โข Erection and Replacement of HT and LT Lines: Perform installation and replacement of high tension and low tension power lines as per technical specifications.
โข Transformer Erection and Maintenance: Install, replace, and maintain transformers to ensure uninterrupted power supply.
โข Disaster Response Line Work: Conduct all necessary line work during disaster situations, including repair, maintenance, and emergency line restoration.
โข All Types of Line Work: Cover all related line work, including pole replacement, line tightening, and safety checks.
โข Sequential Process:
- Site assessment and planning.
- Mobilization of equipment and materials.
- Execution of line erection/replacement.
- Testing and quality checks.
- Final inspection and handover.
โข Specifications:
| Item |
Description |
| Line Type |
HT and LT lines |
| Material |
Conductors, poles, insulators as per standards |
| Safety |
Compliance with safety norms |
| Documentation |
Completion reports, safety certificates |
โข Quality Assurance: All work must adhere to the technical standards specified by PGVCL and relevant electrical safety norms.