MM2

LUG SOCKET TYPE 35MM2

50 each Delivery: 30 days
#67

LUG SOCKET TYPE 25MM2

LUG SOCKET TYPE 25MM2

50 each Delivery: 30 days
#68

LUG SOCKET TYPE 16MM2

LUG SOCKET TYPE 16MM2

600 each Delivery: 30 days
#69

LUG SOCKET TYPE 10MM2

LUG SOCKET TYPE 10MM2

200 each Delivery: 30 days
#70

LUG SOCKET TYPE 4MM2

LUG SOCKET TYPE 4MM2

200 each Delivery: 30 days
#71

LUG SOCKET TYPE 6MM2

LUG SOCKET TYPE 6MM2

1,000 each Delivery: 30 days
#72

LUG BULLET CU 6MM2 105

LUG BULLET CU 6MM2 105

200 each Delivery: 30 days
#73

LUG BULLET CU 4MM2 103

LUG BULLET CU 4MM2 103

200 each Delivery: 30 days
#74

LUG BULLET CU 10MM2 107

LUG BULLET CU 10MM2 107

50 each Delivery: 30 days
#75

70 SQMM COPPER LUG RING TYPE

70 SQMM COPPER LUG RING TYPE

20 each Delivery: 30 days
#76

95 SQMM COPPER LUG RING TYPE

95 SQMM COPPER LUG RING TYPE

20 each Delivery: 30 days
#77

70 SQMM ALUMINIUM LUG RING TYPE

70 SQMM ALUMINIUM LUG RING TYPE

20 each Delivery: 30 days
#78

120 SQMM ALUMINIUM LUG RING TYPE

120 SQMM ALUMINIUM LUG RING TYPE

20 each Delivery: 30 days
#79

HSS HOLE SAW CUTTER 19 MM

HSS HOLE SAW CUTTER 19 MM

2 each Delivery: 30 days
#80

HSS HOLE SAW CUTTER 16 MM

HSS HOLE SAW CUTTER 16 MM

1 each Delivery: 30 days
#81

HT RUBBER MAT 3 MM

HT RUBBER MAT 3 MM

5 each Delivery: 30 days
#82

36 W LED TUBE

36 W LED TUBE

20 each Delivery: 30 days
#83

FLP HOOTER

FLP HOOTER

3 each Delivery: 30 days
#84

NIGHTSTICK XPR 5522GMX FLP torch

NIGHTSTICK XPR 5522GMX FLP torch

1 each Delivery: 30 days
#85

SS ALLEN SCREW 6MM

SS ALLEN SCREW 6MM

50 each Delivery: 30 days
#86

SS ALLEN SCREW 5MM

SS ALLEN SCREW 5MM

50 each Delivery: 30 days
#87

DIGITAL MULTIMETER 13S

DIGITAL MULTIMETER 13S

1 each Delivery: 30 days
#88

CIE 444 INSULATION TESTER

CIE 444 INSULATION TESTER

1 each Delivery: 30 days
#89

EARTH RESISTANCE TESTER

EARTH RESISTANCE TESTER

1 each Delivery: 30 days
#90

FLP GLAND REDUCER 25 19

FLP GLAND REDUCER 25 19

20 each Delivery: 30 days
#91

FLP GLAND REDUCER M25 M20

FLP GLAND REDUCER M25 M20

30 each Delivery: 30 days
#92

FLP GLAND 19MM

FLP GLAND 19MM

120 each Delivery: 30 days
#93

FLP GLAND 32MM

FLP GLAND 32MM

2 each Delivery: 30 days
#94

FLP GLAND M25 21MM OD

FLP GLAND M25 21MM OD

20 each Delivery: 30 days
#95

FLP GLAND M20 19MM OD

FLP GLAND M20 19MM OD

25 each Delivery: 30 days
#96

3 4 ET 21MM OD FLP GLAND

3 4 ET 21MM OD FLP GLAND

50 each Delivery: 30 days
#97

3 4 ET 12MM OD FLP GLAND

3 4 ET 12MM OD FLP GLAND

50 each Delivery: 30 days
#98

FLP GLAND M25 19MM OD

FLP GLAND M25 19MM OD

10 each Delivery: 30 days
#99

DUMMY PLUG 3 4 IN

DUMMY PLUG 3 4 IN

250 each Delivery: 30 days
#100

DUMMY PLUG 20 MM

DUMMY PLUG 20 MM

50 each Delivery: 30 days
#101

DUMMY PLUG 1 IN

DUMMY PLUG 1 IN

25 each Delivery: 30 days
#102

DUMMY PLUG FLP M25

DUMMY PLUG FLP M25

15 each Delivery: 30 days
#103

FLP WP PUSH BUTTON STATION Stop Revers

FLP WP PUSH BUTTON STATION Stop Revers

3 each Delivery: 30 days
#104

FLP JUNCTION BOX 4 WAY FCG

FLP JUNCTION BOX 4 WAY FCG

15 each Delivery: 30 days
#105

FLAMEPROOF WEATHERPROOF JUNCTION 150 X 1

FLAMEPROOF WEATHERPROOF JUNCTION 150 X 1

10 each Delivery: 30 days
#106

FLP WP JUNCTION BOX SIZE 350 X 350

FLP WP JUNCTION BOX SIZE 350 X 350

1 each Delivery: 30 days
#107

FLP WP ENCLOSURE FOR ROTARY ISOLATOR

FLP WP ENCLOSURE FOR ROTARY ISOLATOR

5 each Delivery: 30 days
#108

FLP WP PUSH BUTTON STATION

FLP WP PUSH BUTTON STATION

10 each Delivery: 30 days
#109

240 VAC INDICATION LAMP RED

240 VAC INDICATION LAMP RED

20 each Delivery: 30 days
#110

240 VAC INDICATION LAMP GREEN

240 VAC INDICATION LAMP GREEN

20 each Delivery: 30 days
#111

240 VAC INDICATION LAMP YELLOW

240 VAC INDICATION LAMP YELLOW

20 each Delivery: 30 days
#112

FLP JB INDICATOR RED

FLP JB INDICATOR RED

6 each Delivery: 30 days
#113

FLP JB INDICATOR YELLOW

FLP JB INDICATOR YELLOW

6 each Delivery: 30 days
#114

FLP JB INDICATOR BLUE

FLP JB INDICATOR BLUE

6 each Delivery: 30 days
#115

FLP JB INDICATOR GREEN

FLP JB INDICATOR GREEN

6 each Delivery: 30 days
#116

PANEL PUSH BUTTON RED

PANEL PUSH BUTTON RED

20 each Delivery: 30 days
#117

PANEL PUSH BUTTON GREEN

PANEL PUSH BUTTON GREEN

20 each Delivery: 30 days
#118

PANEL PUSH BUTTON BLUE

PANEL PUSH BUTTON BLUE

10 each Delivery: 30 days
#119

PANEL PUSH BUTTON BLACK

PANEL PUSH BUTTON BLACK

10 each Delivery: 30 days
#120

PANEL INDICATOR TYPE AMPERE METER

PANEL INDICATOR TYPE AMPERE METER

20 each Delivery: 30 days
#121

INSULATION TAPE BOX RED

INSULATION TAPE BOX RED

2 packet Delivery: 30 days
#122

INSULATION TAPE BOX GREEN

INSULATION TAPE BOX GREEN

2 packet Delivery: 30 days
#123

INSULATION TAPE BOX BLACK

INSULATION TAPE BOX BLACK

2 packet Delivery: 30 days
#124

INSULATION TAPE BOX BLUE

INSULATION TAPE BOX BLUE

2 packet Delivery: 30 days
#125

INSULATION TAPE BOX YELLOW

INSULATION TAPE BOX YELLOW

2 packet Delivery: 30 days
#126

16A SINGLE POLE MCB

16A SINGLE POLE MCB

20 each Delivery: 30 days
#127

6A SINGLE POLE MCB

6A SINGLE POLE MCB

20 each Delivery: 30 days
#128

63A MCB 4 POLE

63A MCB 4 POLE

4 each Delivery: 30 days
#129

MCB 32A 2 POLE

MCB 32A 2 POLE

4 each Delivery: 30 days
#130

STAR DELTA TIMER

STAR DELTA TIMER

10 each Delivery: 30 days
#131

MNX A1 CONTACT

MNX A1 CONTACT

5 each Delivery: 30 days
#132

MNX A2 CONTACT

MNX A2 CONTACT

5 each Delivery: 30 days
#133

KAYCEE TYPE 15260 ON OFF SWITCH

KAYCEE TYPE 15260 ON OFF SWITCH

10 each Delivery: 30 days
#134

CABLE TIE 300 MM

CABLE TIE 300 MM

20 packet Delivery: 30 days
#135

CABLE TIE 100 MM

CABLE TIE 100 MM

20 packet Delivery: 30 days
#136

CABLE TIE 150 MM

CABLE TIE 150 MM

20 packet Delivery: 30 days
#137

MEANWELL 230V TO 5V 3A SMPS

MEANWELL 230V TO 5V 3A SMPS

2 each Delivery: 30 days
#138

MEANWELL 230V TO 24V 5A SMPS

MEANWELL 230V TO 24V 5A SMPS

2 each Delivery: 30 days
#139

MEANWELL 230V TO 12V 5A SMPS

MEANWELL 230V TO 12V 5A SMPS

2 each Delivery: 30 days
#140

11KVA LIGHTING ARRESTOR

11KVA LIGHTING ARRESTOR

5 each Delivery: 30 days
#141

24VDC AMPERE METER

24VDC AMPERE METER

6 each Delivery: 30 days
#142

24VDC VOLTAGE METER

24VDC VOLTAGE METER

6 each Delivery: 30 days
#143

24VDC PANEL HOOTER

24VDC PANEL HOOTER

6 each Delivery: 30 days
#144

LED FLOOD LIGHT 90W NON FLP

LED FLOOD LIGHT 90W NON FLP

15 each Delivery: 30 days
#145

LED FLOOD LIGHT 300W NON FLP

LED FLOOD LIGHT 300W NON FLP

20 each Delivery: 30 days
#146

EARTH FLAT 25 X 3 MM

EARTH FLAT 25 X 3 MM

200 meter Delivery: 30 days
#147

EARTH FLAT 50 X 6 MM

EARTH FLAT 50 X 6 MM

50 meter Delivery: 30 days
#148

SHRINKABLE SLEEVE 16SQMM

SHRINKABLE SLEEVE 16SQMM

100 meter Delivery: 30 days
#149

TECKNIC LIMIT SWITCH NG1RS 510M

TECKNIC LIMIT SWITCH NG1RS 510M

2 each Delivery: 30 days
#150

200A SFU FN 200 TPN L AND T IN SHEET STEEL ENCLOSURE

200A SFU FN 200 TPN L AND T IN SHEET STEEL ENCLOSURE

1 each Delivery: 30 days

Reverse Auction Schedule

Completed

Start

02-Jan-2026, 1:00 pm

End

03-Jan-2026, 1:49 pm

Duration: 25 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
ABEDEEN ELECTRICALS   Under PMA
-08-12-2025 15:53:16
2
P K ASSOCIATES AND CO   Under PMA
-07-12-2025 19:36:02
3
PRAKASH ENTERPRISES   Under PMA
-05-12-2025 09:52:31
4
ROYAL HARDWARE/ BURHANI ELECTRICAL STORES   Under PMA
-08-12-2025 14:08:14
5
THANGA TECH SYSTEMS   Under PMA
-08-12-2025 15:33:24

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1ROYAL HARDWARE/ BURHANI ELECTRICAL STORES(MSE,MII)   Under PMA Winner ₹17,41,379Item Categories : PRESSURE SWITCH 7 POINT 5 35 KG FLP,CAPACITOR BOX 440V 3 KVAR,CAPACITOR BOX 440V 5 KVAR,CAPACITOR B
L2ABEDEEN ELECTRICALS (MSE,MII)   Under PMA₹17,62,407Item Categories : PRESSURE SWITCH 7 POINT 5 35 KG FLP,CAPACITOR BOX 440V 3 KVAR,CAPACITOR BOX 440V 5 KVAR,CAPACITOR B
L3P K ASSOCIATES AND CO (MII)   Under PMA₹22,84,371Item Categories : PRESSURE SWITCH 7 POINT 5 35 KG FLP,CAPACITOR BOX 440V 3 KVAR,CAPACITOR BOX 440V 5 KVAR,CAPACITOR B

🎉 L1 Winner

ROYAL HARDWARE/ BURHANI ELECTRICAL STORES(MSE,MII)   Under PMA

Final Price: ₹17,41,379

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Similar Tenders

5 found

ELECTRONIC PRESSURE SWITCH 0-3500PSI 1/2" FNPT,ELECTRONIC PRESSURE SWITCH 0-550PSI 1/4" FNPT,ELECTR

Nhpc Limited

📍 CHAMBA, HIMACHAL PRADESH

EMD: ₹23,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

VACUUM PRESSURE SWITCH 1.5mbar,VACUUM PRESSURE SWITCH 20mbar

Mishra Dhatu Nigam Limited (midhani)

📍 HYDERABAD, TELANGANA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Gail India Limited 1250 KVA DG Spare Parts Tender India - Coolant Level Switch, Diode Assembly, CT, Control Box Perkins 680x217 2026

Gail India Limited

📍 KRISHNA, ANDHRA PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

UP State Sugar Corporation Ltd SMPS 5A 24VDC & Electrical Components Tender Uttar Pradesh 2026

U P State Sugar Corporation Ltd

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

GSECL Gujarat pressure switches and boiler controls tender Surat 2026 ISI/ISO compliant

Gujarat State Electricity Corporation Limited (gsecl) Vadodara

📍 SURAT, GUJARAT

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM