BHEL Current Transformer Balimela Project Tender Udham Singh Nagar Uttarakhand 2026
Bharat Heavy Electricals Limited (bhel)
UDHAM SINGH NAGAR, UTTARAKHAND
Bid Publish Date
28-May-2026, 10:17 am
Bid End Date
16-Jun-2026, 3:00 pm
Location
Progress
Quantity
53
Category
RU7403301676 CURRENT TRANSFORMER KUTTIYADI PROJECT
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for a CURRENT TRANSFORMER required for the KUTTIYADI PROJECT. The scope references supplier-compliant equipment delivery with a 30-month warranty from receipt at site or 24 months from commissioning, whichever is earlier. The procurement process includes drawing submission within 1 week from PO date, with delivery commencing from the later of PO/drawing approval. The contract emphasizes strict QA and end-customer approval, with material dispatch following MDCC. The tender integrates third-party inspection via TPIA under BHEL’s CQIR system, and penalties apply for inspection lapses. Packaging must protect against transport/storage damage.
Warranty: 30 months from receipt at site or 24 months from commissioning (whichever earlier) with certificate.
Drawing submission: within 1 week from PO date; delays affect delivery schedule.
MDCC: material dispatch only after MDCC; delivery aligned to inspection results.
Inspection: CQIR portal submission; inspections by BHEL/TPIA/Customer per QAP; penalties for inspection-related failures.
Packaging: proper packing per attached standard/instructions; identification to prevent damage.
Vendor approval must be obtained from end customer before price bid.
Warranty period and commissioning-based timing fixed; provide certificate.
Delivery to commence post drawing approval and MDCC; inspection mandatory.
30-month warranty from receipt at site or 24-months from commissioning; requires TEST CERTIFICATE and WARRANTY/GUARANTY CERTIFICATE.
Submit drawings within 1 week from PO date; delays shift delivery and may incur penalties.
Raise CQIR inspection; third-party inspection charges payable by supplier; penalties for Nil material or rejection.
End-customer approval required prior to price bid
Submission of QAP and approved technical specifications with bid
Compliance with CQIR inspection process and MDCC requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
RU7403301676 CURRENT TRANSFORMER KUTTIYADI PROJECT
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
UDHAM SINGH NAGAR, UTTARAKHAND
Bharat Heavy Electricals Limited (bhel)
HAZARIBAG, JHARKHAND
Bharat Heavy Electricals Limited (bhel)
Bharat Heavy Electricals Limited (bhel)
UDHAM SINGH NAGAR, UTTARAKHAND
Bharat Heavy Electricals Limited (bhel)
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates
Financial statements (last 3 years ideally)
EMD/Security deposit details
Technical bid documents
OEM authorizations or approvals
Signed QAP and approved technical specifications
Test certificates (where applicable)
Bidders must obtain end-customer approval before price bid, submit signed QAP and approved technical specs, and comply with CQIR inspection. The warranty spans 30 months from receipt or 24 months from commissioning, whichever is earlier, and drawings must be provided within 1 week of PO. MDCC governs dispatch timing.
Essential documents include GST certificate, PAN, experience certificates, financial statements, EMD details, technical bid documents, OEM authorizations, and signed QAP; ensure drawings and test certificates are attached to support compliance with IS/is standards as applicable.
Delivery starts after drawing approval and MDCC; material dispatched only post-MDCC; inspections via CQIR portal with BHEL/TPIA; penalties apply for inspection lapses or nil material offered during inspection.
Warranty is 30 months from receipt at site or 24 months from commissioning, whichever is earlier; requires TEST CERTIFICATE and WARRANTY/GUARANTY CERTIFICATE along with material; ensure ISI/IS standards compliance if specified.
Only bids from vendors approved by the end customer will have their price bids opened; unapproved vendors will be rejected; ensure vendor qualification and QAP submission before bid submission.
Materials must be packed per attached packing standards with proper identifications to prevent damage; ensure packaging supports safe transport and storage until installation; attach packing instructions in bid.
Bharat Heavy Electricals Limited (bhel)
Bharat Heavy Electricals Limited (bhel)
📍 UDHAM SINGH NAGAR, UTTARAKHAND
Bharat Heavy Electricals Limited (bhel)
📍 MURSHIDABAD, WEST BENGAL
Bharat Heavy Electricals Limited (bhel)
📍 UDHAM SINGH NAGAR, UTTARAKHAND
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS