• Procurement of all materials including conductors, hardware, insulators, and accessories as per specifications.
• Complete design, engineering, and planning for the installation of 66KV transmission lines.
• Erection of double and multi-circuit towers, including foundation works, tower assembly, and stringing of conductors.
• Testing and commissioning of the entire transmission line infrastructure.
• Compliance with all safety, environmental, and technical standards.
- Material Procurement: Acquire all specified hardware, conductors, and accessories.
- Site Preparation: Clear and prepare sites for tower foundations.
- Tower Erection: Assemble and erect towers as per approved designs.
- Stringing Conductors: Install conductors and ensure proper tensioning.
- Testing & Commissioning: Conduct electrical and safety tests before energization.
| Item |
Specification |
Quantity |
| Conductors |
ACSR Moose Zebra Panther |
As per schedule |
| Hardware |
Tension and suspension hardware |
As per design |
| Towers |
Steel lattice towers |
As per line length |
| Accessories |
Insulators, clamps, rods |
As specified |
• The work must be completed within 12 months from the date of award.
• All activities must adhere to applicable safety and environmental regulations.