GEM

Open Tender for Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification in CHANDRAPUR, MAHARASHTRA

Bid Publish Date

24-Nov-2025, 10:48 am

Bid End Date

04-Dec-2025, 11:00 am

Progress

Issue24-Nov-2025, 10:48 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 2

Chandrapur District Panchayats announces a tender for Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3) in CHANDRAPUR, MAHARASHTRA. Quantity: 1. Submission Deadline: 04-12-2025 11: 00: 00. Last date to apply is approaching fast!

Past Similar Tenders (Historical Results)

5 found

Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification

N/a

GONDIA, MAHARASHTRA

Posted: 12 November 2025
Closed: 22 November 2025
GEM

Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification

N/a

GONDIA, MAHARASHTRA

Posted: 12 November 2025
Closed: 22 November 2025
GEM

Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification

N/a

GONDIA, MAHARASHTRA

Posted: 12 November 2025
Closed: 22 November 2025
GEM

Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification

Ahmednagar Zilla Parishad

AHMEDNAGAR, MAHARASHTRA

Posted: 13 November 2025
Closed: 24 November 2025
GEM

Forest Department Uttar Pradesh Solar PV Water Pumping Systems Tender 2025 Kheri Uttar Pradesh MNRE V2 Standards

N/a

KHERI, UTTAR PRADESH

Posted: 17 November 2025
Closed: 27 November 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Performance Parameter Type of Solar Pumping System Shallow Well (Surface) Solar Pumping Systems with D.C. Motor /PMSM/SRM, Shallow Well (Surface) Solar Pumping Systems with A.C. Induction Motor, Solar Deep Well (Submersible) Pumping Systems with D.C. Motor /PMSM/SRM, Solar Deep Well (Submersible) Pumping Systems with A.C. Induction Motor
Performance Parameter Model Number of SPV Water Pumping System Model-1, Model-2, Model-3, Model-4, Model-5, Model-6, Model-7, Model-8, Model-9, Model-10, Model-11, Model-12, Model-13, Model-14, Model-15, Model-16, Model-17, Model-18, Model-19, Model-20, Model-21, Model-22, Model-23, Model-24, Model-25, Model-26, Model-27, Model-28, Model-29, Model-30, Model-31, Model-32, Model-33, Model-34, Model-35, Model-36, Model-37, Model-38, Model-39
Performance Parameter Power of Solar Photovoltaic (PV) Array [in Watt-peak(Wp)] 900, 1800, 2700, 4800, 6750, 9000, 11250, 18000, 20250, 22500, 13500, 15750, 1200, 3000
Performance Parameter Motor Pump-Set Capacity (in HP) 1, 2, 3, 5, 7.5, 10, 12.5, 20, 22.5, 25, 15, 17.5
Performance Parameter Shut Off Dynamic Head (in meters) 12, 25, 45, 100, 150, 70, 180, 225, 300, 375
Performance Parameter Water Output (in Liters per day) 42000 (from a total head of 30 meters), 42000 (from a total head of 70 meters), 43200 (from a total head of 100 meters), 45000 (from a total head of 70 meters), 45600 (from a total head of 30 meters), 50400 (from a total head of 100 meters), 60750 (from a total head of 100 meters), 63000 (from a total head of 30 meters), 63000 (from a total head of 50 meters), 67200 (from a total head of 70 meters), 68400 (from a total head of 30 meters), 69000 (from a total head of 50 meters), 70875 (from a total head of 100 meters), 72000 (from a total head of 70 meters), 75375 (from a total head of 150 meters), 81000 (from a total head of 100 meters), 81000 (from a total head of 250 meters), 84375 (from a total head of 150 meters), 89100 (from a total head of 10 meters), 90000 (from a total head of 200 meters), 90000 (from a total head of 250 meters), 90450 (from a total head of 150 meters), 91125 (from a total head of 250 meters), 94500 (from a total head of 70 meters), 94500 (from a total head of 100 meters), 95625 (from a total head of 120 meters), 99000 (from a total head of 10 meters), 99000 (from a total head of 200 meters), 100800 (from a total head of 50 meters), 105000 (from a total head of 30 meters), 101250 (from a total head of 70 meters), 101250 (from a total head of 100 meters), 101250 (from a total head of 150 meters), 101250 (from a total head of 200 meters), 101250 (from a total head of 250 meters), 105525 (from a total head of 150 meters), 106875 (from a total head of 120 meters), 110400 (from a total head of 50 meters), 111375 (from a total head of 200 meters), 112500 (from a total head of 200 meters), 114000 (from a total head of 30 meters), 114750 (from a total head of 120 meters), 118125 (from a total head of 100 meters), 118125 (from a total head of 150 meters), 120600 (from a total head of 150 meters), 121500 (from a total head of 100 meters), 123750 (from a total head of 200 meters), 126000 (from a total head of 70 meters), 128250 (from a total head of 120 meters), 132300 (from a total head of 20 meters), 133875 (from a total head of 120 meters), 135000 (from a total head of 70 meters), 135000 (from a total head of 150 meters), 135675 (from a total head of 150 meters), 141750 (from a total head of 50 meters), 141750 (from a total head of 100 meters), 148500 (from a total head of 20 meters), 149625 (from a total head of 120 meters), 150750 (from a total head of 150 meters), 151875 (from a total head of 150 meters), 153000 (from a total head of 120 meters), 155250 (from a total head of 50 meters), 157500 (from a total head of 70 meters), 162000 (from a total head of 100 meters), 165375 (from a total head of 100 meters), 168000 (from a total head of 30 meters), 168750 (from a total head of 70 meters), 168750 (from a total head of 150 meters), 171000 (from a total head of 120 meters), 172125 (from a total head of 120 meters), 178200 (from a total head of 10 meters), 182250 (from a total head of 100 meters), 182400 (from a total head of 30 meters), 189000 (from a total head of 50 meters), 189000 (from a total head of 70 meters), 189000 (from a total head of 100 meters), 191250 (from a total head of 120 meters), 192375 (from a total head of 120 meters), 198000 (from a total head of 10 meters), 202500 (from a total head of 70 meters), 202500 (from a total head of 100 meters), 207000 (from a total head of 50 meters), 212625 (from a total head of 100 meters), 213750 (from a total head of 120 meters), 220500 (from a total head of 70 meters), 235200 (from a total head of 20 meters), 236250 (from a total head of 30 meters), 236250 (from a total head of 50 meters), 236250 (from a total head of 70 meters), 236250 (from a total head of 100 meters), 252000 (from a total head of 70 meters), 256500 (from a total head of 30 meters), 264000 (from a total head of 20 meters), 267300 (from a total head of 10 meters), 270000 (from a total head of 70 meters), 283500 (from a total head of 50 meters), 283500 (from a total head of 70 meters), 297000 (from a total head of 10 meters), 303750 (from a total head of 70 meters), 315000 (from a total head of 30 meters), 315000 (from a total head of 70 meters), 330750 (from a total head of 20 meters), 330750 (from a total head of 50 meters), 337500 (from a total head of 70 meters), 342000 (from a total head of 30 meters), 371250 (from a total head of 20 meters), 378000 (from a total head of 50 meters), 393750 (from a total head of 30 meters), 441000 (from a total head of 20 meters), 425250 (from a total head of 50 meters), 465750 (from a total head of 50 meters), 472500 (from a total head of 30 meters), 472500 (from a total head of 50 meters), 475200 (from a total head of 10 meters), 495000 (from a total head of 20 meters), 517500 (from a total head of 50 meters), 528000 (from a total head of 10 meters), 551250 (from a total head of 20 meters), 551250 (from a total head of 30 meters), 630000 (from a total head of 30 meters), 661500 (from a total head of 20 meters ), 668250 (from a total head of 10 meters), 742500 (from a total head of 10 meters), 990000 (from a total head of 10 meters), 1113750 (from a total head of 10 meters), 1237500 (from a total head of 10 meters), 618750 (from a total head of 20 meters), 427500 (from a total head of 30 meters), 258750 (from a total head of 50 meters), 742500 (from a total head of 20 meters), 513000 (from a total head of 30 meters), 310500 (from a total head of 50 meters), 598500 (from a total head of 30 meters), 362250 (from a total head of 50 meters), 684000 (from a total head of 30 meters), 414000 (from a total head of 50 meters)

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found
Urgent

Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification

N/a

📍 AHMEDNAGAR, MAHARASHTRA

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Maharashtra Rural Development And Panchayat Raj Department Solar PV Water Pumping Systems Tender Bhandara 2025 MNRE Specification

N/a

📍 BHANDARA, MAHARASHTRA

⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM
Urgent

Rural Development Maharashtra Solar PV Water Pumping Systems Tender Pune 2025 MNRE Q3 ISI/ISO Standards

N/a

📍 PUNE, MAHARASHTRA

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Urgent

Satara District Panchayats Solar Photovoltaic Water Pumping Systems Tender Maharashtra MNRE Q3 2025

Satara District Panchayats

📍 SATARA, MAHARASHTRA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

General Administration Department Gadchiroli MNRE V2 Solar Photovoltaic Water Pumping Systems Tender 2025

General Administartion Department

📍 GADCHIROLI, MAHARASHTRA

EMD: ₹95,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM