BLOWER ASSY,ENGINE MOUNTING REAR,FILTER ASSY,SHEET CELLULAR,BTY LEAD 4MM,PLYWOOD 8X4,JOINT EXTENSIO
Indian Army
AMRITSAR, PUNJAB
Bid Publish Date
10-Jul-2026, 9:03 am
Bid End Date
20-Jul-2026, 3:00 pm
Location
Progress
Quantity
59
Category
Stator Assy
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks supply of multiple mechanical and structural components including stator assembly, rectifier assembly, fuel pipe, leather cloth (black), sheet cellular 25mm thick, general purpose plywood, and cotter split steel pins. The BoQ lists 7 items with no explicit quantities or units, indicating a broad procurement scope. The buyer reserves a 25% quantity variation during contract placement and currency, with delivery timelines tied to last date of original and extended orders. This flexible option clause shapes risk and pricing for bidders.
Option Clause enables ±25% quantity variation during contract and currency
Delivery period adjustments depend on increased quantity with minimum 30 days
No explicit EMD, value, or delivery schedule published; bidders must align with standard military procurement norms
Not specified in tender data; bidders should be prepared to adhere to standard Indian Army payment practices for supply contracts
Delivery periods align with last date of original order and extended period; additional time = (increased quantity / original quantity) × original delivery period, min 30 days
Not specified in the data; bidders should anticipate standard LD provisions in final contract
Experience in supplying mechanical components incl. electrical and ferrous/non-ferrous items
Capability to furnish OEM authorizations or manufacturer certifications relevant to listed items
Financial stability evidenced by turnover or financial statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Stator Assy , Rectifier Assy , Fuel Pipe , Leater Cloth Black , Sheet Cellular 25mm Thick , Plywood General Purpose , Pins Cotter Split Steel
Pre-Bid Date
10-07-2026 14:00:00
Pre-Bid Venue
ALL VENDORS ARE REQUESTED TO ATTEND THE PRE BID INTERACTION ALONGWITH SAMPLE OF ITEM AT UNIT LOCATION ON GIVEN TIME IF NOT ATTEND THE SAME THE VENDOR SHALL BE DISQUALIFIED
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Pithoragarh
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Pithoragarh | Pithoragarh | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
AMRITSAR, PUNJAB
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
Indian Army
KAPURTHALA, PUNJAB
Tender Results
Loading results...
Stator Assy
Stator Assy
Rectifier Assy
Rectifier Assy
Fuel Pipe
Fuel Pipe
Leater Cloth Black
Leater Cloth Black
Sheet Cellular 25mm Thick
Sheet Cellular 25mm Thick
Plywood General Purpose
Plywood General Purpose
Pins Cotter Split Steel
Pins Cotter Split Steel
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Stator Assy | Stator Assy | 1 | nos | mohan@313 | 15 | |
| 2 | Rectifier Assy | Rectifier Assy | 1 | nos | mohan@313 | 15 | |
| 3 | Fuel Pipe | Fuel Pipe | 4 | nos | mohan@313 | 15 | |
| 4 | Leater Cloth Black | Leater Cloth Black | 41 | mtr | mohan@313 | 15 | |
| 5 | Sheet Cellular 25mm Thick | Sheet Cellular 25mm Thick | 4 | sqm | mohan@313 | 15 | |
| 6 | Plywood General Purpose | Plywood General Purpose | 4 | nos | mohan@313 | 15 | |
| 7 | Pins Cotter Split Steel | Pins Cotter Split Steel | 4 | pkt | mohan@313 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates showing previous supply of similar mechanical components
Financial statements or turnover evidence
Any OEM authorizations or credentials relevant to stator/rectifier assemblies and related items
Technical bid documents outlining capability to supply sheet cellular material, plywood, leather cloth, and fasteners
EMD documents if required by the organization at bid submission
Any quality certifications applicable to military procurement
Bidders should prepare corporate credentials (GST, PAN), experience certificates for similar supplies, and financial statements. The tender includes seven items with a quantity variation option up to 25%. Ensure OEM authorizations are included and anticipate standard Army payment terms; confirm delivery timelines per original and extended periods.
Submit GST, PAN, and experience certificates; provide financial statements; include OEM authorizations for stator/rectifier assemblies and fasteners. Include technical bid detailing capability to supply leather, plywood, and sheet materials. Attach any quality certifications relevant to military procurement.
Delivery terms allow ±25% quantity variation at contract award and during currency. Additional time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days. The original delivery timeline governs extended deliveries.
No explicit standards listed; bidders should demonstrate capability for mechanical assemblies and sheet materials. Include OEM authorizations and prior military supply experience. Prepare to comply with standard Army procurement quality controls and inspection regimes.
The tender data provided does not specify a deadline. Bidders should monitor official Army procurement portals and contact the procurement cell for the exact bid submission date, ensuring readiness of all documents and pricing in line with the 25% option clause.
Demonstrate prior experience in supplying electrical/mechanical assemblies, provide financial stability, present OEM authorizations for relevant items, and show the ability to deliver multiple items including leather cloth, plywood, and fasteners. Ensure GST/PAN compliance and quality management credentials.
The scope includes stator assembly, rectifier assembly, fuel pipe, black leather cloth, 25mm thick cellular sheet, general-purpose plywood, and cotter split steel pins. The BOQ lists seven items, though individual quantities are not specified in the data provided.
Submit OEM authorization letters, manufacturer certificate, and any distributor agreements proving authorization to supply stator/rectifier assemblies and fasteners. Attach product datasheets and compliance statements to demonstrate product authenticity and eligibility.
Indian Army
📍 ALLAHABAD, UTTAR PRADESH
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 JALANDHAR, PUNJAB
Indian Army
📍 LEH, JAMMU & KASHMIR
Indian Army
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS