Indian Army Tool Kit Procurement in Jodhpur Rajasthan 2026 - IS 550/ISO Standards, Detailed Design Drawings Approval 5 Days
Indian Army
JODHPUR, RAJASTHAN
Progress
Quantity
281
Category
TOOL KIT CVD 2254 000010 CHAIN ASSY TYRE PERSON TYPE
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks procurement of multiple tool kit and accessory items (including CHAIN ASSY TYRE, SCABBARD DAH, BOOT, LAMP, V BELT) under a single contract with an estimated value not disclosed. An EMD of ₹36,000 is required. The contract emphasizes post-award design validation, with supplier submission of Detailed Design Drawings within 5 days and buyer approval or modification list within 5 days. The BOQ lists 5 items but provides no unit quantities. The arrangement includes a flexible quantity option of up to 50% more or less at contracted rates and a delivery-period recalibration aligned to the last delivery date. Unique acceptance criteria include approved drawings and advance samples before bulk production, with LD adjustments for draw-down delays. The tender is positioned for military stores, with pre- or post-dispatch inspection and quality controls aligned to buyer-directed standards. The absence of specific item quantities or localities requires bidders to rely on the contractual flow and modification framework to plan production and delivery.
Tool kit and accessory items with no explicit unit quantities listed
Advance sample submission and approval process outlined
Detailed Design Drawings (DDD) required within 5 days of award
50% quantity variation option at contracted rates
Post Receipt Inspection (BOO) at consignee site
Advance sample approval within 5 days of award
Detailed Design Drawings to be approved or modified within 5 days
Option clause allows up to 50% quantity variation
Not explicitly defined in available data; bidders to await formal contract terms.
Delivery timelines adjustable based on approval delays; no LD for buyer delay in drawing/sample approvals.
Not specified; LD details to be provided in formal contract.
Experience in supplying military/tool kit components
Ability to submit Detailed Design Drawings and advance samples within 5 days
Financial stability evidenced by audited statements and ability to meet EMD
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
TOOL KIT CVD 2254 000010 CHAIN ASSY TYRE PERSON TYPE , TOOL KIT BA 0211 SCABBARD DAH MK 3 CANVAS FOR DAH , LV7 2530 001176 BOOT , LV7 6212 0510 075 LAMP W , TOOL KIT CVD 2525 201 66305 V BELT 1290
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
TOOL KIT CVD 2254 000010 CHAIN ASSY TYRE PERSON TYPE
TOOL KIT CVD 2254 000010 CHAIN ASSY TYRE PERSON TYPE
TOOL KIT BA 0211 SCABBARD DAH MK 3 CANVAS FOR DAH
TOOL KIT BA 0211 SCABBARD DAH MK 3 CANVAS FOR DAH
LV7 2530 001176 BOOT
LV7 2530 001176 BOOT
LV7 6212 0510 075 LAMP W
LV7 6212 0510 075 LAMP W
TOOL KIT CVD 2525 201 66305 V BELT 1290
TOOL KIT CVD 2525 201 66305 V BELT 1290
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | TOOL KIT CVD 2254 000010 CHAIN ASSY TYRE PERSON TYPE | TOOL KIT CVD 2254 000010 CHAIN ASSY TYRE PERSON TYPE | 179 | nos | lpo312@33adou | 15 | |
| 2 | TOOL KIT BA 0211 SCABBARD DAH MK 3 CANVAS FOR DAH | TOOL KIT BA 0211 SCABBARD DAH MK 3 CANVAS FOR DAH | 27 | nos | lpo312@33adou | 15 | |
| 3 | LV7 2530 001176 BOOT | LV7 2530 001176 BOOT | 18 | nos | lpo312@33adou | 15 | |
| 4 | LV7 6212 0510 075 LAMP W | LV7 6212 0510 075 LAMP W | 33 | nos | lpo312@33adou | 15 | |
| 5 | TOOL KIT CVD 2525 201 66305 V BELT 1290 | TOOL KIT CVD 2525 201 66305 V BELT 1290 | 24 | nos | lpo312@33adou | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar tool kit procurement
Financial statements (latest audited if available)
EMD submission proof (₹36,000)
Technical bid documents and supplier capability statements
OEM authorization (if applicable)
Key insights about HARYANA tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD of ₹36,000. Prepare Technical bid with OEM authorizations if applicable, and ensure Detailed Design Drawings are submitted within 5 days of award for buyer approval or modification lists.
Required documents include GST certificate, PAN, experience certificates for similar tooling, latest financial statements, EMD proof of ₹36,000, technical bid, and OEM authorization if applicable. Also include drawings/designs and sample submission details per ATC modifications.
Submit 1 advance sample within 5 days of award; buyer to approve or specify modifications within 5 days. If delayed, delivery schedule is rejigged without LD. Ensure the sample adheres to contract specifications framework and aligns with approved drawings.
Purchaser may increase or decrease the bid quantity up to 50% at contracted rates. Additional time for delivery is calculated as (additional quantity / original quantity) × original delivery period, with a minimum of 30 days.
Inspection is Post Receipt Inspection at the consignee site (BOO). Pre-dispatch inspection is not clearly mandated in the available data; the buyer may appoint a Nominated Inspection Agency for specific cases.
Delivery period is refixed and LD is avoided for the delay period in approval. The original schedule resumes once the buyer approves the drawings or samples and communicates modifications.
Submit approved Detailed Design Drawings, advance sample approval confirmation, EMD submission proof, and OEM authorization where applicable. Ensure post-approval modifications are documented and aligned with the contract framework and inspection plan.
If the purchaser exercises the 50% option, pricing remains at contracted rates. The contractor must deliver the revised quantity within the extended delivery framework without LD for approved delays.
Indian Army
📍 HISAR, HARYANA
Indian Army
📍 HISAR, HARYANA
Indian Army
📍 HISAR, HARYANA
Indian Army
📍 HISAR, HARYANA
Indian Army
📍 HISAR, HARYANA
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS