Repair of 2 Ton Split AC,Filling of Gas,Replacement of Capacitor,Repair of leakage in cooling pipe,
Indian Army
JODHPUR, RAJASTHAN
Progress
Quantity
18
Category
Repair of Air Compressor Motor
Bid Type
Single Packet Bid
The opportunity is with the Indian Army under the Department Of Military Affairs for multiple air conditioning and related services in JODHPUR, RAJASTHAN (342001). Scope includes gas refilling, replacement of capacitors, repair of air compressor motors, labour charges, repair of leakage in cooling pipes, and AC cleaning chemical supply. BoQ lists 6 items, but exact quantities are not disclosed. Estimated contract value is not provided. The tender introduces an option clause allowing up to 25% quantity variation during and after award at contracted rates. A key differentiator is the requirement for on-record service coverage and post-award delivery alignment with extended timelines if options are exercised.
The procurement emphasizes flexibility in quantity and delivery with the option clause, while maintaining strict adherence to service and inspection protocols. Bidders should prepare for potential scale-up and ensure readiness for rapid deployment within the extended delivery framework.
Location-specific conditions include the need for bidders to satisfy service capability in Rajasthan and establish a local presence if not already available, with evidence of functional service centers as a prerequisite for payment release.
No explicit product specifications are published. From the BOQ and tender terms, bidders should delineate capability to perform gas refilling, capacitor replacement, AC motor repair, leakage repairs in cooling systems, and supply AC cleaning chemicals. The tender requires readiness for pre-dispatch or post-receipt inspections as determined by the nominated inspection agency, and compliance with any ATC-specified certificates. The option clause implies scalable quantities, necessitating robust supply chain and service-response capacity. The contract may involve on-site or carry-in warranty terms, depending on the chosen configuration.
Key compliance elements include establishing a Functional Service Centre in the state of each consignee location (within 30 days if not present), and submission of documentary evidence for service capability prior to payment.
Inspection modalities include potential pre-dispatch and post-receipt checks, with acceptance after successful sample testing where applicable.
Certificates and bid compliance are mandatory; failure to upload required documents may lead to rejection.
Product/Service: Gas refilling, capacitor replacement, AC motor repair, leakage repair in cooling pipes, labour charges, AC cleaning chemical supply
Quantity/Value: Not disclosed in BOQ; option clause allows up to 25% quantity variation
Delivery: Extended delivery time may be applied if option clause is exercised; minimum extension baseline 30 days
Standards/Certifications: Not specified in tender data; bidders must submit required certificates per ATC
Inspection: Pre-dispatch and/or post-receipt inspection as determined by nominated agency
Service Centre: Functional service center required in each consignee state; establishment within 30 days if absent
Option Clause: Up to 25% quantity variation at contracted rates
Delivery: Time extension formula with minimum 30 days
Service Centre: Mandatory presence or establishment within 30 days with payment linked to evidence
Payment to be released after submission of documentary evidence of having a Functional Service Centre, with potential staged payments aligned to delivery and inspection outcomes.
Delivery period linked to original order; extended period applies if option quantity is exercised; additional time calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days.
Not explicitly stated; implied adherence to standard government procurement penalty framework via LOA and performance norms
Must have functional service capability in Rajasthan or establish one within 30 days of award
Experience in air conditioning, gas refilling, and repair works
Compliance with all required certificates and documentary submissions per ATC
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Gas Refilling , Replacement of Capacitor , Repair of Air Compressor Motor , Labour Charge , Repair of Leakage in Cooling Pipe , AC Cleaning Chemical
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
JODHPUR CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | JODHPUR CITY | JODHPUR CITY | - | - | 5 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
Indian Army
HYDERABAD, TELANGANA
Tender Results
Loading results...
Gas Refilling
Gas Refilling
Replacement of Capacitor
Replacement of Capacitor
Repair of Air Compressor Motor
Repair of Air Compressor Motor
Labour Charge
Labour Charge
Repair of Leakage in Cooling Pipe
Repair of Leakage in Cooling Pipe
AC Cleaning Chemical
AC Cleaning Chemical
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Gas Refilling | Gas Refilling | 5 | nos | marusanchar@24 | 15 | |
| 2 | Replacement of Capacitor | Replacement of Capacitor | 2 | nos | marusanchar@24 | 15 | |
| 3 | Repair of Air Compressor Motor | Repair of Air Compressor Motor | 1 | nos | marusanchar@24 | 15 | |
| 4 | Labour Charge | Labour Charge | 5 | job | marusanchar@24 | 15 | |
| 5 | Repair of Leakage in Cooling Pipe | Repair of Leakage in Cooling Pipe | 4 | nos | marusanchar@24 | 15 | |
| 6 | AC Cleaning Chemical | AC Cleaning Chemical | 1 | nos | marusanchar@24 | 15 |
Discover companies most likely to bid on this tender
GST Registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar AC/gas service works
Financial statements or turnover documents
Proof of EMD/Security deposit as applicable
Technical bid documents and compliance certificates
OEM authorizations or service partnership agreements
Proof of functional Service Centre in the state (if already existing) or evidence of establishment within 30 days
Key insights about RAJASTHAN tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD documentation, and OEM authorizations as per Terms. Ensure a Functional Service Centre in Rajasthan or evidence of establishment within 30 days. Prepare for pre/post-inspection and comply with the 25% quantity option clause.
Required documents include GST registration, PAN, experience certificates in AC/gas services, financial statements, EMD documents, technical compliance certificates, and OEM authorizations. Additionally, provide proof of Functional Service Centre or establishment plan within 30 days of award.
The buyer may increase or decrease bid quantity by up to 25% at contract award and during currency at contracted rates. Delivery time adjusts proportionally using the stated formula, with a minimum extension of 30 days.
Nominated Inspection Agency will conduct either pre-dispatch or post-receipt inspection. Acceptance occurs after passing sample tests at consignee site; pre-dispatch applies if ATC specifies. Ensure readiness for on-site verification and documentation as required.
Bidders must have a Functional Service Centre in the state of the consignee location; if not, establish one within 30 days of award. Payment release is contingent on documentary evidence of the service center’s functionality.
Delivery timelines are linked to the original order, with possible extensions under the option clause. Payment is released after documentary proof of a functional service center and completion of inspection as per agency requirements.
The tender data does not publish explicit standards; bidders must upload required certificates per Bid Document and ATC. Ensure OEM authorizations and quality/compliance certificates are included to avoid rejection.
Six BoQ items cover gas refilling, capacitor replacement, AC motor repair, labour, leakage repair in cooling pipes, and AC cleaning chemical supply. Exact quantities are not disclosed; prepare for scalable procurement and rapid deployment.
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 JAISALMER, RAJASTHAN
N/a
📍 JAMMU, JAMMU & KASHMIR
N/a
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 AMRITSAR, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS