Indian Army Procurement of Automotive Spare Parts in Srinagar Jammu & Kashmir 2026 — OEM Original Equipment Manufacturer Requirements and 25% Quantity Flexibility
Indian Army
SRINAGAR, JAMMU & KASHMIR
Progress
Quantity
8
Category
Rear Axle Wheel Speed Sensor ABS
Bid Type
Two Packet Bid
The Indian Army, under the Department Of Military Affairs, issues a procurement tender for automotive components including rear axle wheel speed sensor ABS, tail light right, tail light assembly LH, front suspension bush kit, rear suspension bush kit, and drive shaft assembly. The BOQ lists 6 items, with no specified quantities or estimated value in the provided data. Bidders must meet ISO 9001 certification and submit Material Test Certificates. Turnover criteria apply to both bidders and OEMs, with three years of financial history required and audited documents or CA certificates to prove turnover. The tender emphasizes OEM eligibility, quality control via vendor lab testing, and adherence to certificate requirements. Location is national in scope, and the tender includes specific supplier qualifications and testing criteria to ensure component conformity and reliability.
Key differentiators include mandatory ISO 9001 compliance, Material Test Certificate submission, and turnover thresholds for both bidders and OEMs. The absence of explicit quantities and value suggests a flexible, group-bidding environment where OEMs with strong financials and verified quality systems gain eligibility. This tender requires robust documentation and traceability, as well as supply chain readiness for multiple heavy-vehicle automotive components.
Key Term 1: ISO 9001 certification mandatory for bidder or OEM
Key Term 2: Material Test Certificate required with supply
Key Term 3: 3-year turnover evidence required from bidder and OEM
Not specified in provided data; typical government tenders expect payment on delivery or within 30 days post acceptance per contract terms.
Not specified; bidders should anticipate delivery as per supply contract terms and lab acceptance outcomes.
Not specified in provided data; standard practice includes LD for delayed supply, to be defined in the contract.
ISO 9001 certified bidder or OEM
Material Test Certificate availability
3-year turnover evidence (bidder and OEM) with audited statements or CA certificate
Indian Army
SRINAGAR, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
JHANSI, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Rear Axle Wheel Speed Sensor ABS | Rear Axle Wheel Speed Sensor ABS | 2 | nos | buycon3.army.dinjan | 15 |
| 2 | Tail Light Right | Tail Light Right | 1 | nos | buycon3.army.dinjan | 15 |
| 3 | Tail Light Assy LH | Tail Light Assy LH | 2 | nos | buycon3.army.dinjan | 15 |
| 4 | Front Susp Bush Kit | Front Susp Bush Kit | 1 | set | buycon3.army.dinjan | 15 |
| 5 | Rear Susp Bush Kit | Rear Susp Bush Kit | 1 | set | buycon3.army.dinjan | 15 |
| 6 | Assy Drive Shaft | Assy Drive Shaft | 1 | nos | buycon3.army.dinjan | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Audited financial statements or CA certificate showing 3-year turnover
Material Test Certificate
ISO 9001 certificate (bidder or OEM)
OEM authorization / manufacturer's authorization
Technical bid documents
Experience certificates
Any other bidder certificates as per ATC/Corrigendum
Key insights about ASSAM tender market
To bid, ensure your organization or OEM holds ISO 9001 certification, provide a Material Test Certificate, and submit three-year turnover proof via audited balance sheets or CA certificate. Include OEM authorization and all standard documents with your bid, along with the required certificates in the terms and conditions.
Required documents include GST certificate, PAN, three-year turnover proof (audited or CA certificate), Material Test Certificate, ISO 9001 certificate, OEM authorization, and technical bid documents. Ensure all certificates are uploaded with the bid and conform to the ATC and corrigenda.
Suppliers must hold ISO 9001 certification for either the bidder or the OEM. A Material Test Certificate must accompany the supply, and all items are subject to the buyer’s laboratory test results as acceptance criteria.
Bidder turnover must meet the minimum average annual turnover over the last three years, documented via audited balance sheets or CA certificates. OEMs must also meet the same turnover criteria; in bunch bids, the OEM of the primary high-value item must satisfy the criterion.
Acceptance follows the buyer’s lab test results, which are the sole criterion for item acceptance. Ensure your Material Test Certificates are complete and align with the lab’s testing procedures for each component.
The six items include Rear Axle Wheel Speed Sensor ABS, Tail Light Right, Tail Light Assembly LH, Front Suspension Bush Kit, Rear Suspension Bush Kit, and Drive Shaft Assembly. Ensure alignment with ISO 9001 and submit all required certificates for these parts.
Provide OEM turnover proof and an OEM authorization, ensuring the OEM meets the three-year turnover criterion. In case of a bunch bid, the OEM of the highest-valued item must satisfy the turnover requirement and provide relevant financial documentation.
Mandatory certificates include ISO 9001, Material Test Certificate, and standard company documents (GST, PAN, experience certificates). Ensure these are uploaded with the bid, with verification conducted per the ATC and Corrigendum.
Indo Tibetan Border Police (itbp)
📍 LOHIT, ARUNACHAL PRADESH
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 RAJAURI, JAMMU & KASHMIR
Indian Army
📍 KUPWARA, JAMMU & KASHMIR
Indian Army
📍 MEERUT, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS