TenderDekho Logo
GEM

Urban Development And Housing Department Bihar Fogging Machine V2 IS 14855 Part 1 Muzaffarpur 2026

Bid Publish Date

19-Feb-2026, 4:39 pm

Bid End Date

03-Mar-2026, 5:00 pm

EMD

₹45,000

Progress

Issue19-Feb-2026, 4:39 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Tender Overview

The Urban Development And Housing Department Bihar invites bids for a Fogging Machine (V2) conforming to IS 14855 (Part 1) in Muzaffarpur, Bihar 842001. The tender carries an EMD of ₹45,000 and references a single Fogging Machine category with IS 14855 Part 1 compliance. No BOQ items are listed. The tender includes a quantity option clause allowing up to 25% variation during and after contract award, with delivery timing linked to last delivery order date and minimum 30 days buffer. Bidder must align with the purchaser’s delivery and quantity adjustment framework.

Technical Specifications & Requirements

  • Fogging machine category: IS 14855 (Part 1) compliant, V2 model
  • Starting type: not disclosed in tender; operational readiness required
  • Fogging machine type: V2 designation per IS standard
  • Operational duration without refuel: not provided; bidders should confirm runtimes
  • Fuel tank capacity: not disclosed; prior test data may be required
  • Pesticide liquid tank capacity: not disclosed; ensure compatibility with IS 14855 liquids
  • Insecticidal liquid flow range: not disclosed; specify LPH range during bid
  • Engine output: not disclosed; bidders should provide rated horsepower
  • Tank materials: chemical and fuel tank materials not specified
  • Warranty: warranty period not explicitly stated; confirm with vendor terms and IS 14855 alignment

Terms, Conditions & Eligibility

  • EMD: ₹45,000 (Earnest Money Deposit)
  • Quantity variation: up to 25% increase/decrease at contract placement/during currency
  • Delivery timeframe: from the last date of original delivery order; minimum 30 days for extended periods
  • Option clause: purchaser may extend time within the original delivery period under the option clause
  • Documentation: ensure compliance with purchaser terms and IS 14855 Part 1; submit as required by buyer ATC

Key Specifications

  • Fogging machine model: V2 as per IS 14855 (Part 1)

  • EMD amount: ₹45,000

  • Delivery extension: up to 25% quantity during currency

  • Delivery period: starts from last date of original delivery order; minimum extension 30 days

  • Warranty: to be confirmed; ensure compatibility with IS 14855 Part 1 requirements

Terms & Conditions

  • EMD amount and submission method must be clearly documented

  • Quantity flex of up to 25% and extension rules under option clause

  • Delivery schedule tied to last original delivery order date with 30-day minimum

Important Clauses

Payment Terms

Details not provided in tender; bidders should seek explicit terms from buyer ATC

Delivery Schedule

Delivery starts after original delivery order; extended time proportional to increased quantity with minimum 30 days

Penalties/Liquidated Damages

Not specified in data; verify with procurement terms during bid submission

Bidder Eligibility

  • Experience in supplying fogging equipment or similar agricultural/industrial equipment

  • Financial capability to meet ₹45,000 EMD and project costs

  • Compliance with IS 14855 Part 1 and ability to provide OEM certifications

Documents 4

GeM-Bidding-8987814.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Nagar Palika Parishad Lalitpur Fogging Machine Tender IS 14855 Part 1 Q2 2026 Uttar Pradesh

Nagar Palika Parishad Lalitpur

LALITPUR, UTTAR PRADESH

Posted: 7 February 2026
Closed: 17 February 2026
GEM

Fogging Machine (V2) as per IS 14855 (Part 1)

Commissionerate Of Municipal Administration

Posted: 26 November 2024
Closed: 10 December 2024
GEM

Fogging Machine (V2) as per IS 14855 (Part 1)

N/a

BALRAMPUR, UTTAR PRADESH

Posted: 6 May 2025
Closed: 19 May 2025
GEM

Fogging Machine (V2) as per IS 14855 (Part 1)

Power Grid Corporation Of India Limited

WARANGAL, TELANGANA

Posted: 30 September 2025
Closed: 5 November 2025
GEM

Fogging Machine (V2) as per IS 14855 (Part 1)

N/a

KRISHNAGIRI, TAMIL NADU

Posted: 25 September 2025
Closed: 6 October 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Generic Starting type Electrical
Generic Fogging machine type Vehicle Mounted
Generic Duration to operate without refuel 1.0 - 40.0 Or higher
Generic Fuel tank capacity 16.0 - 20.0 Or higher
Generic Pesticide tank capacity 150.0 - 160.0 Or higher
Generic Insecticidal liquid flow range (In LPH) 160.0 - 160.0 Or higher
Generic Engine output 75.0 - 75.0 Or higher
Dimension and Constructions Chemical tank material Stainless Steel 304
Dimension and Constructions Fuel tank material CRC Steel
Certification, Testing & Warranty Warranty of Fogging machine 1, 2 Or higher

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates in similar fogging equipment projects

4

Financial statements or solvency certificate

5

EMD submission proof (₹45,000)

6

Technical bid documents demonstrating IS 14855 Part 1 compliance

7

OEM authorizations or dealership certificates (if applicable)

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for fogging machine tender in Muzaffarpur Bihar 2026

To participate, ensure IS 14855 (Part 1) V2 compliance, submit ₹45,000 EMD, provide GST/PAN and experience certificates, and align with the 25% quantity variation clause. Prepare OEM authorizations and technical bids with IS-compliant performance data and warranty terms. Fulfill delivery terms linked to the last original delivery order date.

What documents are required for fogging equipment tender in Muzaffarpur

Required documents include GST registration, PAN, experience certificates in similar fogging projects, financial statements, EMD proof of ₹45,000, technical bid demonstrating IS 14855 Part 1 compliance, and OEM authorizations if applicable. Ensure all documents are current and notarized where required.

What are the IS 14855 Part 1 requirements for fogging machines

Bidders must ensure fogging machines meet IS 14855 Part 1 specifications for safe agricultural use, including appropriate pesticide compatibility, flow rate, and engine specifications. Provide testing certificates, warranty details, and performance data aligning with IS guidelines to qualify for the Bihar procurement.

When is the delivery window for the Muzaffarpur fogging tender

Delivery begins after the original delivery order date, with additional time calculated as (increased quantity/original quantity) times the original delivery period, minimum 30 days. The buyer may adjust quantity by up to 25% during the contract term, affecting the delivery timeline.

What is the EMD amount for the Bihar fogging equipment tender 2026

The Earnest Money Deposit required is ₹45,000, payable through the specified method in the tender terms. Ensure submission with the bid package to establish eligibility, and verify payment deadlines in the buyer’s ATC document.

What are the essential eligibility criteria for fogging machine bidders

Eligibility includes prior experience supplying similar fogging equipment, financial stability evidenced by statements, GST and PAN validity, and ability to provide OEM authorizations. Compliance with IS 14855 Part 1 and ability to meet delivery and warranty terms are also required.

How to verify the warranty terms for fogging machines

Request explicit warranty duration and coverage from the buyer’s ATC. Verify whether the warranty includes parts, labor, and on-site support, and ensure the supplier can provide calibration, maintenance, and after-sales service within specified Bihar procurement timelines.

What is the supplier’s obligation under quantity variation

Suppliers must accommodate up to 25% quantity fluctuation at contract award and during the currency. Adjust delivery plans accordingly, ensuring last-delivery-order-based scheduling and maintaining contracted rates as specified.

Similar Tenders

5 found
Urgent

Health Department, Madhya Pradesh Fogging Machine Tender Betul 2026 IS 14855 Part 1 V2 2026

Health Department,madhya Pradesh

📍 BETUL, MADHYA PRADESH

EMD: ₹12,000
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Urgent

Fogging Machine (V2) as per IS 14855 (Part 1)

South Central Railway

📍 HYDERABAD, TELANGANA

Est: ₹2.5 L
⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM
Urgent

Indian Air Force Fogging Machine Procurement UDHAMPUR Jammu & Kashmir IS 14855 Part 1 2026

Indian Air Force

📍 UDHAMPUR, JAMMU & KASHMIR

EMD: ₹52,182
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Fogging Machine (V2) as per IS 14855 (Part 1)

National Rural Health Mission (nrhm) State Health Society

📍 AHMEDABAD, GUJARAT

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Health Department Madhya Pradesh Fogging Machine Tender SAGAR MP IS 14855 Part 1 2026

Health Department,madhya Pradesh

📍 SAGAR, MADHYA PRADESH

EMD: ₹24,000
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM