Humidity Control device Split Type One Point Five Ton,Humidity Control device Window type One Point
Indian Army
JODHPUR, RAJASTHAN
Bid Publish Date
16-Jun-2026, 8:20 pm
Bid End Date
26-Jun-2026, 9:00 pm
Location
Progress
Quantity
14
The Indian Army, Department Of Military Affairs, seeks procurement of multiple equipment categories including Humidity Control Units (1.5 Ton and 2 Ton), Voltage Control Units, Water Dispensers, Copper Wire 10mm Roll, and Oil Heaters in Jhansi, Uttar Pradesh 284001. The scope includes quantity adjustments up to 25% at contract award and during currency, with delivery timelines linked to the original delivery period. Bid submission requires essential identification and banking documents with an emphasis on document completeness and product verification. The tender emphasizes bidder compliance, product verification, and the buyer’s right to accept or reject bids based on document quality and product suitability.
Humidity Control Unit 1.5 Ton
Humidity Control Unit 2 Ton
Voltage Control Unit
Water Dispenser
Copper Wire 10mm Roll
Oil Heater
Quantity variation up to 25% during contract and currency
Mandatory document submission: PAN, GSTIN, cancelled cheque, EFT Mandate
Buyer rights to accept or reject bids based on documents and product quality
Not explicitly provided; follow standard tender norms and governing EFT processes
Delivery period commences from last date of original delivery order; extended period formula applies with minimum 30 days
Not specified; typical bid terms imply compliance with delivery and quality standards
Compliance with mandatory document submission (PAN, GSTIN, EFT Mandate)
Ability to supply Humidity Control Units and related equipment in Jhansi, UP
Demonstrable product verification capability and willingness to adhere to buyer ATCs
Tender Category
Goods
Bid To RA
No
Item Category
Humidity Control Unit 1.5 Ton , Humidity Control Unit 2 Ton , Voltage control Unit , Water Dispenser , Copper Wire 10mm Roll , Oil Heater
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JODHPUR, RAJASTHAN
Indian Army
LUCKNOW, UTTAR PRADESH
Indian Army
UDAIPUR, RAJASTHAN
Indian Army
North Goa, GOA
Indian Army
MEERUT, UTTAR PRADESH
Tender Results
Loading results...
Humidity Control Unit 1.5 Ton
Humidity Control Unit 1.5 Ton
Humidity Control Unit 2 Ton
Humidity Control Unit 2 Ton
Voltage control Unit
Voltage control Unit
Water Dispenser
Water Dispenser
Copper Wire 10mm Roll
Copper Wire 10mm Roll
Oil Heater
Oil Heater
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Humidity Control Unit 1.5 Ton | Humidity Control Unit 1.5 Ton | 2 | pieces | manoj@14mi | 15 | |
| 2 | Humidity Control Unit 2 Ton | Humidity Control Unit 2 Ton | 1 | pieces | manoj@14mi | 15 | |
| 3 | Voltage control Unit | Voltage control Unit | 3 | pieces | manoj@14mi | 15 | |
| 4 | Water Dispenser | Water Dispenser | 3 | pieces | manoj@14mi | 15 | |
| 5 | Copper Wire 10mm Roll | Copper Wire 10mm Roll | 3 | pieces | manoj@14mi | 15 | |
| 6 | Oil Heater | Oil Heater | 2 | pieces | manoj@14mi | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by Bank
Product detail verification for all supplied items
Any vendor code creation documentation
Key insights about UTTAR PRADESH tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate along with product specifications for Humidity Control Units (1.5 and 2 Ton) and allied items. Ensure product verification, complete bidder details, and compliance with option clause allowing quantity adjustments up to 25%. Delivery timelines follow original delivery period with possible extensions. adhere to buyer ATC clauses.
Required documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank. Also provide product detail verification for all items and any vendor code creation documentation. These ensure eligibility and enable the buyer to assess document quality before award.
The buyer may increase or decrease quantity up to 25% at contract award and during currency. Delivery time is calculated as (increase quantity ÷ original quantity) × original delivery period with a minimum of 30 days extension if needed, ensuring schedule alignment with original terms.
Categories include Humidity Control Units (1.5 Ton and 2 Ton), Voltage Control Unit, Water Dispenser, Copper Wire 10mm Roll, and Oil Heater. Bidders should prepare conformant models with verifiable specifications and supplier details for each item in the BOQ.
Submit detailed product specifications, manufacturer/vendor certifications, test reports, and ensure all items meet buyer verification standards. The buyer reserves the right to reject bids with substandard documentation or suspected quality issues, so full technical compliance is essential.
Exact submission date is not provided in the data; bidders should monitor the procurement portal and ATC notices. Prepare PAN, GSTIN, EFT Mandate, and product details ahead of the deadline to ensure timely submission once dates are published.
While not specified here, Army tenders typically require ISI/ISO certification and product verification. Ensure humidity units, water dispensers, and wiring comply with relevant IS standards and obtain manufacturer certifications or third-party test reports to bolster bid competitiveness.
Confirm mandatory document submission (PAN, GSTIN, EFT Mandate), verify product details for all items, and demonstrate capability to supply within Jhansi. Ensure compliance with option clause and buyer ATCs, and provide evidence of quality and supplier credentials to secure award.
Indian Army
Indian Army
N/a
📍 THANE, MAHARASHTRA
Field Operations Division (fod)
📍 KANGRA, HIMACHAL PRADESH
Indian Army
📍 MEERUT, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS