Indian Army Automotive Parts Tender India 2025 for Pad Assy Disc, Brake Pad, Wiper Blade & Related Components
Indian Army
DEHRADUN, UTTARAKHAND
Bid Publish Date
06-Jan-2026, 3:55 pm
Bid End Date
16-Jan-2026, 4:00 pm
Progress
Quantity
84
Category
Wiper Arm Assembly
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a broad automotive spare parts procurement across 37 items, including Wiper Arm Assembly, Wiper Blade, Parking Indicator Light RH, Fuse Box Assembly Round, Cabin Lights, Ignition and Rotary Switches, Fuel Gauge, Indicator Bulbs, Head Light Bulb 100W, Oil Seals, Door Glass components, Steering and Clutch assemblies, filters, shocks, mirrors, belts, and labor charges. The bid emphasizes OEM-sourced advance samples and a two-year warranty where applicable, with a flexible quantity clause allowing up to 25% variation. The absence of explicit location and delivery timelines requires bidders to confirm project scope, warranty terms, and delivery logistics in their technical bid. A core differentiator is the option clause for quantity adjustments at contracted rates during and after the original delivery period, demanding robust supply-chain readiness. The tender underscores compliance with certificate uploads and clear performance penalties, shaping a high-reliability procurement for military automotive spares.
Product/service names: automotive spare parts for Indian Army fleet covering 37 item BoQ
Quantities: 37 items total (no explicit unit quantities provided in data)
EMD/Estimated value: not disclosed in buyer terms
Experience: OEM-specified or high-quality supplier with military-grade components
Quality/Standards: OEM specifications; ISI/IS/ISO references not explicitly stated
Option Clause: 25% quantity variation during/after contract at contracted rates
Warranty: 2-year coverage with 3-day defect rectification timeline; penalties 0.5%/week
Advance OEM sample: required two days before tech bid opening; disqualification for non-submission
Delivery: extended delivery period linked to last delivery order; no explicit base timeline
Documentation: mandatory PAN, GST, cancelled cheque, EFT mandate; upload all certificates
Advance sample approval; penalties deducted from PBG for defects; no explicit payment schedule provided in ATC
Quantity variations up to 25% during/after contract; delivery period linked to last original order date
3-day defect rectification window; 0.5% unit price per week of delay; cumulative cap 10% of total contract value
OEM-authorized supplier or clearly demonstrated capability to supply OEM-grade automotive spares
Demonstrated experience in similar government procurement or defense-grade components
Financial stability evidenced by standard corporate documentation and tax registrations
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
TINSUKIA, ASSAM
Indian Army
TAWANG, ARUNACHAL PRADESH
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Wiper Arm Assembly | Wiper Arm Assembly | 2 | nos | oic_wsgrsr | 30 |
| 2 | Wiper Blade | Wiper Blade | 2 | nos | oic_wsgrsr | 30 |
| 3 | Parking indicator Light RH | Parking indicator Light RH | 1 | nos | oic_wsgrsr | 30 |
| 4 | Fuse Box Assy Round | Fuse Box Assy Round | 1 | nos | oic_wsgrsr | 30 |
| 5 | Cabin light | Cabin light | 3 | nos | oic_wsgrsr | 30 |
| 6 | Cabin Tube Light | Cabin Tube Light | 5 | nos | oic_wsgrsr | 30 |
| 7 | Ignition Switch | Ignition Switch | 1 | nos | oic_wsgrsr | 30 |
| 8 | Rotary Switch | Rotary Switch | 1 | nos | oic_wsgrsr | 30 |
| 9 | Fuel Guage | Fuel Guage | 1 | nos | oic_wsgrsr | 30 |
| 10 | Indicator Holder | Indicator Holder | 5 | nos | oic_wsgrsr | 30 |
| 11 | On Off Switch step lamp | On Off Switch step lamp | 1 | nos | oic_wsgrsr | 30 |
| 12 | Door Switch Toway | Door Switch Toway | 2 | nos | oic_wsgrsr | 30 |
| 13 | Guage Bulb 24V 2W | Guage Bulb 24V 2W | 10 | nos | oic_wsgrsr | 30 |
| 14 | Indicator Bulb 24V 10W | Indicator Bulb 24V 10W | 6 | nos | oic_wsgrsr | 30 |
| 15 | Head Light Bulb 100 W | Head Light Bulb 100 W | 2 | nos | oic_wsgrsr | 30 |
| 16 | Eng Tapper Cover Gasket | Eng Tapper Cover Gasket | 1 | nos | oic_wsgrsr | 30 |
| 17 | Oil Seal Gear Box | Oil Seal Gear Box | 1 | nos | oic_wsgrsr | 30 |
| 18 | Door Hydraulic Buster | Door Hydraulic Buster | 2 | nos | oic_wsgrsr | 30 |
| 19 | Hub Oil Seal Frt | Hub Oil Seal Frt | 2 | nos | oic_wsgrsr | 30 |
| 20 | Hub Oil Seal Rear | Hub Oil Seal Rear | 2 | nos | oic_wsgrsr | 30 |
| 21 | Door Glass | Door Glass | 4 | nos | oic_wsgrsr | 30 |
| 22 | Cluth Cyl Rep kit | Cluth Cyl Rep kit | 1 | nos | oic_wsgrsr | 30 |
| 23 | Sleeve Cyl rep Kit | Sleeve Cyl rep Kit | 1 | nos | oic_wsgrsr | 30 |
| 24 | Side View Mirror | Side View Mirror | 2 | nos | oic_wsgrsr | 30 |
| 25 | Wind Shield Glass LH and RH | Wind Shield Glass LH and RH | 2 | nos | oic_wsgrsr | 30 |
| 26 | Fan belt | Fan belt | 1 | nos | oic_wsgrsr | 30 |
| 27 | Gear Lever Rep Kit | Gear Lever Rep Kit | 1 | nos | oic_wsgrsr | 30 |
| 28 | Fuel Filter | Fuel Filter | 1 | nos | oic_wsgrsr | 30 |
| 29 | Water Separator | Water Separator | 1 | nos | oic_wsgrsr | 30 |
| 30 | Fuel Filter Insert | Fuel Filter Insert | 1 | nos | oic_wsgrsr | 30 |
| 31 | Shock Absorber Front | Shock Absorber Front | 2 | nos | oic_wsgrsr | 30 |
| 32 | Oil Seal Differential | Oil Seal Differential | 1 | nos | oic_wsgrsr | 30 |
| 33 | Hand Brake Assy | Hand Brake Assy | 1 | nos | oic_wsgrsr | 30 |
| 34 | Steering Clamp Brg | Steering Clamp Brg | 2 | nos | oic_wsgrsr | 30 |
| 35 | Oil Filter | Oil Filter | 1 | nos | oic_wsgrsr | 30 |
| 36 | Handle for passenger seat | Handle for passenger seat | 10 | nos | oic_wsgrsr | 30 |
| 37 | Labor charges | Labor charges | 1 | job | oic_wsgrsr | 30 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
OEM authorizations or confirmations (as applicable)
Technical bid documents and certificates
Any required Certificates uploaded per ATC/Corrigendum
Proof of sample submission (advance OEM sample requirement)
Bidders must prepare PAN, GST, cancelled cheque, and EFT mandate; upload OEM-specified samples, certs, and technical bid documents per ATC. Ensure compliance with the 25% quantity option and 2-year warranty; submit within the bid window and verify sample submission before tech bid opening.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by Bank, OEM authorizations, and all certificates referenced in ATC/Corrigendum. Ensure technical bid documents are complete and sample evidence is provided ahead of evaluation.
The tender lists 37 items such as Wiper Arm Assembly, Wiper Blade, Parking Indicator Light RH, Fuse Box Assembly Round, Cabin Lighting, Ignition Switch, Rotary Switch, Fuel Gauge, Indicator Bulbs, Head Lamp Bulb 100W, and related seals and gears. OEM-item quality and adherence to OEM specifications are essential, with warranty expectations clearly defined.
Delivery is tied to the last date of the original delivery order with a potential 25% quantity increase during or after the contract at the same contracted rates. If the extended period is required, schedule should align with the calculated duration based on original quantities, subject to minimum 30 days.
A two-year warranty applies to relevant items with defect rectification within 3 days of notification. If delays occur, penalties are 0.5% of unit price per week, up to a 10% contract-value cap, after which the buyer may procure from alternate sources, and the PBG may be forfeited.
An advance OEM sample must reach the unit two days before the technical bid opening. If not provided, bidders risk disqualification. Samples must be OEM items or top-quality equivalents as per OEM specifications to pass inspection.
The ATC specifies OEM-grade parts with OEM specifications; while IS or ISO codes are not explicitly listed, suppliers should align with OEM standards and obtain relevant certificates/upload certifications required by the bidding terms and conditions.
The purchaser may increase or decrease the quantity by up to 25% at the contracted rates. During currency, an additional delivery window is calculated as (extra quantity/original quantity) × original delivery period, subject to a minimum 30 days, which bidders must plan for in production capacity.
Indo Tibetan Border Police (itbp)
📍 LOHIT, ARUNACHAL PRADESH
Indian Army
📍 JALANDHAR, PUNJAB
Indian Army
📍 PUNE, MAHARASHTRA
Indian Army
📍 KACHCHH, GUJARAT
Indian Army
📍 BIKANER, RAJASTHAN
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS