TenderDekho Logo
GEM

Procurement Opportunity: CLUTCH FORK ASSEMBLY SA6,CLUTCH FORK ASSEMBLY SA25,CLUTCH FORK ASSEMBLY SA100,WORM SHAFT ASSEMBLY S in KANPUR DEHAT, UTTAR PRADESH

Bid Publish Date

02-Aug-2025, 6:51 pm

Bid End Date

19-Aug-2025, 7:00 pm

Generate Docs

Progress

Issue02-Aug-2025, 6:51 pm
Corrigendum12-Aug-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1025

Category

WORM SHAFT ASSEMBLY SA50 DOUBLE

Bid Type

Single Packet Bid

Categories 38

Public procurement opportunity for Neyveli Uttar Pradesh Power Limited CLUTCH FORK ASSEMBLY SA6, CLUTCH FORK ASSEMBLY SA25, CLUTCH FORK ASSEMBLY SA100, WORM SHAFT ASSEMBLY S in KANPUR DEHAT, UTTAR PRADESH. Quantity: 1025 issued by. Submission Deadline: 19-08-2025 19: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF COAL

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8174829.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

CLUTCH FORK ASSEMBLY SA6,CLUTCH FORK ASSEMBLY SA25,CLUTCH FORK ASSEMBLY SA100,WORM SHAFT ASSEMBLY S

Neyveli Uttar Pradesh Power Limited

KANPUR DEHAT, UTTAR PRADESH

Posted: 21 August 2025
Closed: 1 September 2025
GEM

Clutch Shaft Assembly (Details as per Buyer Specification document)

Bharat Heavy Electricals Limited (bhel)

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 17 December 2025
Closed: 1 January 2026
GEM

Gear Reducer,Drive Shaft Assembly,Drive Shaft 175

Bhilai Steel Plant

DURG, CHHATTISGARH

Posted: 9 July 2025
Closed: 19 July 2025
GEM

SM463050034-WORM SHAFT AND WORM WHEEL SET FOR SPR 115/116 SLEW GEAR BOX AS PER DRAWING NO: SME-107/

Nlc India Limited

CUDDALORE, TAMIL NADU

Posted: 8 May 2025
Closed: 30 May 2025
GEM

Wheel Bearing Rear,Wheel Bearing Front,Clutch Plate,Clutch Release Bearing,Front Hub Bearing,Clutch

N/A

KUPWARA, JAMMU & KASHMIR

Posted: 1 July 2025
Closed: 22 July 2025
GEM

Bill of Quantities (BOQ) 185 Items Sign in for GEM prices

#1

CLUTCH FORK ASSEMBLY SA6

As per Technical Specification attached

10 nos Delivery: 280 days
#2

CLUTCH FORK ASSEMBLY SA25

As per Technical Specification attached

10 nos Delivery: 280 days
#3

CLUTCH FORK ASSEMBLY SA100

As per Technical Specification attached

10 nos Delivery: 280 days
#4

WORM SHAFT ASSEMBLY SA3 SINGLE

As per Technical Specification attached

8 nos Delivery: 280 days
#5

WORM SHAFT ASSEMBLY SA6 SINGLE

As per Technical Specification attached

8 nos Delivery: 280 days
#6

WORM SHAFT ASSEMBLY SA12 SINGLE

As per Technical Specification attached

8 nos Delivery: 280 days
#7

WORM SHAFT ASSEMBLY SA12 DOUBLE

As per Technical Specification attached

2 nos Delivery: 280 days
#8

WORM SHAFT ASSEMBLY SA15 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#9

WORM SHAFT ASSEMBLY SA25 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#10

WORM SHAFT ASSEMBLY SA25 DOUBLE

As per Technical Specification attached

5 nos Delivery: 280 days
#11

WORM SHAFT ASSEMBLY SAR6 SINGLE

As per Technical Specification attached

3 nos Delivery: 280 days
#12

WORM SHAFT ASSEMBLY SA30 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#13

WORM SHAFT ASSEMBLY SA30 DOUBLE

As per Technical Specification attached

4 nos Delivery: 280 days
#14

WORM SHAFT ASSEMBLY SA50 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#15

WORM SHAFT ASSEMBLY SA50 DOUBLE

As per Technical Specification attached

5 nos Delivery: 280 days
#16

WORM SHAFT ASSEMBLY SA60 SINGLE

As per Technical Specification attached

3 nos Delivery: 280 days
#17

WORM SHAFT ASSEMBLY SA60 DOUBLE

As per Technical Specification attached

5 nos Delivery: 280 days
#18

WORM SHAFT ASSEMBLY SA100 SINGLE

As per Technical Specification attached

4 nos Delivery: 280 days
#19

WORM SHAFT ASSEMBLY SA100 DOUBLE

As per Technical Specification attached

4 nos Delivery: 280 days
#20

O RING KIT FOR SA3 SA6 ACTUATOR

As per Technical Specification attached

10 nos Delivery: 280 days
#21

O RING KIT FOR SA12 SA15 ACTUATOR

As per Technical Specification attached

10 nos Delivery: 280 days
#22

O RING KIT FOR SA25 SA60 ACTUATOR

As per Technical Specification attached

10 nos Delivery: 280 days
#23

O RING KIT FOR SA100 ACTUATOR

As per Technical Specification attached

3 nos Delivery: 280 days
#24

OIL SEAL KIT FOR SA3 SA6 ACTUATOR

As per Technical Specification attached

10 nos Delivery: 280 days
#25

OIL SEAL KIT FOR SA12 SA15 ACTUATOR

As per Technical Specification attached

10 nos Delivery: 280 days
#26

OIL SEAL KIT FOR SA25 SA60 ACTUATOR

As per Technical Specification attached

10 nos Delivery: 280 days
#27

OIL SEAL KIT FOR SA100 ACTUATOR

As per Technical Specification attached

3 nos Delivery: 280 days
#28

HOLLOW DRIVE SHAFT ASSEMBLY SA3 6 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#29

HOLLOW DRIVE SHAFT ASSEMBLY SA12 15 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#30

HOLLOW DRIVE SHAFT ASSEMBLY SA25 30 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#31

HOLLOW DRIVE SHAFT ASSEMBLY SA50 60 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#32

HOLLOW DRIVE SHAFT ASSEMBLY SA100 SINGLE

As per Technical Specification attached

5 nos Delivery: 280 days
#33

HOLLOW DRIVE SHAFT ASSEMBLY SA12 15 DOUBLE

As per Technical Specification attached

2 nos Delivery: 280 days
#34

HOLLOW DRIVE SHAFT ASSEMBLY SA25 30 DOUBLE

As per Technical Specification attached

5 nos Delivery: 280 days
#35

HOLLOW DRIVE SHAFT ASSEMBLY SA50 60 DOUBLE

As per Technical Specification attached

5 nos Delivery: 280 days
#36

HOLLOW DRIVE SHAFT ASSEMBLY SA100 DOUBLE

As per Technical Specification attached

3 nos Delivery: 280 days
#37

LIMIT SWITCH 2NO 2NC 0.75SQMM 780MM

As per Technical Specification attached

15 nos Delivery: 280 days
#38

TORQUE SWITCH 2NO 2NC 0.75SQMM

As per Technical Specification attached

15 nos Delivery: 280 days
#39

LIMIT SWITCH 2NO 2NC 0.75SQMM

As per Technical Specification attached

5 nos Delivery: 280 days
#40

TORQUE SWITCH 2NO 2NC 0.75SQMM

As per Technical Specification attached

5 nos Delivery: 280 days
#41

LIMIT SWITCH DRIVE ASSEMBLY F SA6

As per Technical Specification attached

15 nos Delivery: 280 days
#42

LIMIT SWITCH DRIVE ASSEMBLY F SA25

As per Technical Specification attached

8 nos Delivery: 280 days
#43

LIMIT SWITCH DRIVE ASSEMBLY F SA100

As per Technical Specification attached

5 nos Delivery: 280 days
#44

TWO TRAIN ASSEMBLY 480 TURNS

As per Technical Specification attached

1 nos Delivery: 280 days
#45

FOUR TRAIN ASSEMBLY 4800 TURNS

As per Technical Specification attached

3 nos Delivery: 280 days
#46

FOUR TRAIN ASSEMBLY 480 TURNS

As per Technical Specification attached

8 nos Delivery: 280 days
#47

TORQUE SWITCH DRIVE ASSEMBLY FOR SA3 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#48

TORQUE SWITCH DRIVE ASSEMBLY FOR SA6 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#49

TORQUE SWITCH DRIVE ASSEMBLY FOR SA12 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#50

TORQUE SWITCH DRIVE ASSEMBLY FOR SA15 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#51

TORQUE SWITCH DRIVE ASSEMBLY FOR SA25 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#52

TORQUE SWITCH DRIVE ASSEMBLY FOR SA30 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#53

TORQUE SWITCH DRIVE ASSEMBLY FOR SA50 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#54

TORQUE SWITCH DRIVE ASSEMBLY FOR SA60 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#55

TORQUE SWITCH DRIVE ASSEMBLY FOR SA100 TANDEM

As per Technical Specification attached

8 nos Delivery: 280 days
#56

MOTOR MD0V 071 00.120 4 415Y5 F8 80 0000 KN S AI 02

As per Technical Specification attached

1 nos Delivery: 280 days
#57

MOTOR MD0V 063 00.060 4 415Y5 F8 80 0000 KN S AI 751

As per Technical Specification attached

1 nos Delivery: 280 days
#58

MOTOR MD0V 063 00.120 4 415Y5 F8 80 0000 KN S AI 752

As per Technical Specification attached

1 nos Delivery: 280 days
#59

MOTOR MD0V 071 00.250 4 415Y5 F8 80 0000 KN S AI 04

As per Technical Specification attached

1 nos Delivery: 280 days
#60

MOTOR MD0R 071 00.250 4 415Y5 F8 80 0000 KN S AI 33

As per Technical Specification attached

1 nos Delivery: 280 days
#61

MOTOR MD0V 063 00.180 2 415Y5 F8 80 0000 KN S AI 753

As per Technical Specification attached

1 nos Delivery: 280 days
#62

MOTOR MD0V 063 00.370 2 415Y5 F8 80 0000 KN S AI 754

As per Technical Specification attached

1 nos Delivery: 280 days
#63

MOTOR MD0V 071 00.370 2 415Y5 F8 80 0000 KN S AI 05

As per Technical Specification attached

1 nos Delivery: 280 days
#64

MOTOR MD0V 071 00.550 2 415Y5 F8 80 0000 KN S AI 06

As per Technical Specification attached

1 nos Delivery: 280 days
#65

MOTOR MD0V 071 00.550 4 415Y5 F8 80 0000 KN S AI 07

As per Technical Specification attached

1 nos Delivery: 280 days
#66

MOTOR MD0V 071 01.100 2 415Y5 F8 80 0000 KN S AI 08

As per Technical Specification attached

1 nos Delivery: 280 days
#67

MOTOR MD0V 090 01.250 2 415Y5 F8 80 0000 KN S AI 10

As per Technical Specification attached

1 nos Delivery: 280 days
#68

MOTOR MD0V 090 02.200 2 415Y5 F8 80 0000 KN S AI 11

As per Technical Specification attached

1 nos Delivery: 280 days
#69

MOTOR MD0V 090 02.500 2 415Y5 F8 80 0000 KN S AI13

As per Technical Specification attached

1 nos Delivery: 280 days
#70

MOTOR MD0V 160 30.000 2 415D5 F8 80 0000 KN S AI 930

As per Technical Specification attached

1 nos Delivery: 280 days
#71

MOTOR MD0V 090 04.000 2 415Y5 F8 80 0000 KN S AI 14

As per Technical Specification attached

1 nos Delivery: 280 days
#72

MOTOR MD0V 112 05.000 2 415Y5 F8 80 0000 KN S AI 17

As per Technical Specification attached

1 nos Delivery: 280 days
#73

MOTOR MD0V 112 07.500 2 415Y5 F8 80 0000 KN S AI 16

As per Technical Specification attached

1 nos Delivery: 280 days
#74

EPAC MODULE COMPLETE V1.A S35 FOR HIGH TQ. ACTUATOR

As per Technical Specification attached

3 nos Delivery: 280 days
#75

POWER MODULE FOR 3 WDP 37644 ZDEA101A A9A00

As per Technical Specification attached

3 nos Delivery: 280 days
#76

POWER MODULE FOR 3WD EPAC C 1.1 37882 R6 ZDEA101A A9A00

As per Technical Specification attached

2 nos Delivery: 280 days
#77

POWER MODULE FOR 3WD EPAC C 1.1 339105 ZDEA101A A9A00

As per Technical Specification attached

15 nos Delivery: 280 days
#78

POWER MODULE FOR 3WD EPAC C 1.1 339105R1 ZDEA101A A9A00

As per Technical Specification attached

8 nos Delivery: 280 days
#79

POWER MODULE 3WD EPAC C 1.1 339106 ZDEA101A A9A00

As per Technical Specification attached

6 nos Delivery: 280 days
#80

POWER MODULE FOR 3WD EPAC C 1.1 339106R1 ZDEA101A A9A00

As per Technical Specification attached

3 nos Delivery: 280 days
#81

POWER MODULE FOR 3WD EPAC 1.1 31484 ZDAB1C1A A2A00.

As per Technical Specification attached

10 nos Delivery: 280 days
#82

POWER MODULE FOR for 3WD EPAC C 1.1 37882 R6 ZDEA101A A9A00

As per Technical Specification attached

10 nos Delivery: 280 days
#83

POWER MODULE 3WD EPAC C 1.1 37882 R7 ZDEA101A A9A00

As per Technical Specification attached

10 nos Delivery: 280 days
#84

POWER MODULE FOR 3WD EPAC C 1.1 37883 R6 ZDEA1F1A A9A00

As per Technical Specification attached

10 nos Delivery: 280 days
#85

POWER MODULE FOR 3WD EPAC C 1.1 37883 R7 ZDEA1F1A A9A00.

As per Technical Specification attached

10 nos Delivery: 280 days
#86

CONTROL MODULE FOR 3 WDP 37644 ZDEA101A A9A00

As per Technical Specification attached

3 nos Delivery: 280 days
#87

CONTROL MODULE 3WD EPAC C 1.1 37882 R6 ZDEA101A A9A00

As per Technical Specification attached

2 nos Delivery: 280 days
#88

CONTROL MODULE 3WD EPAC C 1.1 39105 ZDEA101A A9A00

As per Technical Specification attached

15 nos Delivery: 280 days
#89

CONTROL MODULE 3WD EPAC C 1.1 39105R1 ZDEA101A A9A00

As per Technical Specification attached

8 nos Delivery: 280 days
#90

CONTROL MODULE 3WD EPAC C 1.1 39106 ZDEA101A A9A00

As per Technical Specification attached

6 nos Delivery: 280 days
#91

CONTROL MODULE 3WD EPAC C 1.1 39106R1 ZDEA101A A9A00

As per Technical Specification attached

3 nos Delivery: 280 days
#92

CONTROL MODULE 3WD EPAC 1.1 31484 ZDAB1C1A A2A00.

As per Technical Specification attached

10 nos Delivery: 280 days
#93

CONTROL MODULE F 3WD EPAC C 1.1 37882 R6 ZDEA101A A9A00

As per Technical Specification attached

10 nos Delivery: 280 days
#94

CONTROL MODULE 3WD EPAC C 1.1 37882 R7 ZDEA101A A9A00

As per Technical Specification attached

10 nos Delivery: 280 days
#95

CONTROL MODULE 3WD EPAC C 1.1 37883 R6 ZDEA1F1A A9A00

As per Technical Specification attached

10 nos Delivery: 280 days
#96

CONTROL MODULE 3WD EPAC C 1.1 37883 R7 ZDEA1F1A A9A00.

As per Technical Specification attached

10 nos Delivery: 280 days
#97

PUSH BUTTON COVER SUB ASLY FOR LED EPAC 2POLE W O KEY CARD

As per Technical Specification attached

5 nos Delivery: 280 days
#98

PUSH BUTTON COVER SUB ASLY FOR LED EPAC 2POLE W O KEY CARD

As per Technical Specification attached

5 nos Delivery: 280 days
#99

PUSH BUTTON COVER SUB ASLY FOR EPAC C LCD EPAC 2P W O KEYCAR

As per Technical Specification attached

15 nos Delivery: 280 days
#100

PUSH BUTTON COVER SUB ASLY FOR EPAC C LCD EPAC 2P W O KEYCAR

As per Technical Specification attached

5 nos Delivery: 280 days
#101

PUSH BUTTON COVER SUB ASLY FOR EPAC C LCD EPAC 2P W O KEYCAR

As per Technical Specification attached

5 nos Delivery: 280 days
#102

PUSH BUTTON COVER SUB ASLY FOR EPAC C LCD EPAC 2P W O KEYCAR

As per Technical Specification attached

5 nos Delivery: 280 days
#103

REVERSING A63 30 00 110V BEM75 30 VE5 2 HI.TQ

As per Technical Specification attached

5 nos Delivery: 280 days
#104

REVERSING CONTACTOR MECH.INTERLOCKECD 9A3P110V 1NO

As per Technical Specification attached

5 nos Delivery: 280 days
#105

REVERSING 9A NO 110V TC1 M9 FOR 3 WDP 37644

As per Technical Specification attached

3 nos Delivery: 280 days
#106

REVERSING 9A NO 110V TC1 M9 FOR 3WD EPAC C 1.1 39105

As per Technical Specification attached

10 nos Delivery: 280 days
#107

REVERSING 9A NO 110V TC1 M9 FOR 3WD EPAC C 1.1 39105R1

As per Technical Specification attached

4 nos Delivery: 280 days
#108

REVERSING 9A NO 110V TC1 M9 FOR 3WD EPAC C 1.1 39106

As per Technical Specification attached

4 nos Delivery: 280 days
#109

REVERSING 9A NO 110V TC1 M9 FOR 3WD EPAC C 1.1 39106R1

As per Technical Specification attached

2 nos Delivery: 280 days
#110

REVERSING C 9A NO 110V TC1 M9 FOR 3WD EPAC C 1.1 37882 R6

As per Technical Specification attached

1 nos Delivery: 280 days
#111

REVERSING 16A3P 110V 1NO FOR 3WD EPAC C 1.1 39105

As per Technical Specification attached

4 nos Delivery: 280 days
#112

REVERSING 16A3P 110V 1NO FOR 3WD EPAC C 1.1 39106

As per Technical Specification attached

1 nos Delivery: 280 days
#113

REVERSING 9A NO 110V MC009

As per Technical Specification attached

3 nos Delivery: 280 days
#114

ASSY OF VB6 NO K210.251 3PH CONTACTOR WITH REVERSING LINKS

As per Technical Specification attached

3 nos Delivery: 280 days
#115

REVERSING CONTACTOR WITH INTERLOCK LINKS 9A NO 110V MC009

As per Technical Specification attached

3 nos Delivery: 280 days
#116

REVERSING CONTACTOR WITH INTERLOCK LINKS 9A NO 110V MC009

As per Technical Specification attached

3 nos Delivery: 280 days
#117

ASSY OF VB6 NO K210.251 3PH CONTACTOR WITH REVERSING LINKS

As per Technical Specification attached

3 nos Delivery: 280 days
#118

REVERSING CONTACTOR WITH INTERLOCK LINKS 9A NO 110V MC009

As per Technical Specification attached

3 nos Delivery: 280 days
#119

R I CONVERTER RWG 2002 2 WIRE CONTACT TYPE EPT

As per Technical Specification attached

3 nos Delivery: 280 days
#120

SUB ASLY EWG 2 WIRE SA SAR TYPE STD CRIMPING ASSESSORIE

As per Technical Specification attached

3 nos Delivery: 280 days
#121

SUB ASLY EWG 2 WIRE SA SAR TYPE AG TYPE ASSESSORIES

As per Technical Specification attached

3 nos Delivery: 280 days
#122

film potentiometer 5000 Ohm 250 with pins

As per Technical Specification attached

2 nos Delivery: 280 days
#123

TOLR 11.0 17.0A BR1H17L

As per Technical Specification attached

5 nos Delivery: 280 days
#124

TOLR 1.20 1.80A BR1M18L

As per Technical Specification attached

5 nos Delivery: 280 days
#125

TOLR 0.80 1.20A BR1M12L

As per Technical Specification attached

5 nos Delivery: 280 days
#126

TOLR 2.80 4.0A BR1M40L

As per Technical Specification attached

5 nos Delivery: 280 days
#127

TOLR 4.0 6.30A BR1M63L

As per Technical Specification attached

10 nos Delivery: 280 days
#128

TOLR 1.80 2.80A BR1M28L

As per Technical Specification attached

5 nos Delivery: 280 days
#129

TOLR 0.28 0.40A BR1L40L

As per Technical Specification attached

5 nos Delivery: 280 days
#130

TOLR 0.40 0.63A BR1L63L

As per Technical Specification attached

10 nos Delivery: 280 days
#131

TOLR 10.0 15.0A BR1H15L

As per Technical Specification attached

4 nos Delivery: 280 days
#132

TOLR 8.0 12.5A BR1H12L

As per Technical Specification attached

6 nos Delivery: 280 days
#133

RGU CHANGE GEARS SA25 1000 1

As per Technical Specification attached

5 nos Delivery: 280 days
#134

RGU CHANGE GEARS SA25 107 1

As per Technical Specification attached

5 nos Delivery: 280 days
#135

RGU CHANGE GEARS SA25 11 1

As per Technical Specification attached

5 nos Delivery: 280 days
#136

RGU CHANGE GEARS SA6 13.5 1

As per Technical Specification attached

5 nos Delivery: 280 days
#137

RGU CHANGE GEARS SA25 150 1

As per Technical Specification attached

5 nos Delivery: 280 days
#138

RGU CHANGE GEARS SA25 180 1

As per Technical Specification attached

5 nos Delivery: 280 days
#139

RGU CHANGE GEARS SA6 19 1

As per Technical Specification attached

5 nos Delivery: 280 days
#140

RGU CHANGE GEARS SA25 19 1

As per Technical Specification attached

5 nos Delivery: 280 days
#141

RGU CHANGE GEARS SA6 22 1

As per Technical Specification attached

5 nos Delivery: 280 days
#142

RGU CHANGE GEARS SA6 250 1

As per Technical Specification attached

5 nos Delivery: 280 days
#143

RGU CHANGE GEARS SA25 250 1

As per Technical Specification attached

10 nos Delivery: 280 days
#144

RGU CHANGE GEARS SA6 27 1

As per Technical Specification attached

5 nos Delivery: 280 days
#145

RGU CHANGE GEARS SA25 27 1

As per Technical Specification attached

5 nos Delivery: 280 days
#146

RGU CHANGE GEARS SA25 300 1

As per Technical Specification attached

5 nos Delivery: 280 days
#147

RGU CHANGE GEARS SA6 32 1

As per Technical Specification attached

5 nos Delivery: 280 days
#148

RGU CHANGE GEARS SA25 355 1

As per Technical Specification attached

5 nos Delivery: 280 days
#149

RGU CHANGE GEARS SA6 38 1

As per Technical Specification attached

5 nos Delivery: 280 days
#150

RGU CHANGE GEARS SA25 38 1

As per Technical Specification attached

5 nos Delivery: 280 days
#151

RGU CHANGE GEARS SA6 4 1

As per Technical Specification attached

10 nos Delivery: 280 days
#152

RGU CHANGE GEARS SA6 5.6 1

As per Technical Specification attached

5 nos Delivery: 280 days
#153

RGU CHANGE GEARS SA25 500 1

As per Technical Specification attached

5 nos Delivery: 280 days
#154

RGU CHANGE GEARS SA6 54 1

As per Technical Specification attached

5 nos Delivery: 280 days
#155

RGU CHANGE GEARS SA25 54 1

As per Technical Specification attached

5 nos Delivery: 280 days
#156

RGU CHANGE GEARS SA6 6.7 1

As per Technical Specification attached

5 nos Delivery: 280 days
#157

RGU CHANGE GEARS SA25 6.7 1

As per Technical Specification attached

5 nos Delivery: 280 days
#158

RGU CHANGE GEARS SA25 600 1

As per Technical Specification attached

5 nos Delivery: 280 days
#159

RGU CHANGE GEARS SA25 63 1

As per Technical Specification attached

5 nos Delivery: 280 days
#160

RGU CHANGE GEARS SA6 8 1

As per Technical Specification attached

5 nos Delivery: 280 days
#161

RGU CHANGE GEARS SA25 8 1

As per Technical Specification attached

5 nos Delivery: 280 days
#162

RGU CHANGE GEARS SA25 9.5 1

As per Technical Specification attached

5 nos Delivery: 280 days
#163

RGU CHANGE GEARS SA6 9.5 1

As per Technical Specification attached

5 nos Delivery: 280 days
#164

RGU CHANGE GEARS SA6 13.5 1

As per Technical Specification attached

5 nos Delivery: 280 days
#165

RGU CHANGE GEARS SA6 45 1

As per Technical Specification attached

5 nos Delivery: 280 days
#166

RGU CHANGE GEARS SA6 63 1

As per Technical Specification attached

5 nos Delivery: 280 days
#167

RGU CHANGE GEARS SA6 150 1

As per Technical Specification attached

5 nos Delivery: 280 days
#168

RGU CHANGE GEARS SA25 16 1

As per Technical Specification attached

5 nos Delivery: 280 days
#169

RGU CHANGE GEARS SA25 63 1

As per Technical Specification attached

5 nos Delivery: 280 days
#170

RGU CHANGE GEARS SA25 76 1

As per Technical Specification attached

5 nos Delivery: 280 days
#171

RGU CHANGE GEARS SA25 125 1

As per Technical Specification attached

5 nos Delivery: 280 days
#172

RGU CHANGE GEARS SA25 300 1

As per Technical Specification attached

5 nos Delivery: 280 days
#173

RGU CHANGE GEARS SA25 600 1

As per Technical Specification attached

5 nos Delivery: 280 days
#174

RGU CHANGE GEARS SA25 710 1

As per Technical Specification attached

5 nos Delivery: 280 days
#175

RGU CHANGE GEARS SA25 1400 1

As per Technical Specification attached

5 nos Delivery: 280 days
#176

WHEEL SA6 Z 38 DIA 70.6x10 32RPM

As per Technical Specification attached

10 nos Delivery: 280 days
#177

WHEEL SA6 Z 29 DIA 55.7x10 63 125RPM

As per Technical Specification attached

10 nos Delivery: 280 days
#178

WHEEL SA6 Z 24 DIA 47.5x10 90 180RPM

As per Technical Specification attached

5 nos Delivery: 280 days
#179

WHEEL SA6 Z 33 DIA 62.06x10 45RPM

As per Technical Specification attached

10 nos Delivery: 280 days
#180

WHEEL SA25 Z 42 DIA 110.7X18 32RPM

As per Technical Specification attached

5 nos Delivery: 280 days
#181

WHEEL SA25 Z 32 DIA 87.5x18 63 125RPM

As per Technical Specification attached

5 nos Delivery: 280 days
#182

WHEEL SA25 Z 37 DIA 97.5x18 22 45RPM

As per Technical Specification attached

5 nos Delivery: 280 days
#183

WHEEL SA25 Z 27 DIA 75x18 90 180RPM

As per Technical Specification attached

10 nos Delivery: 280 days
#184

WHEEL SA100 Z 27 DIA 96.6x22 90 180RPM

As per Technical Specification attached

5 nos Delivery: 280 days
#185

WHEEL SA100 Z 32 DIA 112.9x22 63 125RPM

As per Technical Specification attached

5 nos Delivery: 280 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

12-Aug-2025

Extended Deadline

19-Aug-2025, 7:00 pm

Opening Date

19-Aug-2025, 7:30 pm

Similar Tenders

5 found

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited FEED ROLL SHAFT & RC Feeder Parts Tender Sonbhadra 2026

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

📍 SONBHADRA, UTTAR PRADESH

EMD: ₹300
Est: ₹8.6 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Indian Army Supply of Automotive Components Tender Jalandhar Punjab 2026 IS 550 Standards 1 Year Warranty

Indian Army

📍 JALANDHAR, PUNJAB

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Department Of Military Affairs Tender Jamnagar Gujarat 360510 - ISH Components (Clutch Plates, Stator Winding, Control Valve) 2026

Indian Army

📍 JAMNAGAR, GUJARAT

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

WORM GEAR / 155.15. 109-1,WORM WHEEL / 155.15. 110

Armoured Vehicles Nigam Limited

📍 TIRUVALLUR, TAMIL NADU

EMD: ₹16,407
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

PLUG SPARK,CABLE COMP THROTTLE,WIPER ARM,WIPER BLADE,ASSY WIPER MOTOR 17W24W,LINK ROD 1004 LONG,ASS

Indian Army

📍 DARJEELING, WEST BENGAL

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM