Madhya Pradesh Labour Department Multifunction Machine UPS Tender 2026 - IS/IEC Printing & AVR Standards
N/a
GWALIOR, MADHYA PRADESH
Progress
Quantity
1
Bid Type
Two Packet Bid
State Bank Of India invites bids for an Online UPS Modular Type system to support financial service operations in Khordha, Odisha (PIN 751001). Estimated value not disclosed; EMD set at ₹100,000. Scope covers modular UPS with rack enclosure, compliance to IS and CE requirements, with 24x7 PAN India service and on-site installation, commissioning, and spares across India. Unique factors include option to increase quantity up to 25%, and extended delivery calculation tied to original delivery period. This procurement emphasizes reliability, battery-backed uptime, and full lifecycle support from installation through AMC after three years.
EMD of ₹100,000 must be submitted via DD and scanned copy uploaded
Delivery quantity can be increased by 25% with recalculated schedule
24x7 PAN India service; 3-year AMC option post-warranty; installation/ commissioning included
EMD payable by DD; payment terms to be as per SBI standard; ensure submission of DD proof when bidding
Delivery period adjustable by option clause; minimum 30 days extension; contingent on original delivery period
Penalties for late delivery or non-conformity to IS/CE and warranty terms; LD provisions to be confirmed in final tender
Minimum three years’ experience in supplying modular UPS or comparable critical power systems
Demonstrated PAN India service network with 24x7 support
Financial capacity to undertake procurement with EMI/credit terms and warranty obligations
N/a
GWALIOR, MADHYA PRADESH
Indian Army
KUPWARA, JAMMU & KASHMIR
Assam Rifles
KIPHIRE, NAGALAND
N/a
BHOPAL, MADHYA PRADESH
Indian Army
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Output power capacity including redundancy/Expandable (Rack facility) upto/Minimum backuptime (including redundancy) /Minimum VAH (VAH shall be calculated Battery voltage x Battery Ah x No. of batteries = Total VAH) | 150 KVA/240KVA/15 Minutes/61500 VAH, 150 KVA/240KVA/30 Minutes/123000 VAH, 150 KVA/240KVA/45 Minutes/184500 VAH, 150 KVA/250KVA/15 Minutes/61500 VAH, 150 KVA/250KVA/30 Minutes/123000 VAH, 150 KVA/250KVA/45 Minutes/184500 VAH, 160 KVA/240KVA/15 Minutes/65600 VAH, 160 KVA/240KVA/30 Minutes/131200 VAH, 160 KVA/240KVA/45 Minutes/196800 VAH, 160 KVA/250KVA/15 Minutes/61500 VAH, 160 KVA/250KVA/30 Minutes/123000 VAH, 160 KVA/250KVA/45 Minutes/184500 VAH, 60 KVA/120KVA/15 Minutes/24600 VAH, 60 KVA/120KVA/30 Minutes/49200 VAH, 60 KVA/120KVA/45 Minutes/73800 VAH, 4KVA/8KVA/6 minutes/1080 VAH, 8KVA/16KVA/6 minutes/2160 VAH, 16KVA/32KVA/6 minutes/4320 VAH, 100 KVA/200 KVA/15 Minutes/72000 VAH, 100 KVA / 150 KVA / 30 Minutes / 82000 VAH, 120 KVA / 125 KVA / 30 Minutes / 76800 VAH, 160 KVA / 240 KVA / 60 Minutes / 262400 VAH, 120 KVA / 240 KVA / 30 Minutes / 100800 VAH, 40KVA with 15/ 30 min backup 50KVA with 15/ 30 min backup 80KVA with 15/ 30 min backup, 60 KVA / 240 KVA / 30 Minutes / 50400 VAH, 60 KVA / 150 KVA / 60 Minutes / 103680 VAH, 10 KVA / 20 KVA / 30 Minutes / 15600 VAH, 15 KVA/ 30 KVA/ 30 Minutes/ 24000 VAH, 40 KVA/ 100 KVA/ 30 Minutes/ 20160 VAH, 500 KVA/ 500 KVA/ 30 Minutes/ 360000 VAH, 300 KVA/300 KVA/15 Minutes/ 163200 VAH |
| GENERIC | Country of origin for Inverter | India |
| GENERIC | Noise level | |
| INPUT | In put Voltage Range | 340 V to AC to 470 V AC 3 Phase |
| INPUT | Input frequency range | 50 +/-6% Hz |
| INPUT | Distortion (current) | < / = 3% |
| OUTPUT | Output powr factor | >/= 0.90 |
| CONSTRUCTION | Minimum thickness (in mm) of Rack Enclosure for Modular UPS duly powder coated | 2.0, 1.2, others |
| CONSTRUCTION | UPS enclosure's degree of protection as per IS:13947 (Part 1)/1993 latest | IP21 |
| CONSTRUCTION | Total Harmonic Distrotion (THD) for 100% linear load | < 2% |
| CONSTRUCTION | Total Harmonic Distrotion (THD) for 100% non-linear load | < 4% |
| CONSTRUCTION | Over all efficiency on rated full load of 0.8 PF (min.) AC output | >/=94% |
| CONSTRUCTION | Inverter efficiency on rated full load of 0.8 PF (min.) AC output | >/=95% |
| CONSTRUCTION | UPS shall withstand Over load capacity - 125% (Output with mains AC-AC) | for 5 Minutes (Minimum) |
| CONSTRUCTION | UPS shall withstand Over load capacity - 125% (Output in battery run DC-AC) | for 2 Minutes (Minimum) |
| BATTERY | Battery type | SMF VRLA, SMF VRLA, Modular Hot swappable Battery modules, Lithium Ion Battery [ as per IS 16046 (part 2)/ IEC 62133-2 and as per IEC 62485-5] |
| BATTERY | Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD | 8 to 10 hours, 4 to 8 hours |
| BATTERY | Batteries shall supply with | With metal rack |
| WARRANTY AND SERVICES | Warranty for Modular UPS (on site comprehensive warranty) (in years) | 3 |
| WARRANTY AND SERVICES | Warranty for battery (replacement warranty) (in years) | 5 |
| WARRANTY AND SERVICES | After sales and complaint service | within 24 hours |
| WARRANTY AND SERVICES | PAN India service support on 24 x 7 basis | Yes |
| WARRANTY AND SERVICES | AMC support available after 3 year warranty | Yes |
| WARRANTY AND SERVICES | Quarterly preventive maintenance | Yes |
| WARRANTY AND SERVICES | Manufacturer shall provide and support for installation, commissioning, spares, technical support all over India | Yes |
| WARRANTY AND SERVICES | Availability of spares in close proximity (Spares should be easily available close to the site) | Yes |
| CERTIFICATIONS | CE Certification and marking | Yes |
| CERTIFICATIONS | Damp Heat Test : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C,two cycles of (12+12) hours each 2007) | Yes, No |
| CERTIFICATIONS | Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs | Yes, No |
| CERTIFICATIONS | Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. | Yes, No |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar UPS installations
Financial statements (recent years)
EMD submission proof (DD or online transfer receipt) and scanned copy
Technical bid documents showing compliance to IS 13947 and CE
OEM authorization letters (if not manufacturer)
Installation/commissioning plan and after-sales support details
Warranty details for UPS and batteries
Proof of 24x7 PAN India service coverage
Key insights about ODISHA tender market
Bidders should register with SBI, obtain the tender documents, ensure EMD of ₹100,000 via DD to Bhubaneswar, submit GST and PAN, provide OEM authorizations if required, and demonstrate 24x7 PAN India service capability; adhere to IS 13947, CE, and IS 9000 tests.
Submit GST certificate, PAN card, experience certificates for modular UPS, financial statements, EMD proof, technical bid documents demonstrating compliance to IS 13947 and CE, and OEM authorizations where applicable; include installation/commissioning plan and warranty details.
Bidders must meet IS 13947 enclosure standards, CE marking, and IS 9000 damp heat, dry heat, and cold tests; ensure THD metrics for linear and non-linear loads, 0.8 PF output, and 125% overload tolerance as specified.
The EMD is ₹100,000. Submit via Account Payee Demand Draft in favor of the SBI Asst. General Manager, payable at Bhubaneswar; upload scanned DD proof with bid and send the hard copy within 5 days of bid end/opening date.
Contract allows up to 25% quantity variation; delivery time adjusts by (Additional quantity / Original quantity) × Original delivery period, with a minimum of 30 days; extensions allowable within original framework.
On-site comprehensive warranty for UPS, battery replacement warranty, 24x7 PAN India service, quarterly preventive maintenance, and AMC available after 3 years; manufacturer to support installation, commissioning, and spares nationwide.
Enclosure must have minimum thickness in mm, powder-coated finish, and comply with IS:13947 (Part 1)/1993 enclosure protection; must meet THD specs for both 100% linear and non-linear loads and deliver specified IP/IK protection levels.
Damp Heat per IS 9000 (P5 S2) 1981/2007, Dry Heat per IS 9000 (P3 S5) 1977/2007 at 55C, and Cold Test per IS 9000 (P2 S4) 1977/2007 at -10C; CE marking required for compliance.
Indian Army
📍 PUNE, MAHARASHTRA
Indian Navy
📍 TIRUNELVELI, TAMIL NADU
Ans,finance,hr,engineering,tech,ops,commercial,general Store,it
📍 CENTRAL DELHI, DELHI
Directorate Of Purchase And Stores
📍 MUMBAI, MAHARASHTRA
Power Grid Corporation Of India Limited
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS