Indian Army Baramulla Field Coil, Armature, Brush Gear, Solenoid Switch Procurement 2026
Indian Army
BARAMULLA, JAMMU & KASHMIR
Bid Publish Date
03-Nov-2025, 6:26 pm
Bid End Date
13-Nov-2025, 7:00 pm
Location
Progress
Quantity
11
Category
Field Coil Assy
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for multiple vehicle and electrical assemblies in Budgam, Jammu & Kashmir (190007). The procurement encompasses eight items including Field Coil Assembly, Combination Switch, Alternator, Hose Assembly, Suspension Bush Kit, Cable Complete Assembly, Bush Spring Shackle, and Hose TD Radiator, with an estimated value and EMD not disclosed. The BOQ lists eight total items, but item-specific quantities or units are not provided, signaling an open quantity assessment once the contract is awarded. Unique terms include an option clause enabling quantity variations up to 25% at contract rates and during the currency of the contract, along with delivery-time calculations tied to the original delivery period. This tender highlights a flexible yet controlled quantity and delivery framework tailored to military readiness requirements.
Product/service names: Field Coil Assembly, Combination Switch, Alternator, Hose Assembly, Suspension Bush Kit, Cable Complete Assembly, Bush Spring Shackle, Hose TD Radiator
Quantities: Not disclosed in BOQ; total items: 8
Estimated value: Not disclosed
Experience requirements: Not specified; bidders should show capability for military-grade assemblies
Quality/standards: Not specified; bidders should align to OEM/military-grade compatibility
Key Term 1: Option clause allows +/- 25% quantity changes at contract and during currency.
Key Term 2: Delivery periods extend based on the option formula with a minimum 30 days.
Key Term 3: GST applicability to be verified by bidders; reimbursement as per actuals or lower rate.
GST payable as applicable; reimbursement per actuals or lower rate; exact terms to be disclosed in bid.
Delivery period anchored to original delivery date; option clause can extend period; minimum extension 30 days.
Not specified in the provided data; bidders should expect standard Army procurement penalties and LD as per contract.
Experience in supplying military-grade electrical and mechanical assemblies
Demonstrated capability to meet OEM specifications for Field Coil Assembly and related components
Financial stability evidenced by audited statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Field Coil Assy , Combination Switch , Alternator , Hose Assy , Suspension Bush Kit , Cable Complete Assy , Bush Spring Shackle , Hose TD Radiator
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
DARJEELING, WEST BENGAL
Indian Army
GWALIOR, MADHYA PRADESH
Indian Army
BATHINDA, PUNJAB
Tender Results
Loading results...
Field Coil Assy
Field Coil Assy
Combination Switch
Combination Switch
Alternator
Alternator
Hose Assy
Hose Assy
Suspension Bush Kit
Suspension Bush Kit
Cable Complete Assy
Cable Complete Assy
Bush Spring Shackle
Bush Spring Shackle
Hose TD Radiator
Hose TD Radiator
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Field Coil Assy | Field Coil Assy | 2 | nos | wo950 | 15 | |
| 2 | Combination Switch | Combination Switch | 1 | nos | wo950 | 15 | |
| 3 | Alternator | Alternator | 1 | nos | wo950 | 15 | |
| 4 | Hose Assy | Hose Assy | 2 | nos | wo950 | 15 | |
| 5 | Suspension Bush Kit | Suspension Bush Kit | 1 | nos | wo950 | 15 | |
| 6 | Cable Complete Assy | Cable Complete Assy | 2 | nos | wo950 | 15 | |
| 7 | Bush Spring Shackle | Bush Spring Shackle | 1 | nos | wo950 | 15 | |
| 8 | Hose TD Radiator | Hose TD Radiator | 1 | nos | wo950 | 15 |
GST registration certificate
PAN card
Experience certificates confirming relevant supply
Financial statements (audited where available)
EMD documents (amount not disclosed in data; bid should specify)
Technical bid demonstrating compliance with vehicle/electrical assemblies
OEM authorization letters (if applicable)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AGS ENTERPRISES Under PMA | - | 12-11-2025 21:23:33 | |
| 2 | M/O ILLHUM ENTERPRISES Under PMA | - | 13-11-2025 11:42:59 | |
| 3 | M/S EMBOSS ENTERPRISES Under PMA | - | 13-11-2025 17:38:12 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | M/O ILLHUM ENTERPRISES(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Field Coil Assy,Combination Switch,Alternator,Hose Assy,Suspension Bush Kit,Cable Complete Assy,Bus | |
| L2 | AGS ENTERPRISES (MII) Under PMA | Item Categories : Field Coil Assy,Combination Switch,Alternator,Hose Assy,Suspension Bush Kit,Cable Complete Assy,Bus | |
| L3 | M/S EMBOSS ENTERPRISES (MII) Under PMA | Item Categories : Field Coil Assy,Combination Switch,Alternator,Hose Assy,Suspension Bush Kit,Cable Complete Assy,Bus |
Key insights about JAMMU AND KASHMIR tender market
Bidders should prepare GST registration, PAN, experience certificates, and financials, plus OEM authorizations if required. The tender permits up to 25% quantity variation at contract rates. Ensure OEM compatibility for field coil, alternator, and hose assemblies and confirm delivery timelines per the original schedule with the minimum 30-day extension rule.
Submit GST certificate, PAN, experience certificates, financial statements, EMD documents, technical bid detailing compliance with eight listed components, and OEM authorizations if applicable. Prepare proof of past similar supply and service capability for military-grade assemblies.
The BOQ lists eight components: Field Coil Assembly, Combination Switch, Alternator, Hose Assembly, Suspension Bush Kit, Cable Complete Assembly, Bush Spring Shackle, and Hose TD Radiator. Quantities and unit measures were not provided and will be clarified during bid evaluation.
Delivery can increase or decrease up to 25% of the bid quantity at contract, and during the currency, at the same contracted rates. The extended delivery period is calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders must verify applicable GST themselves. GST reimbursement will be as per actuals or the applicable lower rate, not exceeding the quoted GST percentage. Include GST details in the bid and ensure compliance with local tax rules.
The tender data does not specify standards; bidders should ensure OEM compliance and compatibility with military-grade specifications for Field Coil Assembly, Alternator, and related components, and be prepared to provide certification or test results as part of the bid.
Delivery periods align with the original delivery schedule; if option clause is exercised, the extended period is calculated using the provided formula. Minimum extension is 30 days, with potential up to the original delivery period extension during contract modification.
The option clause allows up to 25% increase per contract terms. Any further variation would require renegotiation or additional contract amendments, maintaining the same contracted rates and delivery framework described in the bid terms.
Indian Army
📍 AMRITSAR, PUNJAB
Indian Army
📍 DARJEELING, WEST BENGAL
Indian Army
📍 DARJEELING, WEST BENGAL
Indian Army
📍 Pathankot, PUNJAB
Indian Army
📍 ALWAR, RAJASTHAN
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS