ROTARY SWITCH,TAIL LIGHT ASSY,BONNET SHOCKER,SPIDER BEARING,INDICATOR LIGHT,FILTER,ROOP LIGHT,STEER
Indian Army
SENAPATI, MANIPUR
Progress
Quantity
20
Category
TAIL LIGHT
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for multiple automotive components, covering items such as tail lights, bonnet shockers, air filters, fan belts, clutch and pressure plates, head light assemblies, and door locks in SENAPATI, MANIPUR 795007. The scope lists 8 items in the BOQ with N/A quantities, and requires supplier compliance with GST and OEM certificates, plus a sample item at the unit location. An option clause allows +/- 25% quantity adjustments at contracted rates, with a delivery timeline linked to the original delivery order and extended periods. This procurement emphasizes standard-compliant, quality automotive parts and supplier readiness to provide samples for evaluation.
Key technical context includes: 8 BOQ items (no specific quantities or units provided); item-level standards not stated; mandatory documentation includes GST certificate and OEM certificate; supplier must provide a sample of item as per reqmt at unit location and ensure overall item quality. The ATC requires adherence to the option clause for quantity variation up to 25%, and delivery time calculation: (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. No explicit product standards are listed in the available data.
Mandatory submissions include GST certificate, OEM certificate, and a sample item produced for unit verification. The buyer reserves the right to adjust quantity by 25% and to extend delivery windows accordingly. Bidders must comply with these terms, while providing required general documents (GST, PAN, financial statements) and evidence of OEM authorization as part of bid compliance.
BOQ items: 8 total; specific quantities and units not disclosed
Essential documents: GST certificate, OEM certificate, item sample at unit location
Quantity variation: ±25% allowed during contract and currency of contract
Delivery timeline: computed as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days
Quality assurance: sample submission for quality check at unit location
Option clause allows ±25% quantity changes with contracted rates
Mandatory GST and OEM certificates; sample item at unit location required
Delivery period calculations include minimum 30 days and potential extensions
Delivery window expands with quantity variations; minimum 30 days; period starts from last date of original delivery order
Submit GST certificate, OEM certificate, and sample at unit location; no explicit EMD amount stated
Purchaser may alter quantity by up to 25% during contract; extended delivery period applies if option exercised
GST registration with valid certificate
OEM authorization or certificate from original equipment manufacturer
Ability to supply automotive spares for tail lights and related components
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TAIL LIGHT , BONNET SHOCKER , AIR FILTER , FAN BELT , CLUTCH PLATE , PRESSURE PLATE , HEAD LIGHT ASSY , DOOR LOCK
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Senapati
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Senapati | Senapati | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SENAPATI, MANIPUR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
SONITPUR, ASSAM
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
KANGRA, HIMACHAL PRADESH
Tender Results
Loading results...
TAIL LIGHT
TAIL LIGHT
BONNET SHOCKER
BONNET SHOCKER
AIR FILTER
AIR FILTER
FAN BELT
FAN BELT
CLUTCH PLATE
CLUTCH PLATE
PRESSURE PLATE
PRESSURE PLATE
HEAD LIGHT ASSY
HEAD LIGHT ASSY
DOOR LOCK
DOOR LOCK
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | TAIL LIGHT | TAIL LIGHT | 1 | nos | consignee210cts | 30 | |
| 2 | BONNET SHOCKER | BONNET SHOCKER | 4 | nos | consignee210cts | 30 | |
| 3 | AIR FILTER | AIR FILTER | 2 | nos | consignee210cts | 30 | |
| 4 | FAN BELT | FAN BELT | 1 | nos | consignee210cts | 30 | |
| 5 | CLUTCH PLATE | CLUTCH PLATE | 6 | nos | consignee210cts | 30 | |
| 6 | PRESSURE PLATE | PRESSURE PLATE | 3 | nos | consignee210cts | 30 | |
| 7 | HEAD LIGHT ASSY | HEAD LIGHT ASSY | 2 | nos | consignee210cts | 30 | |
| 8 | DOOR LOCK | DOOR LOCK | 1 | nos | consignee210cts | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about MANIPUR tender market
Bidders must submit GST registration, OEM authorization, and a sample item at the unit location. Ensure compliance with the option clause allowing ±25% quantity changes and provide complete KYC and financials. Include all required bid documents and ensure quality of samples matches the unit's expectations.
Required documents include GST certificate, PAN card, OEM certificate/authorization, company financial statements, experience certificates, and a sample item demonstration at the unit location. These must accompany the technical bid to verify compliance and sample quality.
Bidders must provide a physical sample of the item as per the requisition at the unit location. The sample should reflect quality standards, material specifications, and fitment compatibility with the specified automotive parts, ensuring assessment aligns with unit expectations.
The purchaser reserves the right to ±25% variation in bid quantity at contract placement and during currency, with extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Mandatory certifications include GST certificate and OEM certificate. These confirm tax registration and original equipment manufacturing authorization, critical for eligibility and bid evaluation.
Delivery extensions are triggered by quantity variation; additional time follows the formula and must meet the minimum 30-day rule, ensuring schedule alignment with increased or decreased orders.
Provide OEM authorization certificates or official OEM letters, demonstration of sample part conformity to unit requirements, and alignment with the specified category of tail lights, filters, belts, and locks.
The BOQ lists 8 items in total, including tail lights, bonnet shockers, air filters, fan belts, clutch and pressure plates, head light assemblies, and door locks, though explicit quantities and units are not disclosed publicly.
Indian Army
📍 RANCHI, JHARKHAND
Indian Army
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 PUNE, MAHARASHTRA
Indian Army
📍 HISAR, HARYANA
Indian Army
📍 PANCHKULA, HARYANA
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS