Indian Army Propeller Assembly Tender for CCW/CW 2026 โ Military Aircraft Components Procurement
Indian Army
KUPWARA, JAMMU & KASHMIR
Bid Publish Date
20-Jun-2026, 7:09 pm
Bid End Date
01-Jul-2026, 9:00 am
Location
Progress
Quantity
4
Category
PropellerAssy CCW
Bid Type
Two Packet Bid
Indian Army, Department Of Military Affairs, invites bids for procurement of PropellerAssy CCW / cw in Kupwara, Jammu & Kashmir (193221). The BOQ shows no items currently. Key tender mechanics include an option clause allowing up to 25% quantity variation at contracted rates, with delivery timing tied to the last date of the original order. This opportunity requires bidders to align with military-grade supply conditions and to prepare for sample-based approval prior to bulk manufacturing. The tender emphasizes disciplined vendor-code creation and sample-based release procedures to ensure conformity with contract expectations. Bidders should plan for potential scope adjustments and adhere to supplier documentation requirements.
Product category: PropellerAssy CCW / cw
Pre-production samples: 3 required within 5 days of award
Modification window: 5 days after sample submission
Delivery period adjustment: linked to original delivery period with a minimum of 30 days
No published BOQ items; scope governed by future specifications and approvals
Vendor-code readiness: PAN, GSTIN, EFT Mandate, Cancelled Cheque
25% quantity variation right during contracting and currency
Mandatory advance sample process with 3 samples in 5 days
Delivery period adjustments and LD defaults tied to buyer approval timing
Not specified in tender data; terms will align with standard government procurement and contract award.
Delivery commencement from last date of original delivery order; extension time calculated as (increased quantity รท original quantity) ร original delivery period with minimum 30 days; extended delivery may be granted during option exercise.
No explicit LD details provided; in sample delays, no LD is charged if buyer delays approval; otherwise terms will be set in contract.
Must possess PAN and GSTIN; demonstrate ability to supply advance samples within 5 days
Must provide EFT Mandate with bank certification and cancelled cheque
Commit to 25% quantity variation as per option clause and to comply with sample-based approvals
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PropellerAssy CCW , PropellerAssy cw
End-to-end support โ bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation ยท 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
Certified EFT Mandate from bank
Advance sample submission documentation
Evidence of ability to supply samples within 5 days of award
Documentation confirming vendor-code creation readiness
Key insights about JAMMU AND KASHMIR tender market
To bid for the Indian Army propeller assembly tender in Kupwara, ensure you meet vendor-code requirements (PAN, GSTIN, EFT Mandate, cancelled cheque), prepare 3 advance samples within 5 days of award, and anticipate modifications within 5 days. Understand the 25% quantity variation clause and prepare delivery plans accordingly.
Submit a copy of PAN, GSTIN, a cancelled cheque, and an EFT mandate certified by your bank. These documents enable supplier registration and eligibility for the contract. Ensure all documents are legible and up to date before bid submission.
After award, you must supply 3 samples within 5 days. The buyer will approve or request modifications within 5 days. If approval delays occur, the delivery period is reset without liquidated damages. Major deviations can lead to contract termination.
If the buyer delays, the delivery period is reset with no LD for the delay. The extended period is calculated while maintaining the original delivery cadence, ensuring suppliers are not penalized for administrative delays in approvals.
No BOQ items are currently listed. The procurement scope depends on future specifications and the outcome of the advance-sample approval process, so bidders should be prepared for undefined itemization once approvals are completed.
The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during the currency of the contract at contracted rates. Delivery timing follows a calculated extension, with a minimum of 30 days, as specified in the terms.
Eligibility includes valid PAN and GSTIN, bank-certified EFT Mandate, cancelled cheque, and readiness to submit advance samples within 5 days of award. Suppliers must comply with the option-quantity clause and adhere to sample-based approval timelines.
Extension is calculated as (Increased quantity รท Original quantity) ร Original delivery period, with a minimum of 30 days. If the original period is shorter than 30 days, the extension equals the original period; the buyer may extend within contract limits.
Indian Army
๐ KUPWARA, JAMMU & KASHMIR
Indian Army
๐ KARGIL, JAMMU & KASHMIR
Indian Army
๐ DEHRADUN, UTTARAKHAND
Indian Army
๐ BHARATPUR, RAJASTHAN
Rourkela Steel Plant
๐ SUNDERGARH, ODISHA
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS