PIPE 2 RADIATOR OUTLET,BANJO BOLT M12 X 1.5,LATCH ASSY FRONT DOOR LH,MUD FLAP WHEEL ARCH RH,MUD FLA
Indian Army
Bid Publish Date
20-Jan-2026, 11:55 am
Bid End Date
30-Jan-2026, 12:00 pm
Progress
Quantity
17
Category
FUEL WATER SEPERATOR
Bid Type
Two Packet Bid
Organization: Indian Army, Department Of Military Affairs. Procurement: multi-item category including FUEL WATER SEPERATOR, INNER LATCH ASSY LH, DOOR HANDLE RH/LH, LOWER DOOR TINTED GLASS, KIT SEAL, DIE DUEL FILTER, COMBINATION SWITCH, NUT RIVET M8. BOQ: 9 total items listed with no itemized quantities. Advance sample is mandatory before technical bid opening. An OEM/authorized seller must have an in-India presence for imported products to ensure after-sales service. Option clause allows +/-25% quantity adjustment at contract rates with delivery timelines linked to the last delivery order date. This tender reflects standard procurement controls and supplier capability verification by the Indian Army. Location details are not specified in the data provided, emphasizing national scope within India.
Fuel Water Separator
Inner Latch Assembly LH
Door Handle RH
Door Handle LH
Lower Door Tinted Glass
Kit Seal
Die Duel Filter
Combination Switch
NUT RIVET M8
Advance sample mandatory before technical bid opening
OEM/Authorized seller must have India-based post-sales service for imported items
Quantity adjustments permitted up to 25% with proportional delivery extensions
Delivery period begins after the last date of original delivery order; extended period uses (increased quantity / original quantity) × original delivery period with a minimum of 30 days
Imported items require an OEM or Authorized Seller with an India registered office to provide after-sales service; certificate to be submitted
Advance sample is required prior to opening of technical bid; failure to submit may lead to rejection
Evidence of capability to supply hardware components listed (fuel separator, door hardware, filters, etc.)
Demonstrated experience in similar supply contracts to government bodies
Compliance with OEM authorization requirements for imported items
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
Pathankot, PUNJAB
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
SONITPUR, ASSAM
Indian Army
JALPAIGURI, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | FUEL WATER SEPERATOR | FUEL WATER SEPERATOR | 2 | nos | tss805 | 15 |
| 2 | INNER LATCH ASSY LH | INNER LATCH ASSY LH | 2 | nos | tss805 | 15 |
| 3 | DOOR HANDLE RH | DOOR HANDLE RH | 2 | nos | tss805 | 15 |
| 4 | DOOR HANDLE LH | DOOR HANDLE LH | 2 | nos | tss805 | 15 |
| 5 | LOWER DOOR TINTED GLASS | LOWER DOOR TINTED GLASS | 2 | nos | tss805 | 15 |
| 6 | KIT SEAL | KIT SEAL | 1 | nos | tss805 | 15 |
| 7 | DIE DUEL FILTER | DIE DUEL FILTER | 1 | nos | tss805 | 15 |
| 8 | COMBINATION SWITCH | COMBINATION SWITCH | 1 | nos | tss805 | 15 |
| 9 | NUT RIVET M8 | NUT RIVET M8 | 4 | nos | tss805 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar hardware/assembly supply
Financial statements (last 2-3 years) demonstrating capability
EMD submission proof (as applicable to tender rules)
Technical bid document outlining compliance with OEM/IS standards
OEM authorization letter (for non-OEM bidders proposing OEM products)
Certificate of Indian registered office (for imported products via OEM)
Bidders should submit GST and PAN, provide experience certificates for similar hardware supply, and include an OEM authorization if proposing imported items. An advance sample is mandatory before technical bid opening, and the OEM must have an India-based registered office for after-sales service.
Required documents include GST registration, PAN, financial statements, experience certificates, OEM authorization (for imported items), and technical bid detailing compliance with listed components. EMD proof, if applicable, must accompany the bid along with any certificates proving Indian service support.
Delivery timelines begin from the last date of the original delivery order, with potential extension per the option clause. If quantity increases, the additional time is calculated as ( Increased quantity / Original quantity ) × Original delivery period, with a minimum of 30 days.
Imported items require an OEM or Authorized Seller with an India-based registered office to provide after-sales service; submit a certificate confirming this arrangement. Ensure compliance with any organization-specific standards applicable to the listed components.
The purchaser may increase or decrease the ordered quantity by up to 25% at contract placement and during the contract, at contracted rates. The delivery period adjusts per the calculated formula, maintaining minimum 30 days.
Advance sample is mandatory before technical bid opening; depending on approval, bids proceed to technical evaluation. This ensures conformity of components such as fuel separators, door handles, and seals with Army requirements.
An OEM or Authorized Seller must have a registered Indian office to provide after-sales service. Submit an OEM authorization and Indian service capability certificate to satisfy this eligibility criterion.
The BOQ lists 9 items, including fuel separators and door hardware, but specific quantities are not disclosed. Bidders should prepare capability across all listed components and reference the 25% variation and sample requirements in their submission.
Indian Army
📍 AMRITSAR, PUNJAB
Indian Army
📍 BIKANER, RAJASTHAN
Indian Army
📍 Pathankot, PUNJAB
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 KAMRUP, ASSAM
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS