• Supply of 11KV underground XLPE cables, cable end termination kits, straight joint kits, and HDPE green pipes as specified by DGVCL.
• Laying of underground cables in designated routes, ensuring compliance with safety and technical standards.
• Testing of installed cables for insulation resistance, continuity, and overall performance.
• Commissioning of the cable system, including final connection and operational checks.
• Erection of HT-LT lines and T/C as per project specifications.
• Coordination with DGVCL and adherence to approved drawings and technical guidelines.
• Post-installation inspection and documentation.
• The contractor must supply all necessary tools, equipment, and manpower for execution.
| Item |
Specification |
| Cable Type |
11KV XLPE Underground Cable |
| Supply By |
DGVCL |
| Additional Materials |
Cable end termination kits, straight joint kits, HDPE green pipes |
| Completion Period |
12 months |
- Receive the approved project drawings and specifications.
- Procure the required materials as per tender specifications.
- Prepare the site and conduct initial surveys.
- Lay the underground cables following safety protocols.
- Conduct testing and quality checks.
- Complete the installation with cable terminations and joints.
- Erect HT-LT lines and T/C.
- Final inspection, testing, and commissioning.
- Submit all documentation and obtain approval from the designated authority.