The estimated project cost is approximately 45,00,000 INR. The financial bid should include a detailed breakdown of costs, including materials, labor, testing, and overheads. Payment terms are linked to project milestones, with payments released upon successful completion of each phase. The bid submission must include a valid EMD of the specified amount, and the bid offer must be valid for 180 days from the submission deadline.
| Cost Component |
Amount (INR) |
| Material Cost |
To be quoted |
| Labour Cost |
To be quoted |
| Testing & Commissioning |
To be quoted |
| Overheads |
To be quoted |
Payment Schedule:
- 10% advance on contract signing.
- 40% after completion of cable laying.
- 30% after successful testing.
- 20% upon project completion and handover.
All financial transactions must adhere to the terms specified in the tender documents, ensuring transparency and compliance.