TenderDekho Logo
Open Power and Energy NPROCURE

Government Electrical Works Tender in Surat | DGVCL Turn-key Electrical Project

Bid Publish Date

24-Dec-2025, 6:00 pm

Bid End Date

02-Mar-2026, 6:00 pm

Progress

Issue24-Dec-2025, 6:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Power and Energy

Tender Fee

₹11,800

Contract Form

Turn-key

Completion Period

As per tender Document Attached

Currency Type

Single

Categories 30

This government tender offers an excellent opportunity for experienced electrical contractors to undertake a comprehensive electrical infrastructure project for DGVCL in Surat. The project involves turn-key electrical works, including cable laying, transformer installation, and equipment setup, to enhance power distribution reliability. Bidders must meet strict eligibility criteria, submit technical and financial proposals, and adhere to specified timelines. The tender emphasizes technical excellence, safety compliance, and timely completion. With detailed specifications and a clear evaluation process, this project aims to support Surat's growing energy needs and infrastructure development. Suitable for firms specializing in high-voltage systems, cable laying, and electrical installation, this tender is a strategic opportunity to contribute to public power infrastructure and expand your project portfolio.

Scope Of Work

The scope of work includes:

  • Erection and commissioning of electrical infrastructure as detailed in the tender documents.
  • Laying of LT and HT cables with specifications outlined in the provided technical documents.
  • Installation of transformers, RMUs, and associated equipment per technical standards.
  • Earthing and lightning protection as per the drawings.
  • Construction of plinths, cable trenches, and supporting structures.

The process involves:

  1. Preliminary site survey and assessment.
  2. Material procurement as per specifications.
  3. Execution of cable laying and equipment installation.
  4. Testing, commissioning, and handover.

Key deliverables include detailed project timelines, quality assurance reports, and compliance certificates. The project must meet all safety and technical standards specified in the tender documents, including the technical specifications for cables, transformers, and other electrical components.

Technical Specifications

The technical specifications include:

Component Specification
LT Cable Cross-linked Polyethylene (XLPE), 3-core, 95 mm², conforming to IS 1554 (Part 1)
HT Cable 11 KV XLPE, as per IS 7098 (Part 1)
Transformers Capacity: 500 KVA to 1250 KVA, with efficiency standards as per IEC 60076
RMUs Indoor/outdoor, conforming to IEC 62271-200
Insulators Polymer type, withstand voltage as per IS 731

The installation process involves sequential steps:

  1. Material Inspection and Verification
  2. Site Preparation and Foundation Work
  3. Equipment Installation and Wiring
  4. Testing and Commissioning

All technical components must adhere to the detailed specifications provided in the tender documents linked below.

Financial Requirements

The estimated project budget ranges between INR 50,00,000 and INR 1,00,00,000, depending on the scope and scale of work. The financial breakdown includes:

Cost Element Estimated Cost (INR)
Material Procurement [Specify amount]
Labour and Installation [Specify amount]
Testing and Commissioning [Specify amount]
Contingencies [Specify amount]

Payment terms are structured as follows:

  • Advance Payment: 10% upon contract signing
  • Progress Payments: Based on milestones achieved
  • Final Payment: 10% after successful completion and acceptance

All payments are subject to submission of valid invoices and certification of work completion as per contract terms.

Documents 79

1.2_LT_Cable_Spec_with_laying .pdf

TENDER_DOCUMENT

1.6.Earthing. Drawing GPRD-16 and 17.pdf

TENDER_DOCUMENT

1-AAA-Conductor.pdf

TENDER_DOCUMENT

2-MS-Beam-Technical-Specification-9-and11-Mtr.pdf

TENDER_DOCUMENT

3-11-KV-XLPE-Cable-Specifications.pdf

TENDER_DOCUMENT

4-22-KV-XLPE-Cable-Specifications.pdf

TENDER_DOCUMENT

5-11KV-RMU-Tech-Spec.pdf

TENDER_DOCUMENT

6-22-KV-RMU-TECH-SPECS-DGVCL.pdf

TENDER_DOCUMENT

7-11KV-Polymeric-PIN-Insulator-Tech-Specificatio-and-GTP.pdf

TENDER_DOCUMENT

8. DGVCL-Tender Technical Specification for Material in Robust Network.pdf

TENDER_DOCUMENT

8-11KV-Polymer-Disc-Insulator-GTP-and-Tech-spec.pdf

TENDER_DOCUMENT

9 DGVCL-Tender Technical Specification for Material in Robust Network.pdf

TENDER_DOCUMENT

9-22KV-GI-Pin-GTP.pdf

TENDER_DOCUMENT

13_14_MS Beam_Tech Speci_9 and 11 Mtr.pdf

TENDER_DOCUMENT

97-98_2550_11KV 5 to 500kVA _Technical specifications and GTP of DTRs.pdf

TENDER_DOCUMENT

99-100_2522_22 KV Transformer_Tech.Speci.pdf

TENDER_DOCUMENT

A-2 HT Booting.pdf

TENDER_DOCUMENT

BOM_LT ABC 3CX95_Robust 3.0_FY 25-26.pdf

TENDER_DOCUMENT

BOM_LT ABC 3CX120_Robust 3.0_FY 25-26.pdf

TENDER_DOCUMENT

BOM_PSC Pole_Robust 3.0_FY 25-26.pdf

TENDER_DOCUMENT

BOM_RSJ Pole_Robust 3.0_FY 25-26.pdf

TENDER_DOCUMENT

DGVCL 11KV RMU Tech Spec.pdf

TENDER_DOCUMENT

Final _LT Feeder Pillar.pdf

TENDER_DOCUMENT

GPRD Cell Std Drawing TC RMU Plinth-623 DT-21.4.25 (1).pdf

TENDER_DOCUMENT

MVCC BoM.pdf

TENDER_DOCUMENT

plinth drawing for RMU and high rated TC_1.pdf

TENDER_DOCUMENT

Pre-Fabricated Plinth for Transformer R1 1250-KVA-RCC-STEEL.pdf

TENDER_DOCUMENT

Pre-Fabricated Plinth for Transformer_R1 500-KVA-RCC-STEEL.pdf

TENDER_DOCUMENT

R3_AAAC_MVCC Tech Spec with final Comments_submitted.pdf

TENDER_DOCUMENT

R5_AL 59 ACS_MVCC Tech Spec with final Comments_accepted .pdf

TENDER_DOCUMENT

Ratification of Draft TS LT ABC higher size_250814_173117.pdf

TENDER_DOCUMENT

REC DRAW.pdf

TENDER_DOCUMENT

REC STANDRD.pdf

TENDER_DOCUMENT

Revised FSP Technical Specification.pdf

TENDER_DOCUMENT

REVISED SPECIFICATIONS CSS.pdf

TENDER_DOCUMENT

RMU plinth Design 3 Way.pdf

TENDER_DOCUMENT

S-3_Technical Specification 800kVA-1000kVA and 1250kVA DTR.pdf

TENDER_DOCUMENT

Sample Plinth Design for CSS Plinth.pdf

TENDER_DOCUMENT

Sample Survey Report of SUE through GPR and EPL.pdf

TENDER_DOCUMENT

Scope of work for erection of HT.pdf

TENDER_DOCUMENT

Tech Spec_Smart CTC.pdf

TENDER_DOCUMENT

Technical Specification LT Cable.pdf

TENDER_DOCUMENT

Technical Specificatioof End Termination St. joint and HDPE Pipe.pdf

TENDER_DOCUMENT

UG Cable Scope of work.pdf

TENDER_DOCUMENT

7. Declaration of Authorised person and Confict of Interest.pdf

TENDER_DOCUMENT

6. Format of manufacturer authorization letter.pdf

TENDER_DOCUMENT

5. DGVCL PV Clauses (LT ABC_XLPE Cable_Transformer and Steel).pdf

TENDER_DOCUMENT

4. Summary of Robust_3.0_Schedule B Offer in Online Mode.pdf

TENDER_DOCUMENT

3. Tender_Robust_3.0_ITC and Conditions of Contract_Final_24.12.2025_Kadodara.pdf

TENDER_DOCUMENT

2. Final 24.12.2025 Tender_Robust_3.0_Notice_Kadodara.pdf

TENDER_DOCUMENT

KADODARA_B.O.Q_ROBUST 3.0_FY 2025-26_83.83 Cr.pdf

TENDER_DOCUMENT

Corrigendum-1 - Robust 3.0 Kadodara.pdf

TENDER_DOCUMENT

9. Revised_Corrigendum-2- Robust 3.0 KADODARA.pdf

TENDER_DOCUMENT

9.KADODARA_Feeder wise quantity_ROBUST 3.0_FY 2025-26_Sheet_12.pdf

TENDER_DOCUMENT

8 mtr_PSC Pole_Specs_Sheet-1.pdf

TENDER_DOCUMENT

10 mtr_PSC Pole_Specs_Sheet-1.pdf

TENDER_DOCUMENT

20-01-2026-PRE-BID-CLARIFICATIONS_Sheet-10.pdf

TENDER_DOCUMENT

22KV_CSS_Technical_Specifications_Sheet-3.pdf

TENDER_DOCUMENT

95 sq.mm LT ABC Erection BOM_Sheet-11.pdf

TENDER_DOCUMENT

120 sq.mm LT ABC Erection BOM_Sheet-11.pdf

TENDER_DOCUMENT

500KVA_22 KV Transformer_Tech.Speci_Sheet-2.pdf

TENDER_DOCUMENT

HD_Rigid_PVC_Pipe_Specification and GTP_Sheet-5.pdf

TENDER_DOCUMENT

MS Beam_GTP_9 and 11 Mtr_Sheet-6.pdf

TENDER_DOCUMENT

MS Beam_Tech Speci_9 and 11 Mtr_Sheet-6.pdf

TENDER_DOCUMENT

MV Cable_PV Clause_Final_Apr 23_Sheet-7.pdf

TENDER_DOCUMENT

MVCC_Final_PV-clause_Dec-22_Sheet-7.pdf

TENDER_DOCUMENT

PV Clause and IEEMA Circular with Formula for LT Cables__Sheet-7.pdf

TENDER_DOCUMENT

PV Clause with IEEMA Formule Dist-TRF_Revised_2021_Sheet-7.pdf

TENDER_DOCUMENT

Tech Spec 800kVA-1000kVA and 1250kVA 22kv DTR_Sheet-2.pdf

TENDER_DOCUMENT

Technical Specification for LT Cable termination_Sheet-4.pdf

TENDER_DOCUMENT

Technical Specification LT Cable Final_Sheet-4.pdf

TENDER_DOCUMENT

Technical Specification MSP and Fencing_Sheet-8 n 9.pdf

TENDER_DOCUMENT

Corrigendum-3 - Robust 3.0 Kadodara.pdf

TENDER_DOCUMENT

1.22KV_RMU_Technical_Specifications_Sheet_13.pdf

TENDER_DOCUMENT

2.Prebid Clarification sheet Corrigendum-4_Sheet_14.pdf

TENDER_DOCUMENT

3.Revised LT ABC Erection BOM _95sq.mm._Sheet_11.pdf

TENDER_DOCUMENT

4.Revised LT ABC Erection BOM _120sq.mm._Sheet_11.pdf

TENDER_DOCUMENT

5.Revised_22KV_CSS_Technical_Specifications_Sheet_3.pdf

TENDER_DOCUMENT

Corrigendum-4 - Robust 3.0 Kadodara.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

Bidders must meet the following criteria:

  • ✓ Must have valid GST Registration Certificate.
  • ✓ Must submit original receipts of tender fee payment via RTGS/NEFT/Online Payment.
  • ✓ Must provide original EMD payment receipt through RTGS/NEFT/Online Payment or Bank Guarantee.
  • ✓ Must submit relevant technical experience documents demonstrating successful completion of similar electrical infrastructure projects.
  • ✓ Must have a minimum average annual turnover of [specify amount] over the last three financial years, as detailed in the financial qualification table below.
Qualification Criteria Minimum Requirement
GST Registration Valid Certificate
Tender Fee Payment Receipt copy
EMD Payment Receipt or BG
Financial Turnover [Specify amount]
Technical Experience At least [number] similar projects

All documents must be duly certified and submitted within the specified deadlines to qualify for technical and financial evaluation.

Bidding Process

Process Timeline

1. PRELIMINARY STAGE

05-03-2026 11:00

2. TECHNICAL STAGE

12-03-2026 11:00

3. PRICE BID

25-03-2026 11:00

Required Forms

PRELIMINARY

Tender Fee RTGS/NEFT_Online Form

User Defined Template-Standard

Required

EMD DD/RTGS/NEFT/BG Form

User Defined Template-Standard

Required

TECHNICAL

Technical Stage

User Defined Template-Standard

Required

PRICE

Schedule B_Robust 3.0_Kadodara

User Defined Template-Secured

Required

Required Documents

Stage - PRELIMINARY STAGE

1

Scan copy of Original Receipt of Payment of Tender fee amount through RTGS/NEFT/Online Payment

Required
2

Scan copy of Original Receipt of Payment of EMD amount through RTGS/NEFT/Online Payment/BG

Required
3

Scan copy of GST Registration Certificate

Required
4

Copy of Cancelled Check

Required

Stage - TECHNICAL STAGE

1

Attach all required Documents as per Tender Documents

Required
2

Attach required Documents as per Tender Documents-1

Required
3

Attach required Documents as per Tender Documents-2

Required
4

Attach required Documents as per Tender Documents-3

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the deadline for bid submission?

The bid submission deadline is 16-01-2026 at 18:00 hours. Bidders must submit all documents before this time to be considered.

What documents are required to qualify for the tender?

Required documents include GST registration certificate, original receipt of tender fee payment, EMD payment receipt or BG, and experience certificates for similar projects. All documents must be certified and submitted within deadlines.

How will the evaluation of bids be conducted?

Bids will be evaluated based on technical compliance (60%), financial competitiveness (30%), and past project performance (10%). Minimum thresholds must be met for technical score and budget limits.

Are site visits allowed before submitting the bid?

Yes, site visits can be scheduled upon request. Bidders are encouraged to review project sites and technical documents available for download to prepare accurate proposals.

What is the scope of work covered in this tender?

The scope includes cable laying, transformer installation, earthing, and construction of supporting structures as detailed in the tender documents. All work must adhere to specified technical standards and safety protocols.

Similar Tenders

5 found

Site survey (including underground utility verification using GPR & EPL), design, engineering, procurement, supply, transport, installation, testing, commissioning and documentation for a turnkey based tender for conversion of the existing 11/22 kV HT overhead network to an underground cable system, with SCADA-compatible RMUs, removal of DO overhead system, higher-capacity transformer, SCADA-compatible compact substations (CSS) and overhead-to-underground LT network conversion using FSP/MSP in the ANKLESHWAR RURAL Division under DGVCL, and all associated works with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging

Dakshin Gujarat Vij Company Ltd. (DGVCL)

📍 SURAT, GUJARAT

⏰ Deadline: 3 weeks left
🛒 Type: Service
View NPROCURE

Site survey (including underground utility verification using GPR & EPL), design, engineering, procurement, supply, transport, installation, testing, commissioning and documentation for a turnkey based tender for conversion of the existing 11/22 kV HT overhead network to an underground cable system, with SCADA-compatible RMUs, removal of DO overhead system, higher-capacity transformer, SCADA-compatible compact substations (CSS) and overhead-to-underground LT network conversion using FSP/MSP in the NAVSARI CITY Division under DGVCL, and all associated works with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging

Dakshin Gujarat Vij Company Ltd. (DGVCL)

📍 SURAT, GUJARAT

⏰ Deadline: 3 weeks left
🛒 Type: Service
View NPROCURE

Site survey (including underground utility verification using GPR & EPL), design, engineering, procurement, supply, transport, installation, testing, commissioning and documentation for a turnkey based tender for conversion of the existing 11/22 kV HT overhead network to an underground cable system, with SCADA-compatible RMUs, removal of DO overhead system, higher-capacity transformer, SCADA-compatible compact substations (CSS) and overhead-to-underground LT network conversion using FSP/MSP in the NAVSARI RURAL Division under DGVCL, and all associated works with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging

Dakshin Gujarat Vij Company Ltd. (DGVCL)

📍 SURAT, GUJARAT

⏰ Deadline: 3 weeks left
🛒 Type: Service
View NPROCURE

Site survey (including underground utility verification using GPR & EPL), design, engineering, procurement, supply, transport, installation, testing, commissioning and documentation for a turnkey based tender for conversion of the existing 11/22 kV HT overhead network to an underground cable system, with SCADA-compatible RMUs, removal of DO overhead system, higher-capacity transformer, SCADA-compatible compact substations (CSS) and overhead-to-underground LT network conversion using FSP/MSP in the VAPI RURAL Division under DGVCL, and all associated works with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging

Dakshin Gujarat Vij Company Ltd. (DGVCL)

📍 SURAT, GUJARAT

⏰ Deadline: 3 weeks left
🛒 Type: Service
View NPROCURE

Site survey (including underground utility verification using GPR & EPL), design, engineering, procurement, supply, transport, installation, testing, commissioning and documentation for a turnkey based tender for conversion of the existing 11/22 kV HT overhead network to an underground cable system, with SCADA-compatible RMUs, removal of DO overhead system, higher-capacity transformer, SCADA-compatible compact substations (CSS) and overhead-to-underground LT network conversion using FSP/MSP in the VALSAD RURAL Division under DGVCL, and all associated works with GIS Mapping / Geo Urja Mapping (Developed by GUVNL) and Asset Tagging

Dakshin Gujarat Vij Company Ltd. (DGVCL)

📍 SURAT, GUJARAT

⏰ Deadline: 3 weeks left
🛒 Type: Service
View NPROCURE