Led Bulb Fog Lamp,Assy Fuel Filter,Air Filter Element,Assy Oil Filter,AC Filter,Spark Plug,Ignition
Indian Army
Bid Publish Date
16-Jul-2026, 10:58 am
Bid End Date
27-Jul-2026, 11:00 am
Location
Progress
Quantity
57
Category
HEAD LAMP
Bid Type
Two Packet Bid
Organization: Indian Army, Department Of Military Affairs. Procurement: automotive spare parts across multiple categories including HEAD LAMP, SHOCK ABSORBER ASSEMBLY, TAIL LAMP ASSEMBLY, FOG LAMP, OIL FILTER ELEMENT, FUEL FILTER, DRIVER FAN 24V, IGNITION COIL, BRAKE HOSE, HOSE RADIATOR, DOOR TRIM. Estimated Value: not disclosed. Location: India (national defense procurement) with delivery and installation obligations as per contract. Quantity: ambiguous; option clause allows up to 25% quantity increase/decrease at bid/contract; delivery period linked to original schedule with minimum 30 days. Key differentiator: inclusion of advance sample approval prior to bulk manufacturing; performance conformity to contract specifications or modification cycles. Context: buyer emphasizes non-obsolescence, post-award sampling, andGST considerations managed by the bidder.
Head Lamp, Tail Lamp Assembly, Fog Lamp, Oil Filter Element, Fuel Filter, Driver Fan 24V, Ignition Coil, Brake Hose, Hose Radiator, Door Trim
Quantity flexibility up to 25% of bid quantity
Advance sample approval within 5 days post-award
5-day response window for sample approvals and modifications
Bidder to provide GSTIN, PAN, cancelled cheque, EFT mandate
Delivery quantity may vary ±25% during and after contract at contracted rates
Advance sample approval required within 5 days; modification cycle also 5 days
Bidder must provide GST/PAN and EFT mandate; ensure non-obsolescence for at least 5 years
GST treatment as per actuals or applicable rate; reimbursement cap; bidder to handle GST filings
Delivery period linked to last date of original delivery; extended period proportionally calculated with minimum 30 days
No explicit LD details provided; risk remains for contract terms after final bid acceptance
Not under liquidation or bankruptcy; undertaking to this effect
Non-obsolete components with at least 5 years residual market life
GST compliant with proper documentation (PAN, GSTIN, EFT mandate)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
HEAD LAMP , SHOCK ABSORBER ASSY , TAIL LAMP ASSY , FOG LAMP , OIL FILTER ELEMENT , FUEL FILTER , OIL FILTER , DRIVER FAN 24V , IGNITION COIL , BRAKE HOSE , HOSE RADIATOR , DOOR TRIM
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
Gurdaspur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Gurdaspur | Gurdaspur | - | - | 6 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
Indian Army
Indian Army
GANJAM, ODISHA
Tender Results
Loading results...
HEAD LAMP
HEAD LAMP
SHOCK ABSORBER ASSY
SHOCK ABSORBER ASSY
TAIL LAMP ASSY
TAIL LAMP ASSY
FOG LAMP
FOG LAMP
OIL FILTER ELEMENT
OIL FILTER ELEMENT
FUEL FILTER
FUEL FILTER
OIL FILTER
OIL FILTER
DRIVER FAN 24V
DRIVER FAN 24V
IGNITION COIL
IGNITION COIL
BRAKE HOSE
BRAKE HOSE
HOSE RADIATOR
HOSE RADIATOR
DOOR TRIM
DOOR TRIM
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | HEAD LAMP | HEAD LAMP | 6 | nos | buycon7.ina.madhopur | 21 | |
| 2 | SHOCK ABSORBER ASSY | SHOCK ABSORBER ASSY | 8 | nos | buycon7.ina.madhopur | 21 | |
| 3 | TAIL LAMP ASSY | TAIL LAMP ASSY | 16 | nos | buycon7.ina.madhopur | 21 | |
| 4 | FOG LAMP | FOG LAMP | 8 | nos | buycon7.ina.madhopur | 21 | |
| 5 | OIL FILTER ELEMENT | OIL FILTER ELEMENT | 3 | nos | buycon7.ina.madhopur | 21 | |
| 6 | FUEL FILTER | FUEL FILTER | 4 | nos | buycon7.ina.madhopur | 21 | |
| 7 | OIL FILTER | OIL FILTER | 2 | nos | buycon7.ina.madhopur | 21 | |
| 8 | DRIVER FAN 24V | DRIVER FAN 24V | 1 | nos | buycon7.ina.madhopur | 21 | |
| 9 | IGNITION COIL | IGNITION COIL | 2 | nos | buycon7.ina.madhopur | 21 | |
| 10 | BRAKE HOSE | BRAKE HOSE | 4 | nos | buycon7.ina.madhopur | 21 | |
| 11 | HOSE RADIATOR | HOSE RADIATOR | 1 | nos | buycon7.ina.madhopur | 21 | |
| 12 | DOOR TRIM | DOOR TRIM | 2 | nos | buycon7.ina.madhopur | 21 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Cancelled cheque
EFT Mandate certified by bank
Advance sample submission and approval documentation
OEM authorizations (if required by final bid)
Experience certificates and financial statements (as applicable in final terms)
Any technical bid documents demonstrating non-obsolescence and residual market life
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate along with an advance sample within 5 days of award. The buyer will approve or request modifications within 5 days; bulk supply follows the approved sample. Ensure parts are not obsolete and meet OEM timelines.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, and evidence of non-obsolescence with at least 5 years residual life. Also provide advance sample documentation and any OEM authorizations if demanded in the final bid package.
The purchaser may adjust orders by up to 25% of bid quantity at contract placement and during the currency. Delivery time scales adjust proportionally using the formula: (additional quantity / original quantity) × original delivery period, with a minimum of 30 days.
The scope includes HEAD LAMP, TAIL LAMP ASSEMBLY, FOG LAMP, OIL FILTER ELEMENT, FUEL FILTER, DRIVER FAN 24V, IGNITION COIL, BRAKE HOSE, HOSE RADIATOR, and DOOR TRIM. All items must meet non-obsolescence and OEM reliability criteria.
GST is the bidder’s responsibility; reimbursement is offered at actuals or applicable rate, whichever is lower, capped to the quoted GST percentage. Vendors must ensure GST compliance and submit GSTIN evidence during bid submission.
Within 5 days of award, the bidder must submit advance samples. The buyer responds with approval or required modifications within 5 days. If delayed, the delivery period is adjusted accordingly without liquidated damages for the approved sample delay.
Yes. Bidders must supply items that are not end-of-life; offered products should have at least 5 years residual market life and must not be declared end-of-life by the OEM during this period.
Delivery periods may be extended under the option clause up to 25% of the contracted quantity. The extended period should align with original delivery timelines, subject to the minimum 30 days rule and proportional calculation.
Indian Army
📍 DEHRADUN, UTTARAKHAND
Indian Army
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 JHANSI, UTTAR PRADESH
Indian Army
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS