• Design and planning of the complete sewerage network including detailed technical drawings.
• Supply of materials such as pipes, joints, pumps, and electro-mechanical components as per specifications.
• Lowering and laying of sewer pipes, ensuring proper alignment and jointing.
• Installation of Pumping Station including all electro-mechanical equipment.
• House connection work for connecting individual households to the sewer network.
• Operation and Maintenance (O&M) of the entire sewer system for a period of 2 years post-completion.
• Quality assurance and compliance with all relevant standards and specifications.
| Item |
Description |
Specification |
| Pipes |
Sewer pipes |
HDPE/RC pipes as per project specs |
| Pumping Station |
Pump and electro-mechanical units |
Capacity as per design |
| House Connections |
Connecting individual households |
Standard approved fittings |
- Conduct site survey and finalize design.
- Procure materials and equipment.
- Install sewer pipes and joints.
- Set up pumping station.
- Connect households.
- Test the entire system.
- Provide operation & maintenance for 2 years.
Important Requirements: All work must adhere to the technical specifications detailed in the tender documents, and safety standards must be strictly followed during construction and installation.