LV7 TATA STORME DOOR SEALING KIT,LV7 TATA STORME ASSY LATCH T G WITH LINK,LV7 TATA STORME OIL FILTE
Indian Army
JODHPUR, RAJASTHAN
Bid Publish Date
19-Nov-2025, 6:47 pm
Bid End Date
29-Nov-2025, 7:00 pm
Bid Opening Date
29-Nov-2025, 7:30 pm
Location
Progress
Quantity
13
Category
LV7 TATA STROME ENGINE OVERHAULT KIT
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks procurement of LV7 Tata Strome engine overhaul components, including overhaul kit, crank shaft, crank bearing inner, water pump, connecting rod, rocker arm, fuel filter, vacuum hose assemblies for TC and EGR, rear shock absorber, suspension bush kit, and upper/wishbone ball joints. The BOQ lists 12 items, with 12 potential SKUs across a single vehicle system, and an implied project scope for comprehensive engine and suspension parts. The buyer imposes a 25% quantity option and reserves delivery-time extensions aligned to the original delivery schedule. A sample submission is explicitly required before bid closure. Location details are not disclosed in the tender metadata. The estimated value and EMD amounts are not provided, but the presence of a 12-item LV7 Tata Strome family indicates a high-value, OEM-aligned supply contract. This tender emphasizes sample verification and material acceptance, with a stringent ATC clause on acceptance or rejection of materials.
LV7 Tata Strome engine overhaul kit and related parts
Crank shaft, crank bearing inner, water pump, connecting rod
Rocker arm, fuel filter, vacuum hose assemblies for TC and EGR
Rear shock absorber, suspension bush kit, assy ball joints upper wishbone
OEM-aligned components with Tata Strome specifications
No explicit performance metrics or IS/ISO standards provided
25% quantity adjustment right during contract; delivery time recalculated with minimum 30 days
Turnover criterion: average annual turnover over last 3 years; documented
Sample submission required prior to bid submission; material acceptance at purchaser discretion
Purchaser may modify quantity by up to 25% during contract, with extended delivery time based on (increased/original) quantity.
Delivery period starts from last date of original delivery order; extended period uses calculated formula with minimum 30 days.
Purchaser reserves right to accept or reject supplied material based on sample or conformity to OEM Tata Strome specifications.
Minimum turnover as specified in bid document, evidenced by audited statements or CA certificate
Past project experience proofs acceptable (contracts, invoices, execution certificates)
OEM authorization or evidence of capability to supply LV7 Tata Strome components
Indian Army
JODHPUR, RAJASTHAN
Indian Army
AMRITSAR, PUNJAB
Indian Army
AMRITSAR, PUNJAB
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | LV7 TATA STROME ENGINE OVERHAULT KIT | LV7 TATA STROME ENGINE OVERHAULT KIT | 1 | numbers | consignee837fwc | 15 |
| 2 | LV7 TATA STROME CRANK SHAFT | LV7 TATA STROME CRANK SHAFT | 1 | numbers | consignee837fwc | 15 |
| 3 | LV7 TATA STROME CRANK BEARING INNER | LV7 TATA STROME CRANK BEARING INNER | 1 | numbers | consignee837fwc | 15 |
| 4 | LV7 TATA STROME WATER PUMP | LV7 TATA STROME WATER PUMP | 1 | numbers | consignee837fwc | 15 |
| 5 | LV7 TATA STROME CONNECTING ROD | LV7 TATA STROME CONNECTING ROD | 1 | numbers | consignee837fwc | 15 |
| 6 | LV7 TATA STROME ROCKER ARM | LV7 TATA STROME ROCKER ARM | 1 | numbers | consignee837fwc | 15 |
| 7 | LV7 TATA STROME FUEL FILTER | LV7 TATA STROME FUEL FILTER | 1 | numbers | consignee837fwc | 15 |
| 8 | LV7 TATA STROME ASSY VACCUM HOSE FOR TC | LV7 TATA STROME ASSY VACCUM HOSE FOR TC | 1 | numbers | consignee837fwc | 15 |
| 9 | LV7 TATA STROME ASSY VACCUM HOSE FOR EGR | LV7 TATA STROME ASSY VACCUM HOSE FOR EGR | 1 | numbers | consignee837fwc | 15 |
| 10 | LV7 TATA STROME REAR SHOCK ABSORBER | LV7 TATA STROME REAR SHOCK ABSORBER | 2 | numbers | consignee837fwc | 15 |
| 11 | LV7 TATA STROME SUSPENSION BUSH KIT | LV7 TATA STROME SUSPENSION BUSH KIT | 1 | numbers | consignee837fwc | 15 |
| 12 | LV7 TATA STROME ASSY BALL JOINTS UPPER WISHBONE | LV7 TATA STROME ASSY BALL JOINTS UPPER WISHBONE | 1 | numbers | consignee837fwc | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate indicating turnover
Past experience proof: contract copies, invoices with bidder self-certification, execution certificates
Technical bid documents and OEM authorizations (if applicable)
Sample submission document or sample provision note
Any other bidder compliance certificates referenced in ATC
Key insights about MADHYA PRADESH tender market
Bidders must submit GST, PAN, turnover proofs, and past experience documents. Include OEM capability evidence for Tata Strome components, and a sample before the bid submission deadline. Ensure compliance with the option clause and provide detailed delivery timelines aligned to the original order date.
Submit GST registration, PAN, audited financials or CA certificate for turnover, contract copies or execution certificates for past experience, technical bid, OEM authorizations if applicable, and the required sample before the bid closing date as per ATC.
A physical or digital sample must be submitted prior to the bid submission deadline. The buyer reserves right to accept or reject material based on OEM Tata Strome specifications and sample conformity.
Quantity can be adjusted up to 25% during contract at contracted rates. Delivery time extends from the last date of the original delivery order with minimum 30 days per extension and proportional time for added quantity.
Acceptable proofs include contract copies with invoices and bidder self-certification, execution certificates from clients, and third-party inspection notes or similar documentation indicating successful delivery of relevant components.
Components include engine overhaul kit, crank shaft, crank bearing inner, water pump, connecting rod, rocker arm, fuel filter, vacuum hoses for TC and EGR, rear shock absorber, suspension bush kit, and upper wishbone ball joints, all aligned with Tata Strome specifications.
OEM authorization demonstrates the bidder's capability to supply LV7 Tata Strome parts; include authorization letters or direct supplier evidence to ensure OEM-compliant procurement and acceptance by the Indian Army.
Failure to meet delivery deadlines may trigger penalties or contract termination per ATC; extensions may be granted only with minimum 30-day increments based on the option clause and original schedule.
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 BAREILLY, UTTAR PRADESH
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 JODHPUR, RAJASTHAN
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS