PEDESTAL FAN
Bharat Electronics Limited (bel)
HYDERABAD, TELANGANA
Bid Publish Date
06-Jun-2026, 5:58 pm
Bid End Date
16-Jun-2026, 6:00 pm
Location
Progress
Quantity
10
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, located in Leh, Jammu & Kashmir (194101), seeks to procure Pedestal Fans. The tender involves a government procurement process for a basic category product with mandatory compliance for GST, PAN, and EFT mandates. The contract includes an option to adjust quantity up to 25% during and after the award, with revised delivery timelines tied to the original delivery period. A key differentiator is the requirement to obtain Detailed Design Drawings approval within 5 days of award, with modifications issued by the Buyer if necessary. No BOQ items are listed, indicating a potentially simplified product scope focused on standard pedestal fans suitable for defence facilities. The buyer also reserves the right to extend delivery time in line with quantity changes and extended delivery periods.
Product/service: Pedestal Fans for Indian Army requirements
Delivery location: Leh, Jammu & Kashmir (194101)
Experience criterion: 3 years of regular govt manufacturing/supply of same category products
Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Technical compliance: Malicious Code Certificate for hardware/software
Drawing approval: Detailed Design Drawings due within 5 days of award; Buyer approval or modification list within 5 days
Quantity variant: Option to increase up to 25% of bid quantity; delivery period adjusted accordingly
Option Clause permits up to 25% quantity increase during contract at contracted rates
Detailed Design Drawings must be submitted within 5 days of award for Buyer approval
GST responsibility lies with bidder; reimbursement per actuals or applicable lower rate
GST-related reimbursement as per actuals or applicable rates; payment terms not explicitly defined in data
Delivery period linked to original delivery period; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
No explicit LD details provided; LD framework would be governed by general contract terms and option clause extensions
3 years of govt/PSU supply experience in similar pedestal fan category
Compliance with PAN, GSTIN, and EFT mandate requirements
Submission of Detailed Design Drawings within 5 days of award and adherence to 5-day modification cycle
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Pedestal Fan
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Electronics Limited (bel)
HYDERABAD, TELANGANA
Bharat Electronics Limited (bel)
BANGALORE, KARNATAKA
Indian Army
Bharat Electronics Limited (bel)
BANGALORE, KARNATAKA
Hindustan Aeronautics Limited (hal)
LUCKNOW, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Copies of contracts to support 3-year govt supply experience
Malicious Code Certificate
Detailed Design Drawings submitted within 5 days of award
Proof of GST payment or GST compliance documents as applicable
Key insights about JAMMU AND KASHMIR tender market
To participate, bidders must meet 3-year govt supply experience, provide PAN, GSTIN, and EFT Mandate documents, and submit Detailed Design Drawings within 5 days of award. Ensure compliance with Malicious Code Certificate and be prepared for 25% quantity variation under the option clause.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, proof of 3-year govt supply contracts, and Malicious Code Certificate. Also submit Detailed Design Drawings within 5 days of award and any relevant OEM authorizations if applicable.
Technical requirements focus on standard pedestal fan suitability for defence facilities, with mandatory Detailed Design Drawings within 5 days of award and a Malicious Code Certificate for hardware/software components. A 25% quantity flexibility during contract is allowed with corresponding delivery timeline adjustments.
Delivery period starts from the last date of the original delivery order. If the option clause is exercised, additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extensions may not exceed the original delivery period.
No explicit EMD amount is provided in the tender data; bidders should anticipate standard EMD practices per govt procurement and verify with the issuing authority during bid submission, noting the 25% quantity extension option and design drawing requirements.
Bidders must determine GST applicability themselves; GST reimbursement will be as per actuals or the lower of the quoted GST rate. Ensure GSTIN is provided and GST certificate is available for verification during vendor code creation.
Submit Detailed Design Drawings within 5 days of award. The Buyer will approve or list required modifications within 5 days. If approvals delay, the delivery period is refixed without LD for the delay period; ensure alignment with the 25% quantity option.
The bidder or OEM must have regularly manufactured and supplied the same or similar category products to Central/State Government or PSU for 3 years prior to bid opening, with contract proofs from each year showing quantity supplied.
Indian Army
📍 PITHORAGARH, UTTARAKHAND
Indian Army
📍 PITHORAGARH, UTTARAKHAND
Indian Army
📍 KOLKATA, WEST BENGAL
Security Printing And Minting Corporation Of India Limited (spmcil)
📍 HYDERABAD, TELANGANA
Indian Coast Guard
📍 ERNAKULAM, KERALA
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS