Indian Army LV7 Vehicle Parts Tender Patiala Punjab 2026 - Hose, Lamp, Air Dryer, Master Cylinder Specifications
Indian Army
PATIALA, PUNJAB
Bid Publish Date
09-Feb-2026, 8:29 pm
Bid End Date
19-Feb-2026, 9:00 pm
EMD
₹18,100
Progress
Quantity
235
The opportunity is issued by the Indian Army under the Department Of Military Affairs for procurement related to specified LV7-MARUTI and LV7-TATA category items, with an EMD of ₹18,100. Scope indicates multiple line items (7 total) though exact quantities are not disclosed. The procurement location is not stated, but the tender is within the Indian defense sector, targeting vendors capable of supplying non-obsolete products with at least a 1-year residual market life. A key differentiator is the requirement to secure Detailed Design Drawings and obtain buyer approval before fabrication, plus a 25% +/- quantity option during contract execution. The bid must reflect compliance with buyer standards and timely delivery.
Option clause allows +/- 25% quantity variation during and after contract
Detailed Design Drawings approval required within 5 days of award
GST handling and EMD amount specified; due diligence on finances
Non-obsolescence requirement with minimum 1-year market life
Vendor Code creation: PAN, GSTIN, cancelled cheque, EFT mandate
GST treatment borne by bidder; reimbursement as actuals or applicable rates; no specific payment milestone stated beyond standard procurement.
Delivery period subject to 25% quantity variation; extension rules defined as (increased quantity ÷ original quantity) × original delivery period with minimum 30 days.
Not explicitly stated; potential LD would be aligned with contract terms post finalization of delivery schedule.
Not under liquidation or bankruptcy; provide undertaking
Offer not end-of-life within a 1-year residual market life
OEM authorization for imported products; registered office of OEM
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
PATIALA, PUNJAB
Indian Army
RANCHI, JHARKHAND
Indian Army
RANCHI, JHARKHAND
Indian Army
KOTA, RAJASTHAN
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | LV7-MARUTI,11110M52G12 | LV7/MARUTI,11110M52G12,HEAD ASSY CYLINDER | 28 | nos | 78064 | 30 |
| 2 | LV7-MARUTI,09168M14012 | LV7/MARUTI,09168M14012,GASKET | 8 | nos | 78064 | 30 |
| 3 | LV7-MARUTI,35662M80000 | LV7/MARUTI,35662M80000,LENS TURN SIGNAL | 12 | nos | 78064 | 30 |
| 4 | LV7-TATA,2573-2910-0159 | LV7/TATA,2573-2910-0159,MAJOR REPAIR KIT FOR M/CYL | 13 | nos | 78064 | 30 |
| 5 | LV7-STLN VF,F-7410300 | LV7/STLN(VF),F-7410300,STOP LIGHT SWITCH | 28 | nos | 78064 | 30 |
| 6 | LV1-R72,175.03.007.1 | LV1/R72,175.03.007.1,GASKET | 96 | nos | 78064 | 30 |
| 7 | LV1-R72,54.05.16SB.A | LV1/R72,54.05.16SB.A,SECTION FILTER 3RD | 50 | nos | 78064 | 30 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Bidder undertaking of non-liquidation/bankruptcy
Details confirming 1-year residual market life for offered products
OEM authorization for imported products (if applicable)
End User Certificate in Buyer’s standard format (if requested)
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide non-liquidation undertaking, verify 1-year residual market life, and supply OEM authorizations for imported items. Include Detailed Design Drawings within 5 days of award and expect a 25% quantity variation option during contract execution.
Submit: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank; ensure GST is timely applied; provide End User Certificate in buyer format if requested and ensure non-bankruptcy statement.
Offerors must not be in liquidation or bankruptcy; products offered must have at least 1 year residual market life; OEM authorization required for imported goods; ensure registered office of OEM; provide financial and compliance documents during bid.
The EMD is ₹18,100. Bidder must furnish this amount as specified, adhering to payment method per bid guidelines; failure to submit EMD may disqualify the bid from technical evaluation and bid opening.
Quantity can increase up to 25% during contract; delivery period extended by (increased quantity ÷ original quantity) × original period, minimum 30 days; original period governs calculations unless extended by the buyer.
Successful bidder must submit Detailed Design Drawings within 5 days of award; buyer approves or lists modifications within 5 days; delay in approval may shift the delivery date without LD.
GST is the bidder’s responsibility; reimbursement is based on actuals or applicable rates, limited to the quoted GST percentage; ensure GST compliance and accurate invoicing under procurement terms.
Bidder must ensure products are not end-of-life; offered items should have at least 1-year residual market life; provide OEM confirmation of product lifecycle during submission.
Indian Army
Indian Army
Indian Army
Indian Army
Indian Army
📍 SAGAR, MADHYA PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS