TenderDekho Logo
GEM

Indian Army Suspension & Mechanical Fasteners Tender 2026: ISI/IS warranty, 7 item scope, 25% flex, India

Bid Publish Date

08-Jul-2026, 11:12 am

Bid End Date

20-Jul-2026, 9:00 am

Location

LEH , JAMMU & KASHMIR

Progress

Issue08-Jul-2026, 11:12 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

66

Category

SUSPENSION BUSH KIT

Bid Type

Single Packet Bid

Tender Overview

The Indian Army (Department of Military Affairs) invites bids for a supply-only package covering seven specified components: Suspension Bush Kit, Fuel Pump Electronic, Valve Rocker Assembly, Bolt 12 X 90, Latch Hood, Front Hub Nut Lock, and Copper Washer 16 dia. The BOQ lists 7 items; exact quantities and itemized values are not disclosed. The contract allows a quantity variation up to 25% during placement and within currency, at contracted rates. OEM warranty certificates are required; after-sales installation/commissioning and a nationwide service network in India must be demonstrated. The tender emphasizes delivery timing relative to original and extended periods. This procurement targets maintenance or upgrade of military hardware components and expects compliant suppliers with robust after-sales support.

Keywords: tender in India, Indian Army procurement, supply of mechanical components, 25% quantity variation, OEM warranty certificates, Indian service centers, 7 item scope, supply contract.

Technical Specifications & Requirements

  • Product names: Suspension Bush Kit; Fuel Pump Electronic; Valve Rocker; Bolt 12 X 90; Latch Hood; Front Hub Nut Lock; Copper Washer 16 dia copper washer
  • Quantity/scope: 7 items; exact quantities not disclosed; bid price to include all cost components (scope of supply: goods only)
  • Standards/quality: Not specified in tender data; OEM warranty certificates required; installation/commissioning/training and maintenance service group in India
  • Delivery/service: Delivery period linked to original delivery order; option clause allows extension; additional time calculation formula provided (subject to minimum 30 days)
  • Warranty & after-sales: OEM warranty; service centers near consignee destinations to be uploaded; rectification of breakdown during guarantee period guaranteed
  • Documentation: OEM authorizations and technical compliance certificates expected at delivery
  • Contractual scope: Only supply of goods; installation/commissioning may be included if scope covers it; successful bidder to provide installation/training support

Terms, Conditions & Eligibility

  • EMD: Not specified in data; bidders must comply with standard EMD requirements per buyer terms
  • Quantity variation: Up to 25% both at contract award and during currency
  • Delivery: Periods commence from last date of the original delivery order; extended periods follow the same logic; minimum 30 days for added time
  • Warranty: OEM warranties to be submitted; service network in India required; post-delivery rectification guaranteed
  • Submission documents: GST registration, PAN, experience certificates, financial statements, OEM authorizations, EMD documents, technical bid, and service center details
  • Payment terms: Not specified in data; standard government practice applies (to be confirmed during bid)
  • Penalties: Not detailed in data; standard liquidated damages may apply per contract terms
  • Other: Bidder must have capability for installation, commissioning, training, and maintenance within India

Key Specifications

    • Product/service names: Suspension Bush Kit; Fuel Pump Electronic; Valve Rocker; Bolt 12 X 90; Latch Hood; Front Hub Nut Lock; Copper Washer 16 dia copper washer
    • Item count: 7 items in BOQ; quantities not disclosed
    • EMD/Estimated value: Not specified
    • Standards/certifications: OEM warranty certificates required; IS/ISO standards not specified
    • Delivery: Quantities may be increased up to 25% during contract; delivery duration formula provided

Terms & Conditions

  • Key Term 1: Quantity variation allowed up to 25% during contract at contracted rates

  • Key Term 2: OEM warranty certificates required at delivery

  • Key Term 3: Delivery period extends from original last delivery date with minimum 30 days for added time

Important Clauses

Delivery Schedule

Delivery periods commence from the last date of the original delivery order; extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days

Warranty & After-Sales

OEM warranty certificates required; seller must ensure rectification of breakdown during guarantee; installation, commissioning, training, and maintenance service group must operate in India with service centers near consignee destinations

Scope of Supply

Bid price must include all cost components; scope limited to supply of goods only (extra services if included in scope to be defined)

Bidder Eligibility

  • Experience in supplying mechanical components for defense or similar sector

  • Demonstrated OEM authorization or resale rights for listed items

  • Adherence to India-based after-sales service capabilities and nationwide service network

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SUSPENSION BUSH KIT , FUEL PUMP ELECTRONIC , ARM VALVE ROCKER , BOLT 12 X 90 , LATCH HOOD , FRONT HUB NUT LOCK , COPPER WASHER 16 DIA COPPER WASHER

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9573933.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

SUSPENSION BUSH KIT,OIL SEAL,OIL FILTER,GAUGE ASSY FUEL LEVEL,FORK HIGH SPEED,AIR DRYER REP KIT,CLU

Indian Army

LUCKNOW, UTTAR PRADESH

Posted: 19 February 2026
Closed: 2 March 2026
GEM

Vane Pump,Suspension Bush Kit,Cover Assy 228 Dia Pressure Plate,Clutch Plate Assy,Engine Mounting P

Indian Army

Posted: 27 November 2024
Closed: 18 December 2024
GEM

Indian Army Bush Set & Automotive Spare Parts Tender Budgam Jammu & Kashmir 2025 - 12 item procurement with 25% option clause

Indian Army

BUDGAM, JAMMU & KASHMIR

Posted: 3 November 2025
Closed: 13 November 2025
GEM

SUSPENSION BUSH KIT,JOINT ASSY UNIVERSAL,FUEL PRIMING PUMP,BEARING,OIL SEAL,PIPE,ASSY STARTER MOTOR

Indian Army

DARJEELING, WEST BENGAL

Posted: 22 April 2025
Closed: 13 May 2025
GEM

FUEL FEED PUMP,BOLT AND SPACER KIT,BRAKE PAD,ASSY KIT LINED SHOE,POWER STERRING PUMP ASSY,HOSE ASSY

Indian Army

EAST SIKKIM, SIKKIM

Posted: 12 October 2025
Closed: 23 October 2025
GEM

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

SUSPENSION BUSH KIT

SUSPENSION BUSH KIT

2 nos Delivery: 180 days
#2

FUEL PUMP ELECTRONIC

FUEL PUMP ELECTRONIC

2 nos Delivery: 180 days
#3

ARM VALVE ROCKER

ARM VALVE ROCKER

2 nos Delivery: 180 days
#4

BOLT 12 X 90

BOLT 12 X 90

2 nos Delivery: 180 days
#5

LATCH HOOD

LATCH HOOD

2 nos Delivery: 180 days
#6

FRONT HUB NUT LOCK

FRONT HUB NUT LOCK

2 nos Delivery: 180 days
#7

COPPER WASHER 16 DIA COPPER WASHER

COPPER WASHER 16 DIA COPPER WASHER

54 nos Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply

4

Financial statements (audited if available)

5

EMD submission documents (as per buyer terms)

6

OEM authorization/cendorization certificates

7

Technical bid documentation demonstrating compliance

8

Warranty/after-sales capability and service center details

9

Installation/commissioning/training capability statement

Frequently Asked Questions

How to bid for suspension bush kit and related components in India tender

Bidders must submit GST, PAN, experience certificates, financial statements, OEM authorizations, and EMD documents. Ensure OEM warranty certificates are provided at delivery, and demonstrate installation/commissioning capability and a national service center network in India.

What documents are required for Indian Army supply tender in India 2026

Required documents include GST registration, PAN, experience certificates for similar supply, audited financial statements, EMD submission, technical bid, OEM authorization, and service-center details for post-delivery support and maintenance services.

What are the delivery terms for quantity variation in this Army tender

The purchaser may increase quantity up to 25% at contracted rates either at award or during the currency. Delivery time is calculated from the last date of the original delivery order, with a minimum added-time of 30 days; extended duration can be pursued within original limits.

What standards or certifications are required for the OEM goods

OEM warranty certificates are mandatory; a robust installation, commissioning, training, and maintenance service group in India is required. Service centers near consignee destinations must be listed, and components should be supported under warranty during the guarantee period.

What is the scope of supply for this Indian Army procurement

The scope is strictly supply of goods for seven items: Suspension Bush Kit, Fuel Pump Electronic, Valve Rocker, Bolt 12 X 90, Latch Hood, Front Hub Nut Lock, Copper Washer 16 dia. No additional installation costs are specified, but training/support may be included per contract terms.

When is OEM warranty documentation required for delivery

OEM warranty certificates must accompany the delivery of goods from the successful bidder. The warranty covers rectification during the guarantee period; ensure all certificates are ready at the time of delivery to avoid compliance issues.

What is required to prove service capability in India for post-sale support

Submit detailed post-sales support plans, including service centers locations, response times, technician availability, and maintenance processes. Demonstrate established service group in India with nationwide coverage to support the seven listed items.

What items constitute the seven procurement components for this bid

The seven items are: Suspension Bush Kit; Fuel Pump Electronic; Valve Rocker; Bolt 12 X 90; Latch Hood; Front Hub Nut Lock; Copper Washer 16 dia copper washer. Exact quantities are not disclosed in the tender data; bid must cover all seven items.

Similar Tenders

5 found
Urgent

Indian Army Mounting Pad & Spare Parts Tender Kargil Jammu & Kashmir 2026 - 25% Quantity Variation & Pre-Dispatch Inspection

Indian Army

📍 KARGIL, JAMMU & KASHMIR

Est: ₹61,925
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Procurement of Bush Holder and Related Spares Baramulla Jammu & Kashmir 2026 ISO/IS 550 Related Standards

Indian Army

📍 BARAMULLA, JAMMU & KASHMIR

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Field coil 12v,Bearing bush set,Chain sprocket set,Inlet valve,Rear brake booster,Speedometer head,

Indian Army

📍 BIKANER, RAJASTHAN

⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM
Urgent

Indian Army Armature Assy 24V / Brake Actuator / Door Lock Front LH Tender Amritsar Punjab 2026

Indian Army

📍 AMRITSAR, PUNJAB

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Department Of Military Affairs Tie Rod Assy, Pump Assy Fuel, Fan Assembly Tender Allahabad Uttar Pradesh 2026

Indian Army

📍 ALLAHABAD, UTTAR PRADESH

⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM

Explore More Opportunities

Quick Access