• Erection & Maintenance of HT (High Tension) and LT (Low Tension) electrical lines and transformer centers in Sagbara SDN and other SDNs as required.
• Installation, testing, and commissioning of electrical infrastructure including transformers, poles, conductors, and related accessories.
• Routine and preventive maintenance to ensure uninterrupted power supply and safety compliance.
• Adherence to technical specifications outlined in the tender documents, including Schedule A and Schedule B.
• Coordination with the Rajpipla Division Office for site inspections, approvals, and progress reporting.
• Completion of work within the stipulated period of 24 months, with adherence to quality standards.
| Key Deliverables |
Details |
| Erection of HT/LT Lines |
As per Schedule A specifications |
| Transformer Installation |
As per Schedule B specifications |
| Maintenance Schedule |
Regular inspections and repairs |
| Documentation & Reports |
Submission of progress reports and compliance certificates |
• The contractor must provide all necessary equipment, skilled manpower, and safety measures for the successful completion of the project.