RO Plant with Genset and Trolley
Panchayati Raj Department
PURNIA, BIHAR
Bid Publish Date
24-Jun-2026, 9:56 am
Bid End Date
04-Jul-2026, 11:00 am
Location
Progress
Quantity
3
Bid Type
Two Packet Bid
Panchayati Raj Department Bihar invites bids for a RO Plant with Genset and Trolley under the government procurement framework. The contract scope includes water purification equipment with on-site installation at multiple village schools across Samastipur district, Bihar. The tender specifies warranty on spare parts and on the entire unit, with option-driven quantity adjustments up to 25% during contract execution. The procurement emphasizes adherence to approved Detailed Design Drawings and delivery timelines linked to original orders. The absence of a BOQ suggests a fixed-configuration supply aligned to the approved drawings and site locations. The unique clause highlights field installation commitments at ward-level educational facilities, with design approvals pending post-award. This tender targets suppliers capable of end-to-end fabrication, supply, and commissioning following buyer-approved specifications.
Product: RO Plant with Genset and Trolley
Warranty: On spare parts and entire item (full unit warranty)
Delivery sites: Ward 05 (Shrirampur), Ward 02 (Purandhahi), Ward 01 (Maheshwara), GPR-BHATAURA, Samastipur, Bihar 848117
Drawing approvals: 5 days post-award; modification list within 5 days
Quantity flexibility: Up to 25% increase/decrease during contract
GST: Responsibility on bidder; reimbursement or adjustment per actuals or lower rate
Life cycle: 1-year residual market life for bid products; not end-of-life by OEM
BOQ: No items listed; scope tied to approved drawings and site installation
Option clause allows up to 25% quantity variation and extended delivery with proportional time
Approval of Detailed Design Drawings required within 5 days; modification list within 5 days
Delivery and installation at specified ward locations in Samastipur district, Bihar
GST applicable; reimbursement as per actuals or lower quoted rate; no fixed upfront percentage provided
Delivery starts from last date of original delivery order; extended period based on increased quantity with minimum 30 days
LD details not disclosed; delays in drawing approvals impact delivery timeline without LD explicitly stated
Not in liquidation, not under court receivership or bankruptcy
Not declared end-of-life by OEM within 1-year residual market life
Capability to supply RO plant with genset and trolley and complete on-site installation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RO Plant with Genset and Trolley (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Panchayati Raj Department
PURNIA, BIHAR
Panchayati Raj Department
PURNIA, BIHAR
Panchayati Raj Department
PURNIA, BIHAR
Buxar District Panchayats
BUXAR, BIHAR
Panchayati Raj Department
BHAGALPUR, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Warranty/Services | Warranty on spare parts | 12, 18, 24 Or higher |
| Warranty/Services | Warranty on whole items supplied | 1, 2, 3, 4, 5 Or higher |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for RO plant supply and installation
Financial statements demonstrating financial stability
EMD/Security deposit submission proof
Technical bid documents showing compliance with RO plant and Genset specs
OEM authorization or manufacturing capability certificates
Detailed Design Drawings and approval correspondence (post-award)
To participate, bidders must supply GST/PAN, experience certificates, financial statements, and OEM authorizations, plus Detailed Design Drawings within 5 days of award. Ensure compliance with warranty for spare parts and whole unit, and be prepared for 25% quantity variations. Follow the approved drawings and site installation requirements.
Submit GST certificate, PAN, experience certificates for water treatment equipment, financial statements, EMD proof, technical bid detailing compliance with RO plant and genset specs, OEM authorizations, and Detailed Design Drawings approved or prepared for buyer review.
Delivery starts after the original delivery order; extended time allowed for increased quantity with minimum 30 days. Installation occurs at Ward 05 Shrirampur, Ward 02 Purandhahi, Ward 01 Maheshwara in Samastipur, Bihar 848117, per approved drawings and site readiness.
The tender requires warranty on spare parts and on the entire RO plant system. Suppliers must honor warranty terms as per buyer’s approved drawings and ensure post-warranty support arrangements, with clear replacement parts timelines.
Within 5 days of award, submit Detailed Design Drawings for buyer approval. The buyer will approve or provide a modification list within 5 days; delays shift delivery timelines and may avoid LD if caused by buyer’s approval timeline.
Bidders must verify GST; reimbursement will be as per actuals or applicable rates, whichever is lower, limited to the quoted GST percentage. No buyer responsibility for GST calculations beyond stated terms.
Yes, up to 25% of the contracted quantity may be added during execution. The delivery period extends according to the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Installations target Ward 05 Shrirampur, Ward 02 Purandhahi, Ward 01 Maheshwara within GPR-BHATAURA, Samastipur district, Bihar 848117, aligned to approved designs and site readiness.
Panchayati Raj Department
📍 BHAGALPUR, BIHAR
Madhepura District Panchayats
📍 MADHEPURA, BIHAR
Madhepura District Panchayats
📍 MADHEPURA, BIHAR
Madhepura District Panchayats
📍 MADHEPURA, BIHAR
Madhepura District Panchayats
📍 MADHEPURA, BIHAR
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS