Indian Army Engine Spare Parts Tender Meghalaya 2025 Piston Assembly & Related Components
Indian Army
RI BHOI, MEGHALAYA
Bid Publish Date
10-Jan-2026, 11:16 am
Bid End Date
20-Jan-2026, 12:00 pm
Location
Progress
Quantity
19
Category
Injector Nozzle
Bid Type
Two Packet Bid
Organization: Indian Army (Department of Military Affairs) sourcing injector nozzle, roller, roller pin, supply pump, cam plate, hydraulic head, and solenoid valve components in Darjeeling, West Bengal 734001. Seven BIQ items listed with no explicit quantities; estimated value and EMD not disclosed. The BOQ denotes 7 items with N/A quantities. The contract includes an option to adjust quantity by up to 25% at contracted rates and delivery timing governed by the original order plus extended period rules. A mandatory emphasis is the ISO 9001 requirement for bidder or OEM. Unique aspect: Army procurement with a flexible quantity clause and strict certification condition.
Injector nozzle, roller, roller pin, supply pump, cam plate, hydraulic head, solenoid valve
ISO 9001 certified bidder or OEM
Quantity adjustment up to 25% of bid quantity
Delivery timeline anchored to last date of original delivery order with 30-day minimum
BOQ contains 7 items; no explicit unit quantities provided
Upload all required certificates; comply with bid document and corrigenda
Delivery extension and quantity adjustment rules (up to 25%)
Mandatory ISO 9001 certification for bidder or OEM
Submit all certificates and documents as per bid terms
Not specified in data; refer to bid document for EMD amount and payment schedule
Delivery period starts from last date of original delivery order; extended time follows option clause with minimum 30 days
Not specified in data; check T&C for LD provisions and performance penalties
Must hold ISO 9001 certification (bidder or OEM)
Ability to supply injector nozzle and hydraulic components in relevant category
Compliance with 25% quantity adjustment and delivery extension rules
Indian Army
RI BHOI, MEGHALAYA
Indian Army
KARGIL, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
HYDERABAD, TELANGANA
Indian Army
BARDHAMAN, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Injector Nozzle | Injector Nozzle | 6 | pieces | smbehera | 15 |
| 2 | Roller | Roller | 4 | pieces | smbehera | 15 |
| 3 | Roller Pin | Roller Pin | 4 | pieces | smbehera | 15 |
| 4 | Supply Pump | Supply Pump | 1 | pieces | smbehera | 15 |
| 5 | Cam Plate | Cam Plate | 1 | pieces | smbehera | 15 |
| 6 | Hydraulic head | Hydraulic head | 1 | pieces | smbehera | 15 |
| 7 | Solenoid Valve | Solenoid Valve | 2 | pieces | smbehera | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates showing relevant supply of hydraulic components
Financial statements (audited if possible)
EMD/Security deposit documentation (as per bid document)
Technical bid documents demonstrating ISO 9001 certification
OEM authorizations (if bidding as OEM or on behalf of OEM)
Any other certificates requested in ATC/Corrigendum
Key insights about WEST BENGAL tender market
Bidders must submit GST registration, PAN, experience certificates in hydraulic components, audited financial statements, EMD documentation, ISO 9001 certification proof, OEM authorizations, and any bid-specific certificates noted in the ATC/Corrigendum. Ensure upload before bid submission and verify all items against the bid document.
The purchaser may increase or decrease the bid quantity by up to 25% at contracted rates. Delivery time scales from the last date of the original delivery order, with additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Bidders or OEMs must hold ISO 9001 certification. Compliance with ATC and Corrigendum is mandatory; non-submission results in rejection. The standard ensures quality management across manufacturing and supply processes for injector nozzle and hydraulic components.
Delivery location is Darjeeling, West Bengal 734001. The delivery timeline depends on the last original delivery order date; extended delivery requires applying the option clause with a minimum 30 days, ensuring timely supply to the Indian Army unit.
Payment terms are defined in the bid document; the data here does not specify the exact schedule. Bidders should review the Terms and Conditions for EMD submission, certification requirements, and the final payment arrangement linked to delivery milestones.
The BOQ lists 7 items in categories including injector nozzle, roller, roller pin, supply pump, cam plate, hydraulic head, and solenoid valve. Quantities are not disclosed in the available data, so bidders must await the detailed tender document for unit-wise specifications.
Failure to upload required certificates as per the Bid Document/ATC/Corrigendum can lead to disqualification. Ensure ISO 9001 proof, OEM authorizations, and all other mandatory certificates are uploaded in the bid submission portal before the deadline.
Exact EMD amount and submission deadlines are specified in the Bid Document/ATC. Since the provided data omits these figures, bidders must consult the official tender documents and the buyer’s addenda to confirm the exact value and last submission date.
Indo Tibetan Border Police (itbp)
📍 LEH, JAMMU & KASHMIR
Western Coalfields Limited
📍 CHANDRAPUR, MAHARASHTRA
Hindustan Petroleum Corporation Ltd
📍 GONDA, UTTAR PRADESH
Indian Army
📍 KUPWARA, JAMMU & KASHMIR
Indian Army
📍 BIKANER, RAJASTHAN
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS