The technical specifications include adherence to the General Specification and Building Work Booklet provided in the linked documents. The work involves structural repairs, electrical and plumbing upgrades, painting, waterproofing, and miscellaneous civil works. Contractors must follow the sequential process: site assessment, detailed planning, procurement, execution, and quality inspection. The technical parameters include:
| Parameter |
Specification |
| Structural Repairs |
As per detailed drawings |
| Electrical Works |
Upgraded wiring, fixtures |
| Plumbing |
Pipe replacements, fixtures |
| Painting |
Exterior and interior as per standards |
| Waterproofing |
As per approved methods |
All works should comply with the technical standards outlined in the tender documents, ensuring safety, durability, and quality of finish. Contractors must also ensure timely completion within the 3-month period.