TenderDekho Logo
GEM

BHEL Uttarakhand Transformer Tender for Neepco Turial Project Current/Voltage Transformers 2026

Bid Publish Date

21-May-2026, 3:35 pm

Bid End Date

11-Jun-2026, 3:00 pm

Progress

Issue21-May-2026, 3:35 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

9

Category

Ru7403298721 Current Transformer Neepco Turial Project

Bid Type

Two Packet Bid

Categories 4

Tender Overview

Bharat Heavy Electricals Limited (BHEL) invites bids for Current Transformer and Voltage Transformer procurement tied to the Neepco Turial Project in Udham Singh Nagar, Uttarakhand. The scope references transformer components with a focus on quality and traceability; bidders must demonstrate alignment with BHEL’s QA/QAP and obtain end-customer approval. The contract emphasizes strict drawing submission timelines, material dispatch controls, and post-award inspections. Notable differentiators include mandatory MDCC-driven dispatch, third-party inspection coordination, and specific penalties for inspection lapses. This procurement targets vendors capable of meeting BHEL’s QA standards and delivering through the GeM contracting channel.

Technical Specifications & Requirements

  • Warranty/Guaranty Period: 30 months from receipt at site or 24 months from commissioning, whichever is earlier. Requires test certificate and warranty/guaranty certificate with material.
  • Post-PO Drawings: Vendor must submit drawings within 1 week of PO date; delays trigger delivery implications. Delivery schedule begins from PO/drawing approval date; MDCC governs dispatch.
  • Inspection & Dispatch: Material dispatched after MDCC from BHEL; inspections via BHEL CQIR portal with TPIA; penalties apply for inspection lapses or NIL-offered material.
  • Packaging & Identification: Proper packing per attached standards with clear identification to prevent damage.
  • Vendor Approval: End-customer approval required before price bid opening; BHEL reserves right to reject non-approved vendors.

Terms, Conditions & Eligibility

  • Documentation & Proof: Signed, sealed copies of attached technical specifications and approved QAP along with offer/catalogue; lack of documents deemed acceptance of all terms.
  • Delivery Schedule: Material delivery within the GeM contract schedule post MDCC; inspection outcomes influence dispatch timeline.
  • Third-Party Inspection: Charges paid by vendor; penalties for non-compliance or rejection of offered material during inspection.
  • Packing & Transport: Material packed per standard instructions; transport identified to prevent transit damage.
  • Vendor Requirements: Only vendors approved by end customer are considered; BHEL reserves right to reject non-approved bidders.

Key Specifications

  • Warranty/Guaranty: 30 months from receipt at site or 24 months from commissioning, whichever earlier; require test certificate and warranty certificate

  • Drawing submission: within 1 week from PO date; delay impacts delivery schedule

  • MDCC: Material Dispatch Clearance Certificate required for dispatch; governs delivery timeline

  • Inspection: Vendor to raise inspection via BHEL CQIR; third-party inspection by TPIA; inspection charges may be penalties if non-compliant

  • Packaging: proper packing per attached standard with clear identifications to prevent transit/storage damage

Terms & Conditions

  • EMD not explicitly stated in data; ensure readiness per end-customer norms and GeM terms

  • End-customer approval mandatory before price bid opening; non-approved bidders risk disqualification

  • Delivery; MDCC-based dispatch with potential delays if drawings/QA are not approved timely

  • Inspection regime via CQIR portal and TPIA; penalties apply for NIL material or rejected items

  • Warranty terms fixed: 30 months receipt-based or 24 months commissioning-based

Important Clauses

Payment Terms

Not explicitly provided; payment terms to be aligned with BHEL GeM contract schedule and MDCC clearance after successful inspection

Delivery Schedule

Delivery commences from PO/drawing approval date; MDCC governs dispatch; delays due to drawing submission impact delivery timelines

Penalties/Liquidated Damages

Inspection-related penalties if NIL material offered, rejected material, or lapses in meeting QAP/technical specs; third-party inspection charges payable by vendor

Bidder Eligibility

  • Vendor must be approved by end customer prior to price bid opening

  • Compliance with BHEL QA/QAP and OEM-authorized specifications

  • Capability to submit drawings within 1 week of PO and achieve MDCC-based dispatch

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Ru7403294300 Current Transformer Neepco Turial Project , Ru7403298721 Current Transformer Neepco Turial Project , Ru7403399331 Voltage Transformer Neepco Turial Project

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 14

GeM-Bidding-9361196.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

BHEL Current Transformer Balimela Project Tender Udham Singh Nagar Uttarakhand 2026

Bharat Heavy Electricals Limited (bhel)

UDHAM SINGH NAGAR, UTTARAKHAND

Posted: 24 January 2026
Closed: 21 February 2026
GEM

RU7403295277 CURRENT TRANSFORMER YADADRI PROJECT,RU7403295285 CURRENT TRANSFORMER YADADRI PROJECT,R

Bharat Heavy Electricals Limited (bhel)

NALGONDA, TELANGANA

Posted: 9 January 2025
Closed: 30 January 2025
GEM

RU7403294254 CURRENT TRANSFORMER RAMMAM PROJECT

Bharat Heavy Electricals Limited (bhel)

UDHAM SINGH NAGAR, UTTARAKHAND

Posted: 7 May 2025
Closed: 28 May 2025
GEM

RU7403499034 Voltage Transformer, Pipalkoti Project,RU7403499050 Voltage Transformer, Pipalkoti Pro

Bharat Heavy Electricals Limited (bhel)

UDHAM SINGH NAGAR, UTTARAKHAND

Posted: 2 June 2025
Closed: 2 July 2025
GEM

RU7403499034 Voltage Transformer, Pipalkoti Project,RU7403499050 Voltage Transformer, Pipalkoti Pro

Bharat Heavy Electricals Limited (bhel)

UDHAM SINGH NAGAR, UTTARAKHAND

Posted: 15 December 2025
Closed: 5 January 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar transformer procurement

4

Financial statements (recent, audited if available)

5

EMD/Security deposit documentation

6

Technical bid documents and compliance certificates

7

OEM authorization/authorizations from transformer manufacturers

8

Quality Assurance Plan (QAP) and approved technical specifications

9

Packing and shipping compliance documents

10

Drawings/design approvals submitted within 1 week of PO

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for BHEL transformer tender in Uttarakhand 2026?

Bidders must be end-customer approved, submit signed technical specifications and QAP, provide GST, PAN, experience certificates, financials, and EMD as per GeM terms. Ensure drawings are submitted within 7 days of PO and align with MDCC dispatch deadlines; comply with CQIR inspection.

What documents are required for BHEL Neepco transformer procurement in Udham Singh Nagar?

Required documents include GST certificate, PAN card, experience certificates for transformer projects, financial statements, EMD documentation, OEM authorizations, technical bid documents, QAP, and approved technical specifications; packing standards and CQIR-compliant inspection details may be requested.

What are the warranty terms for BHEL transformers at the Neepco Turial Project?

Warranty is 30 months from receipt at site or 24 months from commissioning, whichever is earlier; a test certificate and warranty certificate must accompany the material; warranty coverage applies to the transformer components specified in the QAP.

When does delivery start after PO for BHEL Uttarakhand tender?

Delivery schedule begins from PO/drawing approval date; MDCC governs dispatch; delays in drawing submission (within 1 week) may extend delivery timelines and affect project milestones.

What is required for third-party inspection in this BHEL tender?

Vendor must raise an inspection call on the BHEL CQIR portal; inspection is conducted by BHEL/TPIA/Customer per QAP; charges for inspection may be penalties if NIL material is offered or material is rejected.

What standards or certifications are mandatory for BHEL transformers tender 2026?

Submit QAP and approved technical specifications; OEM authorizations; ensure conformity with required standards and any ISI/ISO marks if specified; ensure packaging per standard and clear identifications for transport.

Who approves vendors before price bid opening for BHEL Neepco project?

End-customer approval is mandatory; only vendors approved by the end customer are considered for price bid opening; BHEL may reject bidders not meeting end-customer acceptance criteria.

What happens if drawings are delayed after PO in this tender?

Delays in drawing submission trigger delivery delays attributed to the vendor; timeline starts from PO/drawing approval date, and MDCC-based dispatch is required for timely inspection and movement.

Similar Tenders

5 found
Urgent

RU7403294335 CURRENT TRANSFORMER LARA II PROJECT,RU7403294327 CURRENT TRANSFORMER LARA II PROJECT,R

Bharat Heavy Electricals Limited (bhel)

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

BHEL Current Transformer Tender Kuttiyadi Project 2026 - 30 Month Warranty, MDCC Terms, CQIR Inspection

Bharat Heavy Electricals Limited (bhel)

📍 KOZHIKODE, KERALA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

BHEL Current Transformer Sagardighi Project Tender Murshidabad West Bengal 30 Month Warranty ISI/QA Standards 2026

Bharat Heavy Electricals Limited (bhel)

📍 MURSHIDABAD, WEST BENGAL

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Bharat Heavy Electricals Limited (BHEL) NVG Transformer Tender Uttarakhand 30-Month Warranty ISI/QA Compliance 2026

Bharat Heavy Electricals Limited (bhel)

📍 UDHAM SINGH NAGAR, UTTARAKHAND

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

66 kV Current Transformer for Sub-stations / Power Houses (PSPCL))

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

📍 SONBHADRA, UTTAR PRADESH

EMD: ₹37,000
Est: ₹18.1 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Chat with us