Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; HA1001 Lift
Indian Coast Guard
SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 20 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; HA1001 Lift up the Craft on cradle Craft pulled upon slipway for carrying out under water work package and making sure that bearing surfaces are adequately cushio.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; HA1002 Immediately after docking clean the marine growth with wooden scraper Carry out cleaning with emery paper and fresh water hydro jet washing of complete und.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; HA1003 i Carry out Surface preparation and painting of entire under water hull including all appendages Remove clean and paint all under water gratings Examine pl.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; HB1014 02 in Nos Boat cradle corroded deteriorated at Various places Same to be replaced as per sample Scope of jobs are as follows a Cradle to be painted with na.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; EA3002 Following jobs to be carried out in steering system MatSpares yard supply a Renew all flexible hoses b Renew glands 02 in Nos of Rudders c Renew flexible .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; EA3012 The following under water valves to be overhaul and pressure tested up to 5 Kg a ME Sea chest valves 02 Nos SDNR 80 MM b ME sea chest interconnecting valve.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; EB3014During SME Vibration analysis test carried out by Ms Roshni ship repairers Port Blair It was observed that SME vibration was excessive The SME vibration ana.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC546; EB3015 Following machineriesEquipment to be carried out during pre refit and post refit Vibration measurement are to be taken on the equipment bearing points in t..
Deadline
29 Mar 2025