Accleter Cable,Clutch Cable,Oil Filter,Spark Plug,Adapter,Brake Shoe Front,Brake Shoe Rear,Front Br
Indian Army
RAJAURI, JAMMU & KASHMIR
Bid Publish Date
23-Jun-2026, 1:37 pm
Bid End Date
03-Jul-2026, 2:00 pm
Location
Progress
Quantity
32
Category
SPARK PLUG
Bid Type
Single Packet Bid
The Indian Army, Department Of Military Affairs, seeks procurement of multiple vehicle components including CARBURATOR ASSY, TCI UNIT, ELEMENT OIL FILTER, SPARK PLUG, FRONT BRAKE CABLE, BRAKE SHOE ASSY FRT, BRAKE SHOE ASSY REAR, CONTROL LEVER, DRIVE ASY, GEAR LEVER KIT, and SOLENOID VALVE for delivery to the Kathua, Jammu & Kashmir location (PIN 184101). The 11-item scope covers critical spares for military vehicles; the BOQ lists 11 items with unspecified quantities, while the estimated value and EMD are not disclosed. The buyer reserves a 25% quantity variation up or down and a potential extension of delivery time proportional to quantity changes, with a minimum 30 days. The option clause ensures flexibility to meet operational demand during contract execution.
Product/service names: CARBURATOR ASSY, TCI UNIT, ELEMENT OIL FILTER, SPARK PLUG, FRONT BRAKE CABLE, BRAKE SHOE ASSY FRT, BRAKE SHOE ASSY REAR, CONTROL LEVER, DRIVE ASSY, GEAR LEVER KIT, SOLENOID VALVE
Quantities: 11 items with N/A quantities in BOQ; no estimated value disclosed
Delivery: minimum 30 days, extension based on (Increased quantity ÷ Original quantity) × Original delivery period
EMD/Value: Not disclosed in the notice
Experience/Eligibility: Not specified; typical military procurement requires compliance with standard government contracts
Standards/Certifications: Not specified in tender data
Option Clause: ±25% quantity and extended delivery time with minimum 30 days
Delivery time adjustments based on quantity changes during contract
No specified EMD, value, or explicit technical standards in the notice
Not specified in buyer terms; bidders should confirm payment milestones with the buyer during bid submission
Delivery period starts from last date of original delivery order; time extension governed by the option clause formula
Not specified in the terms; bidders should verify any LD or penalty provisions in the final contract
Eligibility criteria not explicitly stated; assume standard military procurement requirements apply
Must comply with 25% quantity variation clause and delivery timing adjustments
Provide typical bid documents: GST, PAN, experience certificates, financial statements, EMD, OEM authorizations
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
CARBURATOR ASSY , TCI UNIT , ELEMENT OIL FILTER , SPARK PLUG , FRONT BRAKE CABLE , BRAKE SHOE ASSY FRT , BRAKE SHOE ASSY REAR , CONTROL LEVER , DRIVE ASSY , GEAR LEVER KIT , SOLENOID VALVE
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
RAJAURI, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Indian Army
TINSUKIA, ASSAM
Tender Results
Loading results...
CARBURATOR ASSY
CARBURATOR ASSY
TCI UNIT
TCI UNIT
ELEMENT OIL FILTER
ELEMENT OIL FILTER
SPARK PLUG
SPARK PLUG
FRONT BRAKE CABLE
FRONT BRAKE CABLE
BRAKE SHOE ASSY FRT
BRAKE SHOE ASSY FRT
BRAKE SHOE ASSY REAR
BRAKE SHOE ASSY REAR
CONTROL LEVER
CONTROL LEVER
DRIVE ASSY
DRIVE ASSY
GEAR LEVER KIT
GEAR LEVER KIT
SOLENOID VALVE
SOLENOID VALVE
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | CARBURATOR ASSY | CARBURATOR ASSY | 2 | pieces | [email protected] | 15 | |
| 2 | TCI UNIT | TCI UNIT | 2 | pieces | [email protected] | 15 | |
| 3 | ELEMENT OIL FILTER | ELEMENT OIL FILTER | 3 | pieces | [email protected] | 15 | |
| 4 | SPARK PLUG | SPARK PLUG | 6 | pieces | [email protected] | 15 | |
| 5 | FRONT BRAKE CABLE | FRONT BRAKE CABLE | 2 | pieces | [email protected] | 15 | |
| 6 | BRAKE SHOE ASSY FRT | BRAKE SHOE ASSY FRT | 1 | pieces | [email protected] | 15 | |
| 7 | BRAKE SHOE ASSY REAR | BRAKE SHOE ASSY REAR | 2 | pieces | [email protected] | 15 | |
| 8 | CONTROL LEVER | CONTROL LEVER | 1 | pieces | [email protected] | 15 | |
| 9 | DRIVE ASSY | DRIVE ASSY | 4 | pieces | [email protected] | 15 | |
| 10 | GEAR LEVER KIT | GEAR LEVER KIT | 5 | pieces | [email protected] | 15 | |
| 11 | SOLENOID VALVE | SOLENOID VALVE | 4 | pieces | [email protected] | 15 |
Discover companies most likely to bid on this tender
Key insights about JAMMU AND KASHMIR tender market
Bidders should review the 25% quantity option, delivery extension rules, and item scope (CARBURATOR ASSY to SOLENOID VALVE). Prepare bid documents including GST, PAN, experience certificates, OEM authorizations, and EMD if required. Seek clarification on quantities since BOQ shows N/A values.
Common submissions include GST registration certificate, PAN, financial statements, experience certificates for similar supply, technical bid documents, OEM authorization letters, and EMD/Security deposit. Confirm exact list with the issuing authority before final submission.
Delivery starts after the original delivery order date; quantity variations up to 25% may extend the delivery period using the specified formula, with a minimum 30-day extension. Ensure internal planning aligns with possible schedule shifts.
Ensure your bid includes scalable production capacity to handle ±25% quantity changes. Include production lead times and buffer stock, plus a clear delivery plan that maps to the extended timeline calculations for varying orders.
The notice does not disclose an EMD amount. Bidders should obtain the exact EMD value from the tender documents or contact the procurement authority directly to avoid bid rejection due to missing security deposits.
The scope includes CARBURATOR ASSY, TCI UNIT, ELEMENT OIL FILTER, SPARK PLUG, FRONT BRAKE CABLE, BRAKE SHOE ASSY FRT/REAR, CONTROL LEVER, DRIVE ASSY, GEAR LEVER KIT, and SOLENOID VALVE, across 11 items with unspecified quantities.
The tender specifies a minimum extension rule of 30 days; actual delivery deadlines depend on the last date of original delivery order and subsequent quantity adjustments under the option clause. Confirm with the issuing authority for the final delivery schedule.
The notice does not list specific standards; bidders should verify required certifications (e.g., ISI, OEM approvals) during final bid submission and ensure product compatibility with military-grade specifications before sourcing components.
Indian Army
📍 UDHAMPUR, JAMMU & KASHMIR
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 DEHRADUN, UTTARAKHAND
Indian Army
📍 BARAMULLA, JAMMU & KASHMIR
Indian Army
📍 AHMEDABAD, GUJARAT
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS