• Supply of 11KV/22KV UG XLPE cables (to be supplied by DGVCL) and straight-through joint kits (to be supplied by the contractor).
• Laying of underground cables in designated areas as per technical specifications.
• Testing and commissioning of installed cables to ensure compliance with standards.
• Erection and maintenance of overhead HT/LT lines, including dismantling of existing poles and transformer centers.
• Construction and installation of transformer center structures.
• Implementation of cable terminations and straight-through joints.
• Dismantling of poles, transformers, and overhead line components.
• Adherence to safety standards and quality assurance protocols.
| Key Deliverables |
Specifications |
| Cable Supply |
11KV/22KV XLPE cables |
| Cable Joints |
Straight-through joint kits |
| Overhead Line Erection |
HT/LT lines, poles, transformer structures |
| Testing & Commissioning |
Compliance with technical standards |
- Preparation and planning of cable laying.
- Supply of cables and joint kits.
- Installation of underground cables.
- Testing and quality checks.
- Erection of overhead lines and structures.
- Dismantling of old infrastructure.
- Final commissioning and handover.
| Technical Specifications |
|----------------------------|------------------------------|
| Cable Voltage Rating | 11KV/22KV |
| Cable Type | XLPE |
| Conductor Material | Copper |
| Insulation Thickness | As per IEC standards |
| Operating Temperature | Up to 90°C |
| Minimum Bending Radius | 12 times cable diameter |
• All work must comply with relevant IS standards.
• Proper safety measures must be followed during installation.
• Testing should include insulation resistance, continuity, and dielectric strength.
• Final acceptance will be based on successful testing and inspection.