• Installation, erection, and maintenance of HT (High Tension) and LT (Low Tension) electrical lines in designated areas.
• Construction and commissioning of Transformer Centres at specified locations, including Garudeshwar SDN.
• Routine inspection and preventive maintenance of existing electrical infrastructure.
• Replacement of damaged components such as transformers, insulators, and conductors.
• Ensure compliance with safety standards and technical specifications as per tender documents.
• The process involves:
- Site assessment and preparation.
- Procurement of materials as per specifications.
- Erection of electrical lines and transformer centers.
- Testing and commissioning.
- Regular maintenance and troubleshooting.
| Specification |
Details |
| Estimated Cost |
Rs. 25,00,000 |
| Completion Period |
24 months |
| Location |
Rajpipla Division, Gujarat |
| Project Scope |
Electrical line erection, transformer installation, maintenance |
| Technical Standards |
As per Gujarat State Electricity Board norms |
• Bidders must submit detailed technical proposals, including methodology, safety measures, and timeline, along with financial bids.
• All work must adhere to the specifications outlined in the tender documents and schedules provided.