• Construction of control room extension (2 spans) to increase operational capacity.
• Renovation and maintenance of existing control room including structural repairs and upgrades.
• Miscellaneous civil works such as flooring, wall finishing, and roofing as per specifications.
• Electrification works, including wiring, electrical panel installation, and lighting.
• The project must adhere to the technical standards specified by GETCO.
• All civil and electrical works should be completed within 3 months from the date of work order.
• Bidders are required to submit detailed work plans, safety protocols, and quality assurance plans.
• The scope includes procurement, installation, testing, and commissioning of all civil and electrical components.
| Specification |
Details |
| Civil Works |
Foundation, walls, roofing, flooring, civil fixtures |
| Electrical Works |
Wiring, panels, lighting, earthing |
| Completion Period |
3 months |
| Quality Standards |
As per Gujarat State Power Corporation standards |
• All materials used must be compliant with Indian standards and approved by GETCO.
• Work must be carried out with minimum disruption to existing operations.
• Final inspection and approval will be conducted by GETCO officials.