Indian Army DoMA Armature & Drive Assemblies Tender ISO 9001 2026 – Field Coils, Hoses, Spark Plugs
Indian Army
Bid Publish Date
15-Feb-2026, 11:36 am
Bid End Date
25-Feb-2026, 12:00 pm
Progress
Quantity
17
Category
Pump assy fuel part no 15100M830A1
Bid Type
Two Packet Bid
Indian Army through the Department Of Military Affairs invites bids for a diverse range of spare parts including pump assy fuel, engine front mounting, proximity sensor, drive end flange, lens tail lamp, V belt, and related components (part nos as listed). The procurement scope references 12 BOQ items with unspecified quantities, and the contract includes an option clause allowing a 25% quantity variation at contracted rates. Delivery timing hinges on the last delivery order date, with a defined formula for extended periods. Bidders must meet mandatory documentation and ISO 9001 certification requirements. Location is not disclosed in the notice, and the estimated value is not provided. This tender emphasizes OEM/ISO compliance and adherence to purchaser option logistics.
Product names and categories: fuel pump assembly, mounting hardware, proximity sensor, cam-chain kit, battery cutoff switch, isolator switch, kick starter assembly, tail lamp lens, V belt, drive end flange, clutch drive
Standards: ISO 9001 certification required for bidder or OEM
Delivery: option to increase quantity by up to 25% at contracted rates; delivery period calculative extension formula with minimum 30 days
Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; mandatory certificate uploads
BOQ: 12 items listed with no explicit quantities in this notice
Option Clause allows up to 25% quantity variation during contract
ISO 9001 certification required for bidder or OEM
Submit PAN, GSTIN, cancelled cheque and EFT mandate with bid
Delivery starts from the last date of the original delivery order; if option exercised, extended time computed by (increase/original) × original days, minimum 30 days
Not explicitly stated in the excerpt; bidders should follow standard DMA/Nodal payment practices for similar procurements
Submit PAN, GSTIN, cancelled cheque, EFT mandate; lack of any required certificate may lead to rejection
Must hold ISO 9001 certification (bidder or OEM)
Must submit PAN, GSTIN, cancelled cheque, and EFT mandate
Compliance with vendor code creation and T&Cs as per DMA procurement
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
Indian Army
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Pump assy fuel part no 15100M830A1 | MARUTI | 2 | nos | buycon7.defence.jk | 15 |
| 2 | Mounting engine front part no 5340-135143 | MARUTI | 2 | nos | buycon7.defence.jk | 15 |
| 3 | Proxmity sensor part no FF403300 | STLN | 1 | nos | buycon7.defence.jk | 15 |
| 4 | Chain sprocket lit part no 20-K-110 | HH | 1 | nos | buycon7.defence.jk | 15 |
| 5 | Cam chain kit part no 22-K-130 | HH | 1 | nos | buycon7.defence.jk | 15 |
| 6 | Battery cotoff switch part no 2573-5450-9931 | TMB | 3 | nos | buycon7.defence.jk | 15 |
| 7 | Isolator switch part no 2920-72-0000349 | STLN VF | 1 | nos | buycon7.defence.jk | 15 |
| 8 | Arm assy comp kick starter part no 29620-72-0000349 | HH | 1 | nos | buycon7.defence.jk | 15 |
| 9 | Lens tail lamp part no 6220-004467 | RE | 1 | nos | buycon7.defence.jk | 15 |
| 10 | V belt 12-5X900 part no 008618 | MPVC | 2 | nos | buycon7.defence.jk | 15 |
| 11 | Drive end flange assy part no P-9900600 | STLN VF | 1 | nos | buycon7.defence.jk | 15 |
| 12 | Clutch drive part no P-1324239 | STLN VF | 1 | nos | buycon7.defence.jk | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
ISO 9001 certificate (bidder or OEM)
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and ISO 9001 certificate (bidder or OEM). Also upload all bid documents and certificates stated in the tender terms. Ensure vendor code creation documents are completed to participate.
The purchaser may increase or decrease quantity by up to 25% at contracted rates. Delivery time adjusts from the last date of the original order; extended time uses the formula (additional quantity / original quantity) × original delivery period, minimum 30 days.
Bidders must hold ISO 9001 certification for themselves or the OEM of offered products. This certification is a gating requirement; failure to upload certificates can lead to rejection, per the bid terms.
The scope includes pump assembly fuel, engine front mounting parts, proximity sensors, chain sprockets, cam chain kits, battery cutoff switches, isolator switches, kick starter assemblies, tail lamp lenses, V belts, drive end flange assemblies, and clutch drive components listed by part numbers.
Delivery starts from the last date of the original delivery order; if extended due to the option clause, the new period is calculated with a minimum 30 days, ensuring a structured supply schedule for military needs.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and ISO 9001 certification (either bidder or OEM). Ensure all mandatory documents are uploaded to avoid bid rejection per Buyer Added Terms.
Bidders must provide PAN, GSTIN, cancelled cheque, and EFT mandate; align with the vendor code creation process outlined in the bid document, and ensure ISO 9001 status is indicated for eligibility.
Provide a valid ISO 9001 certificate for the bidder or the OEM of the offered products. The certificate must be current and verifiable, and its submission is mandatory for bid acceptance.
Eastern Coalfields Limited
📍 BARDHAMAN, WEST BENGAL
Northern Coalfields Limited
📍 SONBHADRA, UTTAR PRADESH
Indian Army
Indian Army
Indian Army
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS