Soil Investigation,Shifting of men, materials and equipments from one bore to another,Boring 150mm
Armed Forces Tribunal
SOUTH ANDAMAN, ANDAMAN & NICOBAR
Progress
RAQuantity
9
Bid Type
Two Packet Bid
Public procurement opportunity for Indian Army Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 point 0m or at which further boring is restricted refusal occurs, Material and Labour for Preparing trial pit size 1 point 20 m into 1 point 20 m 5 point 00m away from BH Both centrally placed upto depth, Following parameters will form part of the Soil investigation report to be submitted by the consultants, A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation, All pages of soil investigation report shall be serially numbered stamped and signed by the Agency carrying out the soil investigation in VADODARA, GUJARAT. Quantity: 9 issued by. Submission Deadline: 04-06-2025 11: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 point 0m or at which further boring is restricted refusal occurs , Material and Labour for Preparing trial pit size 1 point 20 m into 1 point 20 m 5 point 00m away from BH Both centrally placed upto depth , Following parameters will form part of the Soil investigation report to be submitted by the consultants , A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation , All pages of soil investigation report shall be serially numbered stamped and signed by the Agency carrying out the soil investigation
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Armed Forces Tribunal
SOUTH ANDAMAN, ANDAMAN & NICOBAR
Indian Army
WEST DELHI, DELHI
Armed Forces Tribunal
SOUTH ANDAMAN, ANDAMAN & NICOBAR
Indian Army
Indian Army
Tender Results
Loading results...
Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 point 0m or at which further boring is restricted refusal occurs
Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 point 0m or at which further boring is restricted refusal occurs due to encounter of very stiff soil comma ground or rock etc Collecting samples disturbed and undisturbed and carrying out standard penetration test SPT and report following details One Bore log data up to 10 point 0 mtr Two SPT result N values at every 0 point 50m intervals and change of strata Three Soil classifications Fourth Atterberg Limit Fifth Value of cohesion C and angle of internal friction Sixth Depth ground water table GWT in peak monsoon Lowest and peak summer Highest after correlation of result with seasonal variation of water and table in the station Seventh Swelling properties if any and remedial measures Eight SBC at different depth of foundation i e 0 point 9m comma 1 point 0m comma 1 point 20m comma 1 point 50 m comma 1 point 75m and 2 point 0m etc alonwghwith undermentioned details one All the bore holes two SBC should be worked out for following size of footing 1 point 5 into 1 point 5m 1 point 5 into 2 point 5m 2 point 0 into 2 point 5m 2 point 0 into 3 point 0m 2 point 0 into 3 point 0m Ninth Recommendation for type of foundation of RCC frame structure Tenth RL of the ground level oblique foundation level with ref to a BM should invariably be mentioned in the soil investigation report Eleventh Recommendation as regards possibilities of liquefaction of soil in case of saturated or partially saturated loose uncomplicated sandy soil Twelveth swelling index and swelling pressure in respect of black cotton soil and its depth layer Thirteen Chemical analysis for PH Electrometrically comma Sulphate and chloride contents
Material and Labour for Preparing trial pit size 1 point 20 m into 1 point 20 m 5 point 00m away from BH Both centrally placed upto depth
Material and Labour for Preparing trial pit size 1 point 20 m into 1 point 20 m 5 point 00m away from BH Both centrally placed for conducting of standard test of CBR of soils in soked and unsoked condition as per IS 2720 Part XXXI 1990 comma analysis of field and laboratory test all as per relevent IS codes Note Initially soil investigation for proposed toilet blocks at the DSC billet Harni Camp and Airmen Billet Makarpura was planned to conduct two bore holes per location total 4 boreholes alongwith 4 Nos trail pits however due to the close proximity of the proposed boreholes 44m and 25m respectively the numbers of boreholes was reduced to one per location at DSC Billet Harni Camp and Airmen Billet Makarpura therefore total 6 Nos of boreholes are planned in lieu of 8 Nos for the above subject work for all locations
Following parameters will form part of the Soil investigation report to be submitted by the consultants
Following parameters will form part of the Soil investigation report to be submitted by the consultants one Recommendation for filling under floor Two In area which have already been developed a brief about existing local knowledge records of trial pits bore holes etc in the vicinity and behavior of existing structure particularly those of a nature similar to that of proposed structure shall be included in report Three Every page of soil investigation report should have the name of Job for which soil investigation is being carried out In case of multiple sites of single job are being investigated name of each site shall be put on each page of report pertaining to the site along with the name of the Job
A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation
A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation of adjacent structure especially those that might be impacted by the proposed construction should be indicated with details in site plan
All pages of soil investigation report shall be serially numbered stamped and signed by the Agency carrying out the soil investigation
All pages of soil investigation report shall be serially numbered stamped and signed by the Agency carrying out the soil investigation valid NABL accreditations certificate issued to the agency shall form part of the report Note All material comma labour and T and P required for complete the job is responsibility of the Firm oblique contractor oblique consultant
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 point 0m or at which further boring is restricted refusal occurs | Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 point 0m or at which further boring is restricted refusal occurs due to encounter of very stiff soil comma ground or rock etc Collecting samples disturbed and undisturbed and carrying out standard penetration test SPT and report following details One Bore log data up to 10 point 0 mtr Two SPT result N values at every 0 point 50m intervals and change of strata Three Soil classifications Fourth Atterberg Limit Fifth Value of cohesion C and angle of internal friction Sixth Depth ground water table GWT in peak monsoon Lowest and peak summer Highest after correlation of result with seasonal variation of water and table in the station Seventh Swelling properties if any and remedial measures Eight SBC at different depth of foundation i e 0 point 9m comma 1 point 0m comma 1 point 20m comma 1 point 50 m comma 1 point 75m and 2 point 0m etc alonwghwith undermentioned details one All the bore holes two SBC should be worked out for following size of footing 1 point 5 into 1 point 5m 1 point 5 into 2 point 5m 2 point 0 into 2 point 5m 2 point 0 into 3 point 0m 2 point 0 into 3 point 0m Ninth Recommendation for type of foundation of RCC frame structure Tenth RL of the ground level oblique foundation level with ref to a BM should invariably be mentioned in the soil investigation report Eleventh Recommendation as regards possibilities of liquefaction of soil in case of saturated or partially saturated loose uncomplicated sandy soil Twelveth swelling index and swelling pressure in respect of black cotton soil and its depth layer Thirteen Chemical analysis for PH Electrometrically comma Sulphate and chloride contents | 5 | each | agetbaroda | 30 | |
| 2 | Material and Labour for Preparing trial pit size 1 point 20 m into 1 point 20 m 5 point 00m away from BH Both centrally placed upto depth | Material and Labour for Preparing trial pit size 1 point 20 m into 1 point 20 m 5 point 00m away from BH Both centrally placed for conducting of standard test of CBR of soils in soked and unsoked condition as per IS 2720 Part XXXI 1990 comma analysis of field and laboratory test all as per relevent IS codes Note Initially soil investigation for proposed toilet blocks at the DSC billet Harni Camp and Airmen Billet Makarpura was planned to conduct two bore holes per location total 4 boreholes alongwith 4 Nos trail pits however due to the close proximity of the proposed boreholes 44m and 25m respectively the numbers of boreholes was reduced to one per location at DSC Billet Harni Camp and Airmen Billet Makarpura therefore total 6 Nos of boreholes are planned in lieu of 8 Nos for the above subject work for all locations | 1 | each | agetbaroda | 30 | |
| 3 | Following parameters will form part of the Soil investigation report to be submitted by the consultants | Following parameters will form part of the Soil investigation report to be submitted by the consultants one Recommendation for filling under floor Two In area which have already been developed a brief about existing local knowledge records of trial pits bore holes etc in the vicinity and behavior of existing structure particularly those of a nature similar to that of proposed structure shall be included in report Three Every page of soil investigation report should have the name of Job for which soil investigation is being carried out In case of multiple sites of single job are being investigated name of each site shall be put on each page of report pertaining to the site along with the name of the Job | 1 | each | agetbaroda | 30 | |
| 4 | A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation | A detailed site plan showing the outline of the proposed building and approx location of each bore hole duly numbered as per log of bore hole should be enclosed Location of foundation of adjacent structure especially those that might be impacted by the proposed construction should be indicated with details in site plan | 1 | each | agetbaroda | 30 | |
| 5 | All pages of soil investigation report shall be serially numbered stamped and signed by the Agency carrying out the soil investigation | All pages of soil investigation report shall be serially numbered stamped and signed by the Agency carrying out the soil investigation valid NABL accreditations certificate issued to the agency shall form part of the report Note All material comma labour and T and P required for complete the job is responsibility of the Firm oblique contractor oblique consultant | 1 | each | agetbaroda | 30 |
Experience Criteria
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
17-Jun-2025, 1:00 pm
End
18-Jun-2025, 1:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | GEO DESIGNS AND RESEARCH PRIVATE LIMITED Under PMA | - | 02-06-2025 10:37:57 | |
| 2 | INERTIA ENGINEERING SOLUTIONS Under PMA | - | 21-05-2025 09:52:34 | |
| 3 | SAI GEOTECHNICAL LAB Under PMA | - | 20-05-2025 15:29:12 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | GEO DESIGNS AND RESEARCH PRIVATE LIMITED(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 | |
| L2 | SAI GEOTECHNICAL LAB (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 | |
| L3 | INERTIA ENGINEERING SOLUTIONS (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Material and Labour for conducting soil investigation by drilling boreholes dia 150 mm and depth 10 |
Key insights about GUJARAT tender market
The eligibility requirements include being a registered entity in the relevant sector, compliance with industry regulations, and demonstrating capability to undertake the tasks defined. Bidders should prepare their documents accordingly to validate their qualifications.
Bidders must present technical certificates that affirm their qualification and capability to perform soil investigations, as described in the tender scope. These include certifications for personnel conducting the investigations and documents proving access to necessary drilling equipment.
The registration process typically involves submitting a complete bid including all required documentation, technical qualifications, and financial statements. Interested bidders should ensure they meet the criteria outlined in the tender document to successfully register.
All documents must be submitted in specified formats as detailed in the tender documentation. Bidders should ensure electronic copies are prepared in formats like PDF or Word, and hard copies, if required, should meet the submission guidelines.
Yes, this tender provisions may include specific benefits for Micro, Small, and Medium Enterprises (MSEs). These may involve simplified registration processes, lower performance security requirements, or enhanced evaluation scores. Interested MSEs should refer to the tender documents for full details.
Gujarat Water Supply and Sewerage Board
📍 VADODARA, GUJARAT
Gujarat Water Supply and Sewerage Board
📍 VADODARA, GUJARAT
Indian Army
📍 DEHRADUN, UTTARAKHAND
Indian Army
📍 SAHARANPUR, UTTAR PRADESH
Indian Army
📍 DEHRADUN, UTTARAKHAND
Sign up now to access all documents
Main Document
BOQ
BOQ