TenderDekho Logo
GEM

E-municipalities Uttar Pradesh LED Luminaire Bid 2026 IS 10322 BIS Scheme II

Bid Publish Date

17-Feb-2026, 8:17 am

Bid End Date

27-Feb-2026, 9:00 am

EMD

₹70,000

Progress

Issue17-Feb-2026, 8:17 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

50

Bid Type

Two Packet Bid

Categories 5

Tender Overview

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh seeks a LED Luminaire for road and street lights conforming to IS 10322 (Part 5/Section 3) under BIS Scheme II. The procurement includes supply, installation, testing, commissioning and operator training, with statutory clearances if any. The contract may allow a 25% quantity variation both at award and during the currency, at contracted rates. A Detailed Design Drawings approval must be completed within 5 days of award; non-approval triggers rework without LD. The tender requires bidders to demonstrate financial stability and a minimum average turnover over the last three years, with GST considerations as per applicable rates. The project location is Uttar Pradesh, aligning with urban development objectives and street lighting modernization. The unique aspect is the combination of IS 10322 compliance, BIS Scheme II testing, and a flexible quantity mechanism during contract execution. This tender targets LED luminaires with clear performance parameters amid an otherwise uncertainty-free scope, emphasizing conformity to standards and timely design alignment.

Technical Specifications & Requirements

  • Category: Performance parameters for LED luminaire systems
  • Key metrics: System Wattage (in Watt) and LED Luminaire System Efficacy (in lumen/watt)
  • Standards: IS 10322 (Part 5/Section 3); BIS Scheme II compliance
  • EMD: ₹70,000 (demanded with bid submission)
  • Delivery & scope: Supply, Installation, Testing, Commissioning, and Operator Training; statutory clearances if required
  • Variability: Optional quantity increase up to 25% of bid quantity at contract stage
  • Approval: Detailed Design Drawings approval within 5 days of award; subsequent modification list provided within 5 days if required
  • Financial/eligibility: Bidder turnover to meet the minimum average turnover over the last three years; GST considerations per applicable rates
  • Delivery terms: Extended period adjustments if approvals are delayed; LD conditions not specified
  • Warranty/aftercare: Not explicitly stated in data provided; vendor to align with tender terms

Terms, Conditions & Eligibility

  • EMD: ₹70,000 to be paid as per bidding terms
  • Quantity flexibility: Up to 25% increase/decrease permissible at contract time and during currency
  • Design approvals: Submit Detailed Design Drawings within 5 days of award; buyer response within 5 days; rework without LD if buyer delays
  • Financial standing: Bidder must not be in liquidation or bankruptcy and must upload an undertaking
  • Product life: Offered products must have at least 3 years residual market life and not be end-of-life per OEM
  • GST: Bidder to determine applicable GST; reimbursement as per actuals or applicable rates, whichever is lower
  • Scope of supply: Prices include supply, installation, testing, commissioning, and operator training; statutory clearances if any
  • Turnover requirement: Minimum average annual turnover over the last three years as indicated in the bid document
  • Delivery timelines: Delivery period to be aligned with design approvals; extensions permitted via option clause with calculated extended time
  • Other: No BOQ items listed; emphasis on compliance with IS 10322/ BIS II and safe execution

Key Specifications

  • LED Luminaire for Road/Street Lighting conforming to IS 10322 (Part 5/Section 3) under BIS Scheme II

  • Performance parameters include: System Wattage and LED Luminaire System Efficacy

  • Bidder to supply, install, test and commission with operator training

  • Option clause allows quantity variation up to 25% during contract

  • Approval of Detailed Design Drawings within 5 days of award; modifications provided within 5 days

Terms & Conditions

  • 25% quantity variation allowed at contract award and during currency

  • IS 10322 (Part 5/Section 3) compliance with BIS Scheme II

  • EMD amount of ₹70,000 and GST considerations as per applicable rates

Important Clauses

Payment Terms

GST and actual applicable rates to be reimbursed; payment terms aligned with contract and delivery milestones

Delivery Schedule

Delivery timeline dependent on approval of Detailed Design Drawings within 5 days of award; extensions possible with no LD if drawings are delayed

Penalties/Liquidated Damages

Not explicitly stated in data; LD applicable as per contract terms if delivery/default occurs

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Demonstrated turnover meeting minimum average over last 3 years

  • Experience in supplying/installing LED luminaires for road/streets with IS 10322 BIS II alignment

Documents 4

GeM-Bidding-8990250.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Performance Parameters System Wattage (in Watt) 120
Performance Parameters LED Luminaire System Efficacy (in lumen/watt) 100, 120, 140 Or higher

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements for last three years

4

CTC of turnover calculations showing minimum average turnover

5

Experience certificates for similar LED luminaire supply/installation

6

OEM authorization (if applicable)

7

Technical compliance certificates (IS 10322 BIS II if available)

8

Bid security / EMD payment proof of ₹70,000

9

Detailed Design Drawings submission in 5 days post-award

10

Any statutory clearance certificates if required

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for LED luminaire tender in Uttar Pradesh 2026?

To bid, submit the EMD of ₹70,000, GST details, and turnover proof for the last three years, along with Detailed Design Drawings within 5 days of award. Ensure IS 10322 (Part 5/Section 3) BIS II compliance and provide OEM authorizations if required. Final bid should include supply, installation, testing, commissioning and training costs.

What documents are required for LED street light bid in UP?

Required documents include GST certificate, PAN card, audited financial statements, turnover calculations for three years, experience certificates, OEM authorization, and EMD proof of ₹70,000. Also include Technical compliance certificates and Detailed Design Drawings plan within 5 days post-award.

What are the key technical standards for UP LED luminaires?

Bidders must conform to IS 10322 (Part 5/Section 3) under BIS Scheme II. Provide evidence of ISI/BIS compliance and ensure LED efficacy and system wattage meet specified performance parameters. Include testing and commissioning as part of scope.

When is the design approval deadline after award for UP LED tender?

Design Drawings must be submitted within 5 days of award. The buyer will approve or list modifications within 5 days; delays by the buyer may push delivery without LD, but bidders must plan for this timing.

What is the scope of supply for the UP LED tender?

Scope includes supply, installation, testing, commissioning and operator training, plus any required statutory clearances. Price should include all costs; GST considerations apply, with reimbursement as per actuals or applicable rates, whichever is lower.

What is the quantity variation permitted in UP LED bid?

Contract allows up to 25% variation in ordered quantity at the time of placement and during contract currency, calculated on original quantity with minimum 30 days extension if needed.

What financial criteria must UP bidders meet for turnover?

Bidders must show minimum average annual turnover over the last three years as indicated in the bid document, supported by certified audited balance sheets; non-liquidation status must be declared via undertaking.

How is GST handled for UP BIS II LED procurement?

GST is to be checked by the bidder; reimbursement will be as per actuals or applicable rates, whichever is lower, capped by the quoted GST percentage in the bid.

Similar Tenders

5 found
Urgent

LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS

Nagar Palika Parishad Shahganj Jaunpur

📍 JAUNPUR, UTTAR PRADESH

EMD: ₹12,640
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

E-municipalities Uttar Pradesh LED Luminaire Road Street Light IS 10322 Part 5 BIS II 2026 Tender

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

📍 GORAKHPUR, UTTAR PRADESH

EMD: ₹78,180
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

E-municipalities Uttar Pradesh LED Luminaire Tender IS 10322 Part 5/Section 3 V3 BIS Scheme II 2026

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

📍 GORAKHPUR, UTTAR PRADESH

EMD: ₹79,760
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

Nagar Panchayat Kusmara Mainpuri LED Luminaire Tender IS 10322 IS 10322 (Part 5/Section 3) BIS II 2026

Nagar Panchayat Kusmara Mainpuri

📍 MAINPURI, UTTAR PRADESH

EMD: ₹25,310
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

UP Urban Development LED Luminaire Tender Firozabad IS 10322 Part 5 Section 3 V3 2026

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

📍 Firozabad, UTTAR PRADESH

Est: ₹1.5 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM