Indian Army Procurement Tender for Amn PD, LMG PD, MMG PD, UG Living Bunker in Kupwara, JAMMU & KASHMIR 2026
Indian Army
KUPWARA, JAMMU & KASHMIR
Bid Publish Date
18-Jun-2026, 8:23 pm
Bid End Date
02-Jul-2026, 7:00 pm
EMD
₹5,50,000
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for AMN BUNKER (STEEL) in RAJAURI, JAMMU & KASHMIR (PIN 185131). The contract requires submission of Detailed Design Drawings within 5 days of award, with approval or modification lists provided within 5 days. Delivery and installation occur at KRISHNA GHATI -1, RAJOURI. The project carries an EMD of ₹550,000 and mandates OEM/authorized supplier involvement for installation and commissioning.
Unique requirements include non-obsolescence assurances (minimum 7 years residual market life), data sheet alignment with offered products, and mandatory vendor financial standing proof. The bidder must avoid liquidation and provide an undertaking. GST handling is on the bidder, with reimbursement as per actuals or the applicable rate up to the quoted GST percentage.
Bidder qualification emphasizes 3 years of government-sector manufacturing/supply experience for identical or similar category products, supported by relevant contracts across years, with focus on the primary product value in bunch bids.
Product: AMN BUNKER (STEEL) suitable for defense infrastructure
EMD: ₹550,000
Delivery: KRISHNA GHATI-1, Rajouri
Experience: 3 years in govt manufacturing/supply of similar products
Data Sheet alignment with offered specifications; no mismatch
Installation/Testing by OEM/OEM certified personnel
GST handling by bidder; reimbursement per actuals or applicable rate, capped at quoted GST%
Delivery/installation timeline aligned to approval of Detailed Design Drawings; delays due to drawing approvals may shift delivery without LD
LD provisions not specified; delivery shifts mentioned without LD for drawing-approval delays
Non-liquidation/bankruptcy status with undertaking
Regular manufacturing and supply to Govt/PSU for 3 years
OEM or OEM-certified reseller for installation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
AMN BUNKER (STEEL) (S&C)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Armed Forces Tribunal
Yantra India Limited
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of offered product
Contract copies supporting 3-year govt supply experience
ND Declaration on bidder letterhead
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and vendor code documents, plus a detailed Data Sheet. Provide 3 years govt-supply experience with contract copies. Ensure Detailed Design Drawings are prepared within 5 days of award and approved within 5 days; installation by OEM personnel.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, Data Sheet matching offered specs, and contracts proving 3 years of govt/PSU supply experience. Also submit a Non-Disclosure Declaration on your letterhead and vendor code creation documents.
Specific technical parameters are supported by a Data Sheet to be uploaded with the bid. While no separate specs are listed, alignment between Data Sheet and offered product is mandatory; any mismatch can lead to bid rejection.
The EMD amount is ₹550,000. It must be submitted in line with tender norms; ensure payment mechanism aligns with online or demand draft per buyer instructions, and include the reference in bid submission.
Within 5 days of contract award, the bidder must submit Detailed Design Drawings for Buyer approval. The Buyer will approve or provide modification lists within 5 days; delays shift the delivery timeline but incur no LD for Buyer-side drawing delays.
Bidders must demonstrate 3 years of regular manufacturing and supply of the same or similar category products to Central/State Government bodies or PSUs. Provide copies of relevant contracts showing annual activity across the years.
Installation, testing and commissioning, if in scope, must be performed by OEM / OEM Certified resource or OEM authorized Reseller. This ensures compatibility with the Detailed Design Drawings and ensures warranty alignment with OEM standards.
GST is the bidder’s responsibility; reimbursement will be as per actuals or the applicable rates, whichever is lower, and capped to the quoted GST percentage. bidders should calculate GST accurately in their bids.
Indian Army
📍 RAJAURI, JAMMU & KASHMIR
Indian Army
📍 RAJAURI, JAMMU & KASHMIR
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
Yantra India Limited
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS