TenderDekho Logo
Get OEM Verified in 20 Days Apply
GEM

Indian Army Department Of Military Affairs Thermostat Water Universal Joint Absorber Assembly Tender Jammu 2026

Bid Publish Date

29-Jun-2026, 7:51 pm

Bid End Date

09-Jul-2026, 8:00 pm

Progress

Issue29-Jun-2026, 7:51 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

26

Categories 20

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement of mechanical assemblies for multiple listed items in JAMMU, JAMMU & KASHMIR. The BOQ comprises 12 items with unspecified quantities. The tender includes an option clause allowing +/- 25% quantity adjustments at contract rates, and the delivery period is pegged to the original schedule with potential extensions. An advance sample approval process is required post-award, with 5 days for submission of 10–12 samples and 5 days for buyer feedback. This tender emphasizes compliance with approved sample specifications to proceed with bulk supply. Unique clauses govern extension of delivery time and handling of sample deviations, ensuring clarity for successful bidders. This opportunity targets suppliers capable of mechanical assemblies relevant to defense equipment and vehicle systems, in a highly regulated environment. Location-specific nuances include Jammu, with potential variations in delivery timelines and quantities during contract execution.

Technical Specifications & Requirements

  • No explicit technical specifications are published in the tender; the title implies parts such as thermostat water components, universal joint assemblies, absorber assemblies, rear shock absorbers, vane pumps, ported hose assemblies, sealing rings, chain sprockets, arm assemblies, clutch plates, oil filters, fan resistors, and tail lamp assemblies.
  • Key contractual mechanics include a 25% quantity variation at award and during contract; delivery time adjustments calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Post-award, bidders must submit 10–12 advance samples within 5 days; approval or modification list issued within 5 days; bulk supply aligned to approved samples; failure to approve may trigger contract termination or revised delivery timelines.
  • No specified EMD or estimated contract value is disclosed; emphasis on compliance with sample-based procurement for defense needs.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% of bid quantity at contract placement and during currency at contracted rates.
  • Advance Sample: Submit 10/12 samples within 5 days of award; buyer to approve or list modifications within 5 days; bulk supply to follow approved sample; delays in approval extend delivery period without LD.
  • Non-conforming samples may lead to fresh samples or contract termination; samples for testing should be supplied by the contractor at no cost.
  • Other mandatory terms include adherence to delivery schedules tied to original delivery order dates and extension rules for extended periods.

Key Specifications

    • Product/service categories implied: thermostat water components, universal joint assemblies, absorber assemblies, rear shock absorbers, zf vane pump, hose assemblies with port, sealing rings, chain sprockets, arm assemblies, clutch plates, oil filters, fan resistors, tail lamp assemblies
    • BOQ: 12 total items; quantities not disclosed
    • Key commercial terms: +/- 25% quantity variation; delivery period based on original schedule with extension rules
    • Advance sample requirement: 10–12 samples within 5 days of award; approval or modification list within 5 days
    • Quality/approval mechanism: bulk supply only after approved sample; deviation could lead to contract termination
    • EMD/estimated value not disclosed in tender data

Terms & Conditions

  • Quantity variation up to 25% at contract time and during currency at contracted rates

  • Advance sample approval process with 10–12 samples in 5 days; modifications provided within 5 days

  • Bulk supply aligned to approved samples; possible contract termination for major deviations

Important Clauses

Delivery Schedule

Delivery commencement linked to last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extension allowed up to original delivery period

Payment Terms

Not disclosed in provided data; payment terms to be aligned with contract after sample approval and bulk supply commencement

Penalties/Liquidated Damages

Not specified; potential termination for non-conforming samples or delays as per buyer discretion

Bidder Eligibility

  • Experience in supplying mechanical assemblies or defense-adjacent components

  • Ability to provide OEM authorizations or approvals (if applicable)

  • Financial capability to sustain trial and bulk production based on contract terms

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Thermostat Water , Universal Joint Assy , Absorber Assy Rear Shock , ZF Vane Pump , 3 8 Hose Assy with Port , Sealing Ring , Chain Sprocket , Arm Assy Comp Kick Starter , Plate Clutch Pressure , Oil Filter , Fan Resistence , Tail Lamp Comb RH

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9535040.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

HOSE RADIATOR TO TANK,SENSOR WATER TEMPRATURE,SPIDER UNIVERSAL JOINT VEHICULAR,ARM WIND SHIELD WIPE

Indian Army

UDHAMPUR, JAMMU & KASHMIR

Posted: 29 August 2025
Closed: 10 September 2025
GEM

water pump Kit,Gasket Cover to Thermostat,Assy Rubber Support LH,Oil Seal Main Shaft,Rubber Bush,As

Indian Army

LEH, JAMMU & KASHMIR

Posted: 24 April 2025
Closed: 19 May 2025
GEM

FAN ASSY,THERMOSTATE,WATER PUMP ASSY,RADIATOR HOSE SET,BOOM MOUNTING PAD,TURBOCHARGER,FUSE BOX,HYD

Indian Army

BATHINDA, PUNJAB

Posted: 9 January 2025
Closed: 30 January 2025
GEM

MOTOR ASSY STARTING,SENSOR OXYGEN,ASSY UNIVERSAL JOINT YOKE,PAD ASSY SET,ABSORBER ASSY REAR SHOCK,S

Indian Army

JHANSI, UTTAR PRADESH

Posted: 27 June 2025
Closed: 18 July 2025
GEM

JOINT ASSY UNIVERSAL,BRAKE SHOE FRONT,SHOCK ABSORBER ASSY,SPEEDOMETER,REGULATOR ASSY RH,HYDRAULIC A

Indian Army

JHANSI, UTTAR PRADESH

Posted: 21 May 2026
Closed: 4 June 2026
GEM

Bill of Quantities (BOQ) 12 Items Sign in for GEM prices

#1

Thermostat Water

Part No 17670M83F00 of MG

3 nos Delivery: 15 days
#2

Universal Joint Assy

Part No 3010-000644 of MG

4 nos Delivery: 15 days
#3

Absorber Assy Rear Shock

Part No 2540-002296 of MG

4 nos Delivery: 15 days
#4

ZF Vane Pump

Part No 2523-2310-0101 of TATA

1 nos Delivery: 15 days
#5

3 8 Hose Assy with Port

Part No 216343900174 of TATA

4 nos Delivery: 15 days
#6

Sealing Ring

Part No 2574-3345-7801 of TATA

4 nos Delivery: 15 days
#7

Chain Sprocket

Part No 20-K-110 of HH

1 nos Delivery: 15 days
#8

Arm Assy Comp Kick Starter

Part No 2830A-KAG-900 of HH

1 nos Delivery: 15 days
#9

Plate Clutch Pressure

Part No 22350-AAF-400 of HH

1 nos Delivery: 15 days
#10

Oil Filter

Part No NK of Toyeto

1 nos Delivery: 15 days
#11

Fan Resistence

Part No NK of LBPV

1 nos Delivery: 15 days
#12

Tail Lamp Comb RH

Part No CDBM32145A002 of LBPV

1 nos Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar mechanical assemblies

4

Financial statements or turnover evidence

5

Evidence of Earnest Money Deposit (EMD) submission

6

Technical bid documents demonstrating capability to supply mechanical assemblies

7

OEM authorizations or approvals (if applicable)

8

Any product-specific certifications referenced in terms

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army mechanical assemblies tender in Jammu?

Bidders must submit standard GST and PAN; provide experience certificates, financials, and any OEM authorizations. Prepare 10–12 advance samples within 5 days of award, await buyer feedback within 5 days, and align bulk supply to the approved sample. Ensure compliance with the 25% variation clause.

What documents are required for the Indian Army Jammu bid?

Submit GST certificate, PAN card, experience certificates for similar assemblies, financial statements, EMD proof, technical bid, and OEM authorization if applicable. Include any defense-specific certifications and proof of capability to deliver mechanical assemblies as listed in the tender scope.

What is the delivery timeline for ordered quantities in this tender?

Delivery timing starts from the last date of the original delivery order; if quantities increase, the extension is calculated as (increased/original quantity) × original period, with a minimum of 30 days. Extensions may be granted up to the original delivery period.

What are the advance sample requirements for bulk manufacturing?

Submit 10–12 samples within 5 days of award; buyer reviews and lists required modifications within 5 days. Bulk supply must adhere to approved samples; delays in approval extend delivery without LD unless specified otherwise.

Are EMD and estimated contract values disclosed for this Jammu tender?

EMD amount and estimated contract value are not disclosed in the available tender data. Bidders should expect to address EMD as per standard government EMD practice and verify during bid publication or addendum if released.

What standards or certifications are required for defense assemblies?

The tender data does not specify exact standards; bidders should rely on OEM specifications and ensure compliance with general defense procurement norms. Prepare to provide OEM approvals and ensure conformity to the product categories listed.

How will quantity variations affect contract pricing in Jammu tender?

Quantity may vary up to 25% at contract placement and during contract currency at contracted rates. Increased quantities trigger recalculated delivery time and require adherence to the approved sample for bulk production.

What happens if the advance sample is not approved in time?

If the advance sample approval is delayed, the delivery period is refixed without liquidated damages for the period of delay. If major deviations occur, buyer may require new samples or terminate the contract after notifying deviations.

Similar Tenders

5 found
Urgent

Indian Army Cylinder Head Gasket & Engine Assembly Parts Tender Udhampur Jammu & Kashmir 2026

Indian Army

📍 UDHAMPUR, JAMMU & KASHMIR

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Solenoid Switches & Automotive Components Tender Kargil Jammu & Kashmir 2026

Indian Army

📍 KARGIL, JAMMU & KASHMIR

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Baramulla automotive spares procurement 2026 Baramulla JK Pressure Plate Head Light Relay TURBO HOSE ISO standards

Indian Army

📍 BARAMULLA, JAMMU & KASHMIR

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Department of Military Affairs Universal Joint and Automotive Parts Tender East Sikkim 2026

Indian Army

📍 EAST SIKKIM, SIKKIM

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

FUEL PIPE,HOSE BRAKE REAR,HOSE PIPE,WASHER,NUT,CLUTCH MASTER CYL R KIT,OVER SWITCH RELAY 24V 10A,AI

Indian Army

📍 FARIDKOT, PUNJAB

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM