GEM

Rural Development Department Uttar Pradesh High Mast Lighting Octagonal Tower with Solar LED Street Light Tender 2025

Bid Publish Date

24-Nov-2025, 2:28 pm

Bid End Date

04-Dec-2025, 3:00 pm

EMD

₹20,000

Progress

Issue24-Nov-2025, 2:28 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

6

Bid Type

Two Packet Bid

Categories 7

Tender Overview

The Rural Development Department, Uttar Pradesh, initiates a procurement for High Mast Lighting Octagonal Towers with Solar Based LED Street Light systems (Q3 category). The tender specifies a non-disclosed estimated value and an EMD of ₹20,000. It allows a 25% quantity variation during contract placement and currency, with delivery timelines linked to the original order date. Turnover criteria apply to both bidders and OEMs, requiring three-year average turnover evidence. A functional service centre in each consignee state is mandatory for carry-in warranty scenarios. Unique scope emphasizes solar-powered LED illumination with octagonal tower design.

  • Organization: Rural Development Department, Uttar Pradesh
  • Product: High Mast Lighting Octagonal Tower with Solar Based LED Street Light
  • EMD: ₹20,000
  • Quantity flexibility: 25% up/down
  • Delivery: linked to original delivery period; extended time formula applies
  • Service requirement: state-wide service centers for carry-in warranty
  • Eligibility: bidder and OEM turnover criteria; OEM turnover if bunch bids
  • Location: Uttar Pradesh, India

Technical Specifications & Requirements

  • Product category: High Mast Lighting with Octagonal Tower and Solar LED Street Light system (Q3)
  • EMD amount: ₹20,000
  • Turnover criteria: minimum average annual turnover over last 3 financial years (bid document specifies threshold); if company <3 years old, turnover from completed years is considered
  • OEM turnover criterion: OEM of the primary product must meet turnover threshold in bunch bids; apply to highest bid value category
  • Service & Support: functional service center required in each consignee state for carry-in warranty; if on-site warranty, this may not apply
  • Delivery terms: option to increase quantity by up to 25% at contracted rates; delivery period calculations based on original orders
  • Standards/compatibility: not specified; bidders should align to solar LED high mast norms and electrical safety considerations

Terms, Conditions & Eligibility

  • EMD requirement: ₹20,000 (payment mode not specified in data; bidders should verify acceptable deposit method)
  • Turnover: minimum average annual turnover over last 3 years; evidence via audited balance sheets or CA certificate
  • OEM involvement: turnover criteria for OEM in case of multi-vendor bids; highest value category OEM must meet criteria
  • Delivery schedule: delivery period to start from last date of original delivery order; extended time rules apply with minimum 30 days
  • Service centers: mandatory state-level service center presence for carry-in warranty; establishment within 30 days post-award if not existing
  • Payment terms: not specified in data; bidders should seek clarification on payment milestones and terms
  • Warranty/penalties: no explicit warranty or LD terms provided; infer standard government procurement expectations and seek clarification

Key Specifications

  • High Mast Lighting Octagonal Tower with Solar LED Street Light

  • EMD: ₹20,000

  • OEM turnover criteria applied in bunch bids

  • Carry-in warranty service centers required in each consignee state

  • Quantity variation up to 25% during contract and currency extensions

  • Delivery period linked to original order date with calculated extensions

Terms & Conditions

  • EMD of ₹20,000 required with bid submission

  • Bidder and OEM turnover criteria must be met for last 3 financial years

  • Service centers must exist in each consignee state for carry-in warranty; 30-day setup if not present

Important Clauses

Payment Terms

No explicit payment terms provided in data; bidders should confirm milestones and payment windows with the buyer

Delivery Schedule

Delivery period starts from the last date of the original delivery order; option to extend time based on quantity adjustments with minimum 30 days

Penalties/Liquidated Damages

No LD clause specified in data; bidders should verify LD provisions during bid submission

Bidder Eligibility

  • Minimum average annual turnover as per bid document (last 3 years)

  • OEM turnover criteria for primary product in bunch bids

  • Functional service center presence in each consignee state or within 30 days post-award

Past Similar Tenders (Historical Results)

5 found

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

N/a

BASTI, UTTAR PRADESH

Posted: 18 June 2025
Closed: 5 July 2025
GEM

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

N/a

BASTI, UTTAR PRADESH

Posted: 18 June 2025
Closed: 5 July 2025
GEM

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

N/a

BASTI, UTTAR PRADESH

Posted: 18 June 2025
Closed: 5 July 2025
GEM

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

Nagar Panchayat Rabupura

GAUTAM BUDDHA NAGAR, UTTAR PRADESH

Posted: 17 June 2025
Closed: 28 June 2025
GEM

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

Rajkot District Panchayat

RAJKOT, GUJARAT

Posted: 22 September 2025
Closed: 3 October 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for last 3 years or CA certificate showing turnover

4

EMD document (demand draft or online payment receipt) for ₹20,000

5

OEM authorization (for primary product OEM, if applicable)

6

Technical bid documentation demonstrating capability for solar LED high mast lighting

7

Product compliance certificates (if available) and installation/service capability

8

Experience certificates for similar high mast/solar LED installations

9

Company profile and contact details

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What are the eligibility criteria for solar LED high mast tender in Uttar Pradesh?

Bidders must meet turnover requirements for the last 3 financial years, provide audited statements or CA certificates, and demonstrate OEM turnover compliance for the primary product in multi-bid scenarios. A functional service center in each consignee state is required for carry-in warranty, and an EMD of ₹20,000 is mandatory with bid submission.

How to submit required documents for Rural Development UP solar lighting bid 2025?

Prepare GST and PAN certificates, audited financials or CA turnover certificates, EMD proof of ₹20,000, OEM authorizations, and technical bid documents demonstrating solar LED high mast capabilities. Include experience certificates for similar installations and service center proofs in respective states.

What technical standards apply to UP solar LED high mast lighting tender?

Explicit standards are not detailed; bidders should ensure solar LED luminaires meet electrical safety norms and product compatibility with high mast towers. Obtain clarification on IS/IEC standards and ensure the equipment supports green energy and robust outdoor performance.

What is the EMD amount and payment terms for this UP tender?

The EMD amount is ₹20,000. Payment terms are not specified in the data; bidders should confirm milestone-based payments and any advance payment or performance security requirements with the procuring department.

When can quantity be increased under the option clause for UP tender?

The purchaser may increase quantity up to 25% of bid quantity at contracted rates at the time of contract placement and during contract currency. Delivery time scales are recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What documents are essential for bid submission in this UP procurement?

Essential documents include GST certificate, PAN, 3-year turnover proof, EMD receipt of ₹20,000, OEM authorization, experience certificates for similar projects, technical bid, and service center proof. Ensure all documents align with terms and support the required turnover thresholds.

What is the scope of service centers required for carry-in warranty?

Bidders must have a functional service center in each consignee state for carry-in warranty; if not existing, establish one within 30 days of award. On-site warranty may negate this requirement, but confirm applicability with the buyer before submission.

How to verify delivery timeline and extension rules for UP tender?

Delivery begins from the last date of the original order. If extended, time adjusts with the formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, and may extend up to the original delivery period on option exercise.

Similar Tenders

5 found
Urgent

Rural Development Department Uttar Pradesh High Mast Lighting Octagonal Tower with Solar LED Tender 2025

N/a

📍 KUSHINAGAR, UTTAR PRADESH

EMD: ₹20,000
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

Rural Development Department Uttar Pradesh High Mast Lighting Octagonal Tower with Solar LED Tender 2025 UP

N/a

📍 KUSHINAGAR, UTTAR PRADESH

EMD: ₹20,000
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

Rural Development Department Uttar Pradesh High Mast Lighting Octagonal Tower with Solar LED Street Light Tender 2025

N/a

📍 KUSHINAGAR, UTTAR PRADESH

EMD: ₹20,000
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Chandrapur District Panchayats High Mast Lighting Octagonal Tower with Solar LED Tender 2025

Chandrapur District Panchayats

📍 CHANDRAPUR, MAHARASHTRA

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

High Mast Lighting Octagonal Tower with Solar Based LED Street Light

Chandrapur District Panchayats

📍 CHANDRAPUR, MAHARASHTRA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM