Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8,Title9,Title10
Western Railway
RAJKOT, GUJARAT
Bid Publish Date
07-May-2026, 11:47 am
Bid End Date
18-May-2026, 12:00 pm
Location
Progress
RAQuantity
858
Category
Title1
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs) conducting a procurement tender in Shimla, Himachal Pradesh. The contract involves multiple item categories under a single security equipment procurement, with a total estimated scope highlighted by a generic BOQ of 10 items. The tender requires standard compliance documentation (GST, PAN) and an enlistment letter from HQ CE Chandigarh Zone. A key differentiator is the option clause allowing a 25% quantity increase or decrease at contracted rates, with provision for extended delivery time based on the adjusted quantity. This creates a dynamic order scope and emphasizes compliance, timely delivery, and robust documentation.
Products/Services: Security equipment procurement (ten BoQ items with unspecified quantities)
EMD/Value: Not disclosed in the tender data
Standards/Certifications: Not specified in the tender text; bidders should comply with standard government procurement requirements
Delivery: Delivery period linked to original delivery order; extended delivery period rules apply
Experience: Not explicitly stated; ATC requires enlistment letter and BOQ compliance
25% quantity variation permitted at contract time and during currency with contracted rates
Delivery period extension calculated by (increased quantity/original quantity) × original delivery period; minimum 30 days
Enlistment letter from HQ CE Chandigarh Zone required; GST and PAN documentation mandatory
Not specified in tender data; bidders should anticipate standard government terms (to be clarified during bid process)
Delivery period commences from the last date of original delivery order; extended time applies per option clause with minimum 30 days
Not specified in the data; expected to be defined in detailed terms during bid evaluation
GST registration
PAN card of the firm
HQ CE Chandigarh Zone enlistment letter
BOQ compliance confirmation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Western Railway
RAJKOT, GUJARAT
Heavy Engineering Corporation Limited (hec)
RANCHI, JHARKHAND
Irel (india) Limited
ERNAKULAM, KERALA
Oil India Limited
DIBRUGARH, ASSAM
Indian Army
Tender Results
Loading results...
Title1
Disconnecting HT and LT supply taking down the defective transformer Indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 KVA
Title2
Shifting back the repaired transformer Indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making HT LT side connections and testing for satisfactorily working complete all as directed for transformer of Capacity 400 KVA
Title3
Draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with HT LT side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of Cap 400 KVA
Title4
M and L for rewinding of burnt out defective HT copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed
Title5
All as per item No 4 above but LT copper coils complete all as specified and directed
Title6
M and L for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 KVA
Title7
M and L for replacement of defective HT porcelain bushing of suitable size for transformer of cap 400 KVA including washers of good quality complete all as specified and directed
Title8
M and L for replacement of defective LT porcelain bushing of suitable size for transformer of cap 400 KVA including washers of good quality complete all as specified and directed
Title9
Dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 KV at 2 Point 5 mm electrode gap complete all as directed Note Unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account
Title10
S and F new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | Disconnecting HT and LT supply taking down the defective transformer Indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 KVA | 1 | each job | gejutoghbso | 30 | |
| 2 | Title2 | Shifting back the repaired transformer Indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making HT LT side connections and testing for satisfactorily working complete all as directed for transformer of Capacity 400 KVA | 1 | each job | gejutoghbso | 30 | |
| 3 | Title3 | Draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with HT LT side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of Cap 400 KVA | 1 | each job | gejutoghbso | 30 | |
| 4 | Title4 | M and L for rewinding of burnt out defective HT copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed | 150 | kg | gejutoghbso | 30 | |
| 5 | Title5 | All as per item No 4 above but LT copper coils complete all as specified and directed | 100 | kg | gejutoghbso | 30 | |
| 6 | Title6 | M and L for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 KVA | 1 | each job | gejutoghbso | 30 | |
| 7 | Title7 | M and L for replacement of defective HT porcelain bushing of suitable size for transformer of cap 400 KVA including washers of good quality complete all as specified and directed | 2 | each job | gejutoghbso | 30 | |
| 8 | Title8 | M and L for replacement of defective LT porcelain bushing of suitable size for transformer of cap 400 KVA including washers of good quality complete all as specified and directed | 2 | each job | gejutoghbso | 30 | |
| 9 | Title9 | Dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 KV at 2 Point 5 mm electrode gap complete all as directed Note Unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account | 480 | ltr | gejutoghbso | 30 | |
| 10 | Title10 | S and F new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed | 120 | ltr | gejutoghbso | 30 |
GST Registration certificate
Permanent Account Number (PAN) card of the firm
Enlistment letter of HQ CE Chandigarh Zone
Compliance of BOQ (BoQ compliance document)
Any technical bid documents demonstrating capability or past performance (if requested)
Start
10-Jun-2026, 1:00 pm
End
11-Jun-2026, 1:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | NETLINK SYSTEM SOLUTIONS(MSE) Under PMA Winner | ₹2,42,430 | Item Categories : Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8,Title9,Title10 |
| L2 | MEHTA TRADERS (MSE) Under PMA | ₹2,65,360 | Item Categories : Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8,Title9,Title10 |
🎉 L1 Winner
NETLINK SYSTEM SOLUTIONS(MSE) Under PMA
Final Price: ₹2,42,430
Key insights about HIMACHAL PRADESH tender market
Bidders must submit GST registration, PAN, HQ CE Chandigarh Zone enlistment letter, and BOQ compliance. Prepare technical bids detailing capability for security equipment with adherence to government procurement norms. Ensure delivery plan aligns with original order timelines and the 25% quantity option terms.
Required documents include GST registration certificate, PAN card, enlistment letter from HQ CE Chandigarh Zone, and BOQ compliance documentation. Vendors should provide financials if requested and any OEM authorizations or past performance proofs as per ATC specifics.
Delivery time follows the option clause: additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Delivery starts after the last date of the original delivery order, and the purchaser may extend within contracted rates.
An enlistment letter of HQ CE Chandigarh Zone is mandatory. This confirms eligibility for the security equipment procurement by Indian Army and aligns with ATC compliance requirements for bidders.
BOQ comprises 10 items with no specified quantities in the data. Bidders must ensure full compliance with the BOQ and provide required documentation, demonstrating capability to fulfill ten-item scope as per tender terms.
Bidders must provide GST registration certificate and the firm’s PAN card as part of mandatory documentation. These are required to participate in the government procurement and to ensure tax compliance during payment processing.
The tender text does not specify explicit standards like ISI or ISO. However, bidders should anticipate compliance with general government procurement standards and the BoQ compliance. Prepare any relevant certifications you hold and be ready to demonstrate security equipment capabilities.
Compliance of BOQ means bidders must align their technical and commercial proposals to the items, quantities, and delivery terms specified in the BoQ. Since exact item details are not provided, bidders should demonstrate approach and capability to meet the BoQ requirements in a compliant bid.
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Council Of Agricultural Research (icar)
📍 KARNAL, HARYANA
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 ALIGARH, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 ALIGARH, UTTAR PRADESH
Western Railway
📍 RATLAM, MADHYA PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS