Indian Army Radiator, Timing Belt & Gasket Tender Kupwara Jammu & Kashmir 2026
Indian Army
KUPWARA, JAMMU & KASHMIR
Bid Publish Date
24-Jun-2026, 9:07 am
Bid End Date
06-Jul-2026, 9:00 am
Location
Progress
Quantity
24
Category
Hose Pipe to Radiator
The Indian Army (Department Of Military Affairs) invites bids for a bundle of vehicle spare parts in Kupwara, Jammu & Kashmir (193221). The procurement category includes: Hose Pipe to Radiator, Pan Oil, Timing Chest Cover, Oil Seal Rear, Bearing Bush, Wheel Bearing, Front Wind Shield, Belt Set, Clutch Rel Bearing, Spider Bearing, Bush, Head Gasket, and Head Assy. While exact quantities and estimated value are not disclosed, the tender contemplates a 13-item BOQ and allows a flexible quantity option. A key differentiator is the option clause permitting up to 25% quantity variation, with contracted rates unchanged. A service-after-sale requirement applies if carry-in warranty applies, or establishment of a service center within 30 days if not present at bidding. The tender emphasizes delivery timing logic tied to the original delivery period and extended time computations. This ensures readiness for military vehicle maintenance in the high-altitude region of JK.
Key Term 1: Quantity may be increased/decreased by up to 25% at contract and during currency
Key Term 2: Functional Service Centre required in each consignee state or establish within 30 days
Key Term 3: Payment after documentary evidence of service capability; delivery timelines governed by original delivery period with computed extensions
Delivery timelines linked to original delivery period; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with minimum 30 days; option clause may extend both quantity and time
Bidder/OEM must have a Functional Service Centre in the State of each consignee location; if not, establish within 30 days of award; payment released after documentary evidence of Centre
Purchaser reserves right to increase/decrease quantity up to 25% at placement and during currency; extended delivery period applies accordingly
Tender Category
Goods
Bid To RA
No
Item Category
Hose Pipe to Radiator , Pan Oil , Timing Chest Cover , Oil Seal Rear , Bearing Bush , Wheel Bearing , Front Wind Shield , Belt Set , Clutch Rel Bearing , Spider Bearing , Bush , Head Gasket , Head Assy
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
SRINAGAR, JAMMU & KASHMIR
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
Hose Pipe to Radiator
MG
Pan Oil
MG
Timing Chest Cover
MG
Oil Seal Rear
MG
Bearing Bush
W/B
Wheel Bearing
W/B
Front Wind Shield
Scorpio
Belt Set
Scorpio
Clutch Rel Bearing
Sumo
Spider Bearing
Sumo
Bush
Sumo
Head Gasket
MG
Head Assy
MG
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Hose Pipe to Radiator | MG | 2 | nos | wkspoffr866 | 15 | |
| 2 | Pan Oil | MG | 2 | nos | wkspoffr866 | 15 | |
| 3 | Timing Chest Cover | MG | 1 | nos | wkspoffr866 | 15 | |
| 4 | Oil Seal Rear | MG | 2 | nos | wkspoffr866 | 15 | |
| 5 | Bearing Bush | W/B | 3 | nos | wkspoffr866 | 15 | |
| 6 | Wheel Bearing | W/B | 4 | nos | wkspoffr866 | 15 | |
| 7 | Front Wind Shield | Scorpio | 1 | nos | wkspoffr866 | 15 | |
| 8 | Belt Set | Scorpio | 1 | nos | wkspoffr866 | 15 | |
| 9 | Clutch Rel Bearing | Sumo | 2 | nos | wkspoffr866 | 15 | |
| 10 | Spider Bearing | Sumo | 2 | nos | wkspoffr866 | 15 | |
| 11 | Bush | Sumo | 2 | nos | wkspoffr866 | 15 | |
| 12 | Head Gasket | MG | 1 | nos | wkspoffr866 | 15 | |
| 13 | Head Assy | MG | 1 | nos | wkspoffr866 | 15 |
Discover companies most likely to bid on this tender
- GST registration certificate
- PAN card
- Experience certificates for similar vehicle spare parts supply
- Financial statements (turnover and profitability as required by tender host)
- EMD documentation (exact amount TBD in published tender, typically a security deposit)
- Technical bid documents and specifications compliance
- OEM authorization letters (if bidding as authorized distributor)
- Service center establishment proof or commitment letter if not already present
- Any other standard Army tender documents as per Terms and Conditions
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit all standard documents (GST, PAN, experience certificates, financials) plus OEM authorizations and technical compliance. The Army requires establishing a Functional Service Centre in JK or evidence of an existing centre within 30 days of award; ensure capacity for 13-item BOQ and comply with 25% quantity option.
Required documents include GST registration, PAN, experience certificates for similar supply, financial statements, EMD details, technical bid, OEM authorization, and service capability proof. Provide service center location proofs and any regional registrations necessary for defense procurement.
Delivery follows the original delivery period; with option clause, the extended time is calculated as (Increased quantity ÷ Original quantity) × Original period, minimum 30 days. If the initial period is shorter than 30 days, extended time equals the original period.
Included items cover: Hose Pipe to Radiator, Pan Oil, Timing Chest Cover, Oil Seal Rear, Bearing Bush, Wheel Bearing, Front Wind Shield, Belt Set, Clutch Rel Bearing, Spider Bearing, Bush, Head Gasket, and Head Assy. Quantities are not disclosed in the provided data.
Bidders must have a Functional Service Centre in the state of each consignee location or establish one within 30 days of award. Payment is released after documentary evidence of the centre's existence and capability is provided to the Army.
Warranty terms are conditional: on-site warranty applies where stated, otherwise carry-in warranty requires a local service centre. The buyer may require performance/availability assurances as part of post-award terms; ensure OEM support commitments are documented.
The 25% option allows the purchaser to vary ordered quantities up to a quarter of the bid quantity at contract placement and during currency, without changing the contracted rates. This necessitates flexible logistics, inventory planning, and supplier capacity readiness.
While specific standards aren’t listed in the data, bidders should prepare to meet defense procurement norms, provide OEM authorizations, and supply technical compliance documents. Ensure readiness to align with IS or MIL specifications typically required in Indian Army contracts.
Indian Army
📍 DODA, JAMMU & KASHMIR
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 ALWAR, RAJASTHAN
Indian Army
📍 BUDGAM, JAMMU & KASHMIR
Indian Army
📍 AMBALA, HARYANA
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS