Punjab National Bank Air Conditioner Procurement Wall Mount ISI Marked to IS1391 Part 2 2026 Tender
Punjab National Bank
MUMBAI, MAHARASHTRA
Bid Publish Date
16-Jun-2026, 5:31 pm
Bid End Date
26-Jun-2026, 6:00 pm
Location
Progress
Quantity
23
Bid Type
Two Packet Bid
The Regional Rural Banks (RRB) in Uttar Pradesh invites bids for a Split Air Conditioner, Wall Mount Type (V3) ISI Marked compliant with IS 1391 (Part 2). The tender location is Gonda, Uttar Pradesh 271001. Although the exact quantity and estimated value are not disclosed, the contract includes an option clause allowing up to 25% quantity variation during placement and currency. Bidders must be prepared for potential delivery extensions based on calculated timeframes and original delivery periods. A key differentiator is the emphasis on ISI marking compliance and structured service support readiness.
EMD amount not specified in data; bidders should verify on tender portal
Quantity can vary by up to 25% during contract and currency terms
Service centers must be functional in each consignee state or established within 30 days
Delivery timeline linked to original delivery order date; extended time rules apply
Purchaser may increase/decrease quantity up to 25% at contract award and during currency at contracted rates; delivery period adjustments follow a defined formula with minimum 30 days.
Bidder/OEM must have a functional service centre in each consignee state; if absent, establish within 30 days of contract award; payment contingent on documentary proof.
Bidders must provide a dedicated toll-free service line and a formal escalation matrix for service issues.
Proven experience in supplying and supporting ISI marked HVAC equipment
Demonstrated ability to establish/maintain service centers in Uttar Pradesh
Compliance with ISI 1391 (Part 2) and other applicable standards
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Punjab National Bank
MUMBAI, MAHARASHTRA
Punjab National Bank
MUMBAI, MAHARASHTRA
Odisha Police
KHORDHA, ODISHA
Central Institute Of Plastics Engineering And Technology (cipet)
CHENNAI, TAMIL NADU
Mecon Limited
RANCHI, JHARKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar AC supply/installation
Financial statements or turnover proof
EMD/security deposit (if applicable per bid terms)
Technical bid documents demonstrating ISI Marked compliance
OEM authorizations (if bidding as a reseller)
Warranty and service center details
Key insights about UTTAR PRADESH tender market
Bidders must confirm ISI 1391 (Part 2) compliance, provide ISI certificate, submit GST, PAN, financials, and experience certificates, and ensure a functional service center in UP. The option clause allows +/-25% quantity variation; delivery timelines hinge on the original order date and extended periods.
Required documents include GST registration, PAN card, experience certificates for similar AC installations, financial statements demonstrating turnover, EM D/Security deposit details, OEM authorizations if applicable, and technical bid showing ISI compliance and installation capabilities.
Delivery periods start from the last date of the original delivery order with possible extensions. Payment terms commonly link to delivery and service center compliance; ensure documentary evidence of a functional UP service center before payment release and be prepared for the 30-day establishment window if needed.
Bidders must comply with IS 1391 (Part 2) for the wall mount split AC; ISI marking is mandatory, and the product should meet all referenced ISI certification requirements as part of the bid responsiveness.
Plan for scale adjustments by budgeting for a potential ±25% quantity change; ensure pricing remains valid across variations; delivery timelines adjust based on the calculated time formula with a 30-day minimum extension as a safeguard.
Bidders must operate a dedicated toll-free service line and provide an escalation matrix. If a state-wise service center does not exist, establish one within 30 days of award and provide documentary proof to enable payment processing.
OEMs may bid directly if they provide official OEM authorization; resellers must supply proper authorizations. A functional service center in UP or a clear plan to establish one within 30 days is essential for eligibility and payment viability.
Directorate Of Coordination Police Wireless
📍 CENTRAL DELHI, DELHI
Canara Bank
📍 RANCHI, JHARKHAND
Chhattisgarh State Industrial Development Corporation Limited (csidc)
📍 RAIPUR, CHHATTISGARH
Indian Council Of Medical Research (icmr)
📍 HYDERABAD, TELANGANA
Indian Council Of Medical Research (icmr)
📍 HYDERABAD, TELANGANA
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS