Indian Army Drive Assembly & Automotive Components Tender 2026 – 12 Item Scope & Bulk Supply, Department of Military Affairs
Indian Army
Sri Ganganagar, RAJASTHAN
Progress
Quantity
17
The Indian Army (Department Of Military Affairs) based in UDAIPUR, RAJASTHAN 307025, invites bids for a broad category of mechanical and vehicle-related components including COMBINATION SWITCH RH, FUSE BOX LOCK, ENGINE PACKING KIT, SILENCER GASKET, SPEEDOMETER GEAR, FUEL COCK, TRANSFER CASE MTG BRACKET, OIL SEAL, TRANSFER CASE OIL SEAL, SPEEDOMETER HEAD, STARTER MOTOR ASSY 24V, and HYD RAM ASSY. The BOQ lists 13 total items, with no explicit quantities or values published. This procurement targets military supply readiness in the Udaipur region, with emphasis on standardization across listed components. A key differentiator is the inclusion of an option clause affecting quantity adjustments during contract execution, enabling up to ±25% variation at contracted rates.
Option to increase/decrease quantity up to 25% at contracted rates
Delivery schedule adjusts based on quantity changes with a 30-day minimum
BOQ contains 13 items but exact quantities/units are not provided
Not specified in data; bidders should seek clarification on payment milestones and any advance or milestone-based payments
Delivery starts from the last date of the original delivery order; extended periods calculated via (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified; bidders should confirm LD provisions during clarification
Ability to supply automotive/mechanical components consistent with listed items
Compliance with option-clauses for quantity variation
Demonstrated delivery capability within extended timelines following contract adjustments
Tender Category
Goods
Bid To RA
No
Item Category
COMBINATION SWITCH RH , FUSE BOX LOCK , ENGINE PACKING KIT , SILENCER GASKET , SPEEDOMETER GEAR , FUEL COCK , TRANSFER CASE MTG BRACKET , OIL SEAL , TRANSFER CASE OIL SEAL , SPEEDOMETER HEAD , STARTER MOTOR ASSY , STARTER MOTOR ASSY 24V , HYD RAM ASSY
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Sri Ganganagar, RAJASTHAN
Indian Army
POONCH, JAMMU & KASHMIR
Indian Army
SURENDRA NAGAR, GUJARAT
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
COMBINATION SWITCH RH
COMBINATION SWITCH RH
FUSE BOX LOCK
FUSE BOX LOCK
ENGINE PACKING KIT
ENGINE PACKING KIT
SILENCER GASKET
SILENCER GASKET
SPEEDOMETER GEAR
SPEEDOMETER GEAR
FUEL COCK
FUEL COCK
TRANSFER CASE MTG BRACKET
TRANSFER CASE MTG BRACKET
OIL SEAL
OIL SEAL
TRANSFER CASE OIL SEAL
TRANSFER CASE OIL SEAL
SPEEDOMETER HEAD
SPEEDOMETER HEAD
STARTER MOTOR ASSY
STARTER MOTOR ASSY
STARTER MOTOR ASSY 24V
STARTER MOTOR ASSY 24V
HYD RAM ASSY
HYD RAM ASSY
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | COMBINATION SWITCH RH | COMBINATION SWITCH RH | 1 | pieces | 242fwc_udp | 15 | |
| 2 | FUSE BOX LOCK | FUSE BOX LOCK | 2 | pieces | 242fwc_udp | 15 | |
| 3 | ENGINE PACKING KIT | ENGINE PACKING KIT | 1 | pieces | 242fwc_udp | 15 | |
| 4 | SILENCER GASKET | SILENCER GASKET | 1 | pieces | 242fwc_udp | 15 | |
| 5 | SPEEDOMETER GEAR | SPEEDOMETER GEAR | 1 | pieces | 242fwc_udp | 15 | |
| 6 | FUEL COCK | FUEL COCK | 1 | pieces | 242fwc_udp | 15 | |
| 7 | TRANSFER CASE MTG BRACKET | TRANSFER CASE MTG BRACKET | 2 | pieces | 242fwc_udp | 15 | |
| 8 | OIL SEAL | OIL SEAL | 2 | pieces | 242fwc_udp | 15 | |
| 9 | TRANSFER CASE OIL SEAL | TRANSFER CASE OIL SEAL | 1 | pieces | 242fwc_udp | 15 | |
| 10 | SPEEDOMETER HEAD | SPEEDOMETER HEAD | 2 | pieces | 242fwc_udp | 15 | |
| 11 | STARTER MOTOR ASSY | STARTER MOTOR ASSY | 1 | pieces | 242fwc_udp | 15 | |
| 12 | STARTER MOTOR ASSY 24V | STARTER MOTOR ASSY 24V | 1 | pieces | 242fwc_udp | 15 | |
| 13 | HYD RAM ASSY | HYD RAM ASSY | 1 | pieces | 242fwc_udp | 15 |
GST certificate
PAN card
Experience certificates (relevant to automotive/mechanical components)
Financial statements (as required by bidding authority)
EMD/Security deposit documents (if applicable per tender specifics)
Technical bid documents demonstrating capability for 13 listed items
OEM authorizations (if required for specific items in the BOQ)
Any mandatory compliance certificates (if specified in tender terms)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | GANESH ENTERPRISES Under PMA | - | 12-01-2026 20:32:24 | |
| 2 | KAVI AUTOMOBILES AND ENGINEERING Under PMA | - | 10-01-2026 20:38:08 | |
| 3 | LAXMI TRADERS Under PMA | - | 11-01-2026 12:18:01 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | LAXMI TRADERS(MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : COMBINATION SWITCH RH,FUSE BOX LOCK,ENGINE PACKING KIT,SILENCER GASKET,SPEEDOMETER GEAR,FUEL COCK,T | |
| L2 | KAVI AUTOMOBILES AND ENGINEERING (MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : COMBINATION SWITCH RH,FUSE BOX LOCK,ENGINE PACKING KIT,SILENCER GASKET,SPEEDOMETER GEAR,FUEL COCK,T | |
| L3 | GANESH ENTERPRISES (MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : COMBINATION SWITCH RH,FUSE BOX LOCK,ENGINE PACKING KIT,SILENCER GASKET,SPEEDOMETER GEAR,FUEL COCK,T |
Key insights about RAJASTHAN tender market
To bid in the Udaipur tender, bidders must submit standard bidder documents (GST, PAN, experience certificates, financials) and demonstrate capability for 13 listed items. Respond to the option clause allowing ±25% quantity changes and outline the delivery plan with minimum 30 days added time where applicable. Ensure OEM authorizations where required.
Bidders should provide GST certificate, PAN card, experience certificates for automotive spares, financial statements, EMD documents if applicable, technical bid, and OEM authorizations for items requiring brand-specific compliance. Verify space for the 13-item BOQ and prepare item-wise technical compliance notes.
Delivery begins after the last date of the original delivery order, with extended time calculated via the stated formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Plan for potential ±25% quantity adjustments during contract execution.
Eligibility requires capability to supply multiple mechanical components and compliance with the option-based quantity variation. Provide prior experience in similar vehicle spares, financial stability docs, and, where required, OEM authorizations. Detailed item-wise capability for 13 listed components is advantageous.
Quantity fluctuations up to 25% will still be at contracted rates. Delivery timelines extend according to the formula tied to the quantity change, with a mandatory minimum 30 days. Prepare a flexible logistics plan to absorb variations without price disruption.
The tender data does not specify standards. Bidders should obtain clarification on any required certifications (IS/IS0/OEM) and ensure technical documents demonstrate conformity for the 13 components, especially for critical items like STARTER MOTOR ASSY 24V and TRANSFER CASE OIL SEAL.
The BOQ lists 13 items but provides no explicit quantities or units. Bidders should request item-wise quantity information during bid clarification and prepare quantity-neutral proposals with clear unit pricing and scalable supply plans.
Bid submission dates are not provided in the data. Interested bidders must monitor official tender portals and request dates during clarification. Prepare comprehensive documentation, including technical compliance for all 13 components and financial bids aligned to potential quantity changes.
Indian Army
📍 JAIPUR, RAJASTHAN
Controller General Of Defence Accounts
📍 EAST SIANG, ARUNACHAL PRADESH
Indian Army
📍 AMRITSAR, PUNJAB
Indian Army
📍 KOTA, RAJASTHAN
Indian Army
📍 GURDASPUR, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS