Indian Coast Guard Shore Supply Junction Boxes Shifting & Installation Tender Jamnagar Gujarat 2025
Indian Coast Guard
JAMNAGAR, GUJARAT
Bid Publish Date
02-Jan-2026, 6:02 pm
Bid End Date
19-Jan-2026, 5:00 pm
EMD
₹98,000
Value
₹78,38,322
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: South Eastern Coalfields Limited (SECL), Coal India Limited subsidiary, seeking Dismantling, transportation, installation and shifting of 100/2000/3000 GPM electric-diesel pump sets and pontoons, including related accessories with 8 inch and 6 inch pipelines from the sump pump station to discharge point. Estimated value: ₹7,838,322; EMD: ₹98,000. No BOQ items listed. Location details are not disclosed in the provided data. The procurement focuses on heavy equipment relocation and system reconfiguration within SECL’s Bhatgaon Area requirements, with emphasis on coordinated logistics and site installation compliance. Distinguishing factors include the multi-capacity pump sets and pipeline sizes, and the need for accurate handover of installed systems to operating status.
EMD details: ₹98,000 via DD to SECL BHATGAON AREA; DD proof must be uploaded.
Delivery/installation: Dismantling through shifting of pump sets with pipelines; site execution within unspecified timeline.
Submission: Bid Submission Confirmation Sheet required; hard copies to be delivered within 5-15 days post award
PBG/FDR: FDR accepted as performance security; ensure endorsement and delivery of original FDR within 15 days
ATC compliance: Review Annexure XVIII; noncompliance or tampering leads to nonresponsiveness
No BOQ items listed: Scope defined by pump sets and associated accessories; ensure alignment with listed components
EMD via DD to SECL BHATGAON AREA; scanned DD proof with bid; payment terms not specified in provided data
No explicit delivery timeline provided; bidders must refer to ATC and contract terms and ensure feasible site installation and handover
No LD details available in provided data; tender ATC may specify later
Submit DD-based EMD of ₹98,000 or accepted equivalent
Demonstrate capability to dismantle, transport, install and shift high-capacity pumps with 8 and 6 inch pipelines
Provide FDR-based performance security if chosen, with original document deliverable within 15 days
Indian Coast Guard
JAMNAGAR, GUJARAT
National Institute Of Wind Energy
CHENNAI, TAMIL NADU
Western Coalfields Limited
NAGPUR, MAHARASHTRA
Western Coalfields Limited
CHANDRAPUR, MAHARASHTRA
Ntpc Limited
BEGUSARAI, BIHAR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Bidders must prepare an EMD of ₹98,000 via DD to SECL BHATGAON AREA and upload the scanned DD proof with the bid. Deliver a hard copy within 5 days of bid end/opening and provide the required Bid Submission Confirmation Sheet; review Annexure XVIII for checklist compliance.
Submit Bid Submission Confirmation Sheet, EMD proof (DD or equivalent), scanned copy of DD, FDR if using security, and hard copies within 15 days of award. Ensure OEM authorizations and experience certificates, GST, and PAN are available per ATC guidance.
EMD ₹98,000 via DD to SECL BHATGAON AREA; alternatively, Performance Security may be provided as a Fixed Deposit Receipt (FDR) in the SECL A/C with endorsement. Upload the FDR copy and deliver the original within 15 days post award.
Scope includes dismantling, transportation, installation, and shifting of pump sets with capacities of 100, 2000, and 3000 GPM plus related pontoons and 8 inch/6 inch pipelines from sump to discharge point; ensure site readiness and handover.
Bid submissions are checked against the Bid Submission Confirmation Sheet; any tampering with GTE/Work Experience/Working Capital finances leads to nonresponsiveness. Ensure all fields match and documents are complete.
The tender requires on-site dismantling, transport, installation and shifting with compatible pipelines; exact delivery schedules will be clarified in ATC. Bidders must align with the 5-day document submission and 15-day FDR delivery timelines post award.
National Institute Of Wind Energy
📍 CHENNAI, TAMIL NADU
Iisco Steel Plant
📍 BARDHAMAN, WEST BENGAL
Yantra India Limited
Western Coalfields Limited
📍 CHANDRAPUR, MAHARASHTRA
Western Coalfields Limited
📍 CHANDRAPUR, MAHARASHTRA
Sign up now to access all documents
Main Document
PAYMENT
SCOPE_OF_WORK
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS